Summary

B.E Electrical Engineering from Mehran University of Engineering and Technology Jamshoro.
Top-performing, strategic-thinker with more than seven years of experience in project management. Adept at coordinating internal resources and third parties to ensure flawless execution of assigned projects.

Experience

Company Logo
Project Manager
Abbas Steel Group
May 2016 - Present | Karachi, Pakistan

Designing ,installation ,Erection,Commissioning and sucessful operation of 15Ton Induction furnace,R6CCM ,Pump House,Over Head Cranes,Gantry Cranes,slag processing plant,Scrap yard and shearing machine following duties are performed:

Applying appropriate project management standards for incorporation in managing the production of the handrequired deliverables.

Planning and monitoring the project adopting any delegation and use of project assurance roles within agreed reporting structures preparing and maintaining Project Stages exception plans as required.

Managing the project risk, ensure that work is neither overlooked nor duplicated
monitoring overall progress and use of resources, initiating corrective action where necessary

Managment processes reporting through agreed lines on project progress .

Applying appropriate technical and quality strategies and standards, identifying and obtaining support and advice required for the management,

planning and control of the project managing ,project administration, conducting a project evaluation review to assess how well the project was managed preparing any follow-on action recommendations.

Company Logo
Electrical Manager
Abbas Steel Group
Aug 2015 - May 2016 | Karachi, Pakistan

Supervise and monitor the progress of all types of routine, breakdown and planned maintenance activities, so as to minimize down time for the equipment for increased plant availability
Monitoring and managing electrical day and night shifts.
Prepare overhaul work details for Electrical Equipments.
Specify system components or direct modification of products to ensure conformance with engineering design and performance specifications.
To order plant spares and set track stock level so as to avoid shortage of spares during major overhaul of the plant for increased plant availability
Responsible for providing monitoring troubleshooting solutions for Electrical Power, Control and Instrumentation equipments in case of sudden system breakdown during plant operation, ensuring minimum time utilization for troubleshooting.
Investigate equipment failures and difficulties to diagnose faulty operation, and to make recommendations to maintenance crew.
Check daily electrical work report prepared by shift incharges and discuss in detail. Co-ordinate discuss with melt shop production team in case of any sudden fault during production.
. Co-coordinating the procurement of electrical materials and equipment.
Develops project schedules assigning cost and manpower to the schedule and provide manpower forecasting.
Completes electrical projects by supervising installations resolving design issues
Monitoring sub-contractors to ensure guidelines are maintained.
Maintain monthly daily unit consumption report.
Preparing monthly Progress reports.
Daily report to Factory Manager and detail meeting regarding electrical works.
To suggest to my directors about the improvements on the system, better ideas for doing job or part of it through daily or weekly meeting.
Keep contact with other departments to solve problems involved in energisation of

Company Logo
Assistant Manager Electrical
Abbas Steel Group
Dec 2013 - Aug 2015 | Karachi, Pakistan

• Performed monitoring, controlling and switching of the company power system during normal and emergency operation conditions 3.3 KV, 6.6 KV, 11 KV & 132 KV systems
• Studied protection schematic drawings. e.g. Short circuit, Over current, Earth fault (IDMT), Under voltage, Over voltage, Under frequency, Over frequency, Differential protection for transformers, motors and generators, Reverse power etc

• Executed high voltage testing of electrical equipment’s (Circuit breakers, cables, bus bars etc.) after repair and maintenance, and to ensure the compliance of safety procedures regarding work as mentioned in the work order / PTW
• Carrying out inspection tests and troubleshooting of 132KV SF6 circuit breaker CT, PT and for servicing and taking effective steps for it.
• HIPOT testing for H.V and L.V cables
• Monitor and record the energy meter readings.
• Job involves Maintenance and Instrumentation of Electrical and Electronic Panels of Electric
Arc Furnaces and Ladle Refinery Furnace.
• Troubleshooting Identification and Solving the Faults of Induction Furnaces, Continuous
Casting Machines and Overhead Cranes.
• Maintenance of 12MVA Ultra High Power (UHP) Transformer of EAF and Maintenance of
2500KVA Transformer of LRF.
• Carried out trouble shooting for protection trips, faults & upsets of electrical equipment’s
(Generators, Transformers, and Motors etc.)
• Studied schematic drawings with different system interlocks for motors, generators, transformers and feeders.
• Performed preparation work of tender documents, technical evaluation and load calculations, selection of transformers, generators, circuit breakers, cables, ballasts and mercury & sodium bulbs.
• Maintained narrative log of all events occurring in the assigned functional area and prepared data tabulations.
• Testing and troubleshooting of inverters of Siemens, Schneider and Allen-Bradley.

Company Logo
Project Engineer
Abbas Steel Group
Sep 2012 - Dec 2013 | Karachi, Pakistan

Erection and commissioning of :
 132KV grid station
 H.V and L.T cable laying and termination.
 Two units of 10Ton Induction furnace
 15Ton Electric Arc Furnace
 R4CCM
 Pump House
 Wire drawing
 Dedusting Plant.

• Installation of H.V switchgears. One 50MVA, two 3000KVA,two 8000KVA and 12000KVA transformer ,LV Panels with complete accessories (CTs, PTs, and Protection Relays etc.) for 440V and 11 KV system manufactured by M/s ALSTOM and AREVA

• Installation of FC panels F3, F4, F5, F7, F11 at grid station with capacitors, inductive coil and surge
Arrestors.

• Cable lying and termination of Al/xlpe/awa/pvc&Cu/xlpe/awa/pvc H.T cables upto size 800sqmm
manufactured by Newage and Pakistan cable.

• Cable lying and termination of Al//awa/pvc,Cu/pvc/pvc L.V cables upto size 630sqmm manufactured
by Newage and Pakistan cable.

• Installation and commissioning of H.V switchgear PLC based L.V panels with HMI and control desk.

• Installation of power panels, star delta based control panes and pump’s motors (132kw, 110kw,
55kw, 22kw, 15kw).
• Installation lightnining of 150 meter yard with HPIT lights.

• Installation of H.V switchgears, 11kv Induction Motor, L.V panels and compressor with all accessories
(solenoid valve, vibrator, ladle trolley, and charging trolley)

Company Logo
Trainee Engineer
Abbas Steel Group
Apr 2012 - Sep 2012 | Karachi, Pakistan

Duties & Responsibilities:-
• Responsible for the hands-on management of all electrification work at site.
• Responsible for the hands-on management of all electrification work at site.
• Making the daily reports of project activities done at site.
• To verify and implement the job as per drawings.

Education

Mehran University of Engineering & Technology
Bachelors, , Bachelors of Engineering‎
TROUBLE SHOOTING SKILLS AND PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENTS
Percentage 71%
2011

Skills

Expert Ability to attend foreign Deligations
Expert Ability to give altenate solution
Expert Ability to handle Plant in Emergency
Intermediate Ability to Make quick right Decision
Expert ability to Motivate team
Expert Ability to Plant technical Managment
Expert Ability to run Plant with less Man Power
Expert ability to work under presure
Expert Contract Management
Expert Cooordination Skills
Expert Customer Service Systems
Expert Electric Power Management
Intermediate Electrical Controls Designs
Expert Electrical Layouts
Expert Electrical Products
Expert Excellent In Business Writing Skills
Expert Mechanical System Upgradation
Expert Minimum 8 -10Years Experience
Expert Procurement
Expert Project Implementation
Expert Project Management Methodologies
Intermediate Proposal Drafting
Expert Purchasing
Expert Receptionist Duties
Expert Self Starter
Expert Strategy and Planning
Expert Technical Analysis
Expert Technical Product Specialties
Expert Tools Command

Languages

Expert Urdu
Intermediate Sindhi
Expert Punjabi
Expert English