Summary

In textronics engineering I developed electrical panels like power factor panel, power distribution panel, industrial ups cards and electronic cards repairing .designed electrical panels for interloop pvt ltd hafizabad and managing the installation of cable tray and cable laying , panel syncing cable designing , equipment requirement and parts inquiry and purchases in Benz maize pvt ltd Faisalabad.
I have been given charge from my seniors to complete the PAF (Pakistan air force ) CCTV installation project at 12 different bases in Punjab and KPK.and successfully completed the sites.
Now I am have been given a charge for design and installation of HVAC at Vision pharmaceutical Islamabad.

Projects

interloop dairy hafizabad
Benz maize product
PAF cctv installation project 2014-15

Experience

Company Logo
DESIGN engineer
Textroncs engineering lahore
Mar 2011 - Present | Lahore, Pakistan

TEXTRONICS ENGINEERING PVT LIMITED, LAHORE March 2011-Till Now
ENGINEER ELECTRICAL (SERVICES)
Installed 12 and maintained 45 UPS (10KVA~300KVA) in diverse industries.
Designed & manufactured 25 Power Distribution Panels, 4 LT Panels, 2 Power Factor Correction Panels, 7 ATS panels & more than 20 change overs.
Delivered services for troubleshooting and fault-finding in more than 25 industries.
Designed 3 Solar Systems for domestic units and 2 for small industrial units.
Installed SIEMENS, ABB and DANFOSS VFD (variable frequency drive) on
37 KW ~ 200 KW motors.
Automated multiple machines using PLC’s for advance response.
Siemens plc step 7-300 trouble shooting
Repaired more than 100 electronic cards.
Personally Managed the electronic equipment purchases and deliveries.
Documented multiple records of delivery.
Reported and updated Directors on daily basis.
Expertly performed preventative maintenance and calibration of equipment and systems, earning outstanding reputation for proficiency and quality.BENZ MAIZE PVT LTD, FAISALABAD
SITE ENGINEER ELECTRICAL (ERRECTION)
Designed the cable tray path for all the plan.
Manufactured the MCC panel, Distribution panels, Motor control panels.
Installation of MCC panels and termination of 185 mm cables with all standards.
Implemented the installation of cable tray and cable laying from main grid to all the MCC panels.
Designed and implemented the Earthing for the plant, panels and motors.
Termination of motors cables with all international standard use of SS pipes and flexible GI pipe.
Installation of 9 Mega watt generator steam turbine and Furnace oil boiler.
Synchronising of HT panels and cabling under my supervision.
HT panels and transformers termination with HT Kit.


INTERLOOP DAIRIES PVT LTD, HAFIZABAD
Designed all electrical panels for the dairy. (LT PANEL, Distribution panels, Power factor correction panels, Motor control panels)
Installation of 1000 W Search light

Company Logo
Junior engineer
PLASCO PACK pvt ltd
Aug 2009 - Feb 2011 | Hattar, Pakistan

PLASCO PACK PVT LTD, HATTAR August 2009-Feburary 2011
JUNIOR ENGINEER
Maintained and Repaired/Serviced all Electrical panels.
Checking every month and calibrate all the instruments used in the machines and factory.
Installation of VFD Motors and all the equipment under my supervision.
Repairing and maintenance of electrical panels on the machines.
Successfully repaired electronic boards and electronic display cards.

Education

International Islamic University
Bachelors, , Bachelors of Science(HONS.)‎
Power electronics
2009

Skills

Intermediate Import Operations Handling
Expert Installation and Software Configuration Skills
Expert Institutional Selling
Intermediate Inventory Planning Skills
Expert Loans - Personal
Expert Loans Business
Expert Pipeline Management
Expert Supplier Negotiation
Expert Trade Negotiation
Expert المعرفة الصيدلانية

Languages

Expert Punjabi
Beginner Spanish
Expert Urdu
Expert English

Junaid Contacts

Muhammad Siraj farooq
TeleTaleem Pvt Ltd