Summary

Reliable Mechanical Engineer seeking challenging position in process industry. Excellent problem-solving, communication and analytical skills, worked effectively with all levels of employees in cross-functional teams with strong relationship-building skills, requiring unwavering commitment towards profession, resultant to become an integral part of the organization.

Projects

Projects

Experience

Company Logo
Deputy Manager Mechanical And Projects
Flying Cement Company Limited
Dec 2022 - Present | Khushab, Pakistan


Key Responsibilities in Project Stage  Developed fabrication and erection bar charts, ensuring efficient project timelines.  Oversaw critical structure construction, including hoppers and transition pieces  Managed belt conveyors, screw conveyor and elevators for optimal performance.  Successfully installed bag filters, electrostatic precipitators, and major equipment (VRM, Kiln, Cooler). Key Responsibilities in Maintenance Stage  Coordinate and allocate manpower at the site, Operation and Maintenance.  Oversee pneumatic conveying systems (FK Pump airlift). Maintain rotary equipment (Kiln, Cooler, VRMs). Operate various pumps, compressors, fans, and blowers. Maintain vibrating screens, Roto packers, and truck loaders.  Handle pollution control equipment (Bag filters, Electrostatic precipitator, RABH).  Use vibration monitoring analysis. Coordinate with subordinates and other departments. Prepare maintenance schedules and manuals. ACHIEVEMENTS  Independently designed hoppers and structures, emphasizing effectiveness wear resistance. Considered material selection, load distribution, and flow dynamics.  Proficiently handled gearbox calculations, commissioning, ensuring safety factors met industry standard. Prioritized torque, load, and lubrication considerations.  Successfully commissioned an entire plant, including the vertical rolling mill, bag house, and cement silo system. Met planned timelines and avoided external FLS SMIDTHs expert costs i.e. 2000/day.  Implemented lean manufacturing practices, resulting in a 25 reduction in lead times. Identified process improvements and streamlined operations.  Developed and executed a preventive maintenance program, enhancing equipment reliability and reducing downtime by 40.

Company Logo
Assistant Manager Planning Mechanical Reliability And Workshop
Mughal Iron And Steel Mill Pvt Ltd
Dec 2021 - Dec 2022 | Lahore, Pakistan

Worked with following Tasks  Coordinate and execute recommended maintenance activities cost-effectively.  Create and update maintenance plans for shutdown activities.  Collaborate with stakeholders for major technical activities.  Utilize CMMS for planning, monitoring, and execution.  Assist in developing work packs. Ensure proper documentation and closure of maintenance work orders.  Manage project initiation, scoping, cost estimation, scheduling, and closure.  Coordinate resources while maintaining safety and housekeeping standards. ACHIEVEMENTS  Designed and implemented a cost-effective Pre Heating System, reducing energy consumption by 30.  Reduced production time by 20 and saved the company 100,000 annually through process optimization.  Ensured safety standards compliance while implementing a quality control system, reducing defects by 15  Enhanced existing heat exchanger design, resulting in a 10 efficiency increase.  Managed projects from concept to completion like EOT Crane, Preheating furnace, DC motor Coil Making Machine etc. Delivering high-quality products within budget and timeline. Developed a maintenance strategy, optimizing equipment reliability and reducing costs by 20.

Company Logo
Senior Engineer Reliability And Workshop
Master Tiles & Ceramic Industries Limited
May 2019 - Dec 2021 | Gujranwala, Pakistan

Worked as Workshop and Reliability Engineer and dealing with following Tasks  Supervise machining, welding, and fabrication activities for machinery parts and equipment. Explore modifications to existing machinery.  Devise maintenance strategies for reliability and safety.  Lead HR activities to maximize production output.  Command of SAP operating system ACHIEVEMENTS  Designed and implemented cost-effective heating and cooling systems where required for tile manufacturing facilities, optimizing energy consumption.  Enhanced the performance of kilns, presses, or other machinery, resulting in increased production efficiency by 30. Successfully managed tile production projects from concept to completion, meeting deadlines and budget constraints.  Developed preventive maintenance, minimizing downtime and maximizing equipment reliability.

Company Logo
Part Time Maintenance Engineer
United Textiles pvt ltd
Sep 2018 - Apr 2019 | Faisalabad, Pakistan

Worked as Maintenance Engineer at United Textile and practiced for Predictive Inspection, Maintenance and Scheduling of following Blow Room Fan Impellers, Tooth Segments, Gear Motors of Reciprocating Rollers, Drive Belts, Dust Extraction Sheets and Gear Boxes. Carding Section Carding Elements, Flat to Cylinder Setting, Suction Points and Cylinder Gas Kits. Unilap Section Wastes Suction Pipes and Pumps, top and bottom Rollers, Safety Switches, Pneumatic Switches, Lubrication of Gear Box. Comber Section Feed tables, Combs, Belt and Drives, Turning Table Chains Tension, Bearing and Bushes. Simplex Section Drafting Zones and Neck Bearings of Bottom Rollers. Auto-Coner Waxing Shafts, Pressure Forks, Cradle Sensors, Filters, Suction Arms and Cradles Vibration. ACHIEVEMENTS Ensured adherence to safety standards in complex design solutions. Increased equipment reliability by 25 with a preventive maintenance program Led successful launch of a new line, boosting capacity by 40. Improved product quality and customer satisfaction by reducing defects by 15.

Company Logo
Internship Engineer
Oil And Gas Development Company Limited
Jul 2018 - Aug 2018 | Islamabad, Pakistan

 Rig Maintenance Department OGTI Islamabad : Spent 3 weeks in rig maintenance department where repairs of rig parts is carried out.
 Rig N-1 at Soghri#3 : I spent one week at rig N-1, which is located at soghri#3 and Rig was in working position at that time. It was drilling up
to 1500 meters down into Earth.

Company Logo
Internship Engineer
United Motors Pvt Ltd
Jun 2017 - Sep 2017 | Lahore, Pakistan

4 months internship which was divided into eight parts, as follows:
 Quality Control Department : Learnt about ISO Standards applied for Quality of their manufactured products and the Vendors supplies.
 Engine Assembly Line : Gained knowledge about the Construction of Engine including Process of Punching, Engine Assembly, Leakage
Test and ComputerizedBenchTesting.
 Paint Shop :I learnt the painting process for Petrol Tanks.
 Shock Assembly Line: In this line I learnt about the Shock Absorbing process of Bikes followed by the assembly of Spring Shocks.
 CNC Machine Shop : In CNC Machine Shop (CMS) I studied about manual Lathes and CNC Machine operations, used to produce parts
like Crankcase of Engine, Front Hub and Back Hub. In this shop the testing of these parts was also carried out.
 Main Assembly Line : I understood about the whole assembly and final inspection process of motor bike before sending to the market.
 Final Inspection Test Bench : Explored different tests carried out for acceleration, speedometer, breaking system and wheel alignment.

Education

University of Engineering & Technology
Bachelors, Bachelors in Engineering, Mechnical Engineer‎
Mechanical Engineer
CGPA 3.27/4
2019

Skills

Expert 2D Drawaing
Expert 3D Creative Skills
Expert Analytical Skills
Beginner AutoCAD
Expert Basic Electrical Technical Foundations
Intermediate Beverage Knowledge
Intermediate Beverage Lines
Beginner BIM
Expert Client Dealing
Expert Computational Fluid Dynamics
Expert Computer Proficiency
Expert Conflict Management
Expert Costing Management
Expert Data Analysis
Expert Data Analysis and Simulation
Expert Design Software Command
Expert Drafting Skils
Intermediate Dyeing Skills
Intermediate Electrical Mechanical Troubleshooting
Expert Email List Management
Expert End to End Sales
Expert End To End Project Management
Expert Equipment Maintenance
Expert ERP Software Command
Expert Field Service Engineering
Expert Fleet Management
Beginner Foundry
Expert HVAC Maintaince
Expert Industrial Maintenance
Expert International Development Business
Expert Interpersonal Skills
Expert Leadership
Expert Leadership Skills
Expert Line Maintenance
Intermediate Maintenance Engineer
Expert Maintenance Management
Expert Maintenance Supervision
Expert Manufacturing Process
Intermediate Market Research
Expert Mechanical Skills
Expert Mechanical Assembly
Expert Mechanical Drawing
Beginner Mechanical Drawings
Expert Mechanical Inspection
Expert Mechanical Products Knowledge
Expert Mechanical Skills
Expert Mechanical System Up gradation
Beginner Mechanical Work
Expert MEP Engineering
Expert Microsoft Outlook

Languages

Expert Urdu
Expert English