Summary

Graduate Civil Engineer with challenging and target oriented approach. Maintained high grades in education and in professional life. Eager to learn from senior and become a part of the team through professional competencies and flexible nature.
Have worked in difficult terrains of the country including KPK remote areas with successful completion of the projects.
I always keep myself ready for the difficult projects with learning attitude all the time.

Projects

Home Textile (Stitching Unit)
Godowns In Roomi Spinning
Dialysis Unit Nishtar Hospital
Beacon House School Extension
Roomi Spinning Extension
Avari Express Multan
GSU Foundation

Experience

Company Logo
GM Civil
Masood Roomi Group
Feb 2023 - Present | Multan, Pakistan

Dealing with Following Textile Units:
1. Masood Fabrics (Spinning and Weaving)
2. Roomi Fabrics (Spinning and Weaving)
Projects are:
1. 1.4 MW Solar 
2. 2.9 MW Solar
3. Feasibility for Polyester Cotton Unit
4. Insurance Related Matters
5. Maintenance Jobs

Company Logo
Head of Civil and PEB
Hyundai Nishat Motors (Pvt) Ltd
Jun 2020 - Feb 2023 | Faisalabad, Pakistan

· Successful completion of Main Mill Building Project of 920 million. This was being the test by HNMPL Management to prove my capabilities and command on the work. The final submitted bill took a long period of 07-months in verification and correspondence.
· 3600 SQM Warehouse (Civil & PEB) in less than 100 Days.
· TCF (Trim Chassis, Finish) line (2700 SQM) Extension in 180 Days including sub-floor services (Civil & PEB).
· Completion of Plastic Paint Shop, Paint Storage Facility and Parts Warehouse in 210 - days. (Civil, PEB, Double T Roofing) with soil replacement method and dewatering.
· Extension of Main Paint Shop (3000 – SQM) in 180 - days. (Civil & PEB) with piles foundations.
· Centralized Substation (Double Story) Building. RCC Structure with soil replacement.
· Development of Motor Pool Area of 10,000 and then 17,000 SQM with subbase filling and compaction. Used excavated material to save the cost.
· Warehouse Extension (Phase – II) 7200 SQM in 210 - days. Strip Foundations.
· Canteen, Locker and Masjid, RCC Frame Structure in 255 - Days.
· Rehabilitation of old loom shed for Warehouse to store spare parts.
· Construction of Hostel Complex and Approach Roads with an estimated cost of 650 Million.
· Design, BOQ, Drawings and schedule reviews and revisions as per site requirements.
· Budgeting for CAPEX and OPEX Project and monthly forecasting of material and contractor payments.
· Best utilization of the resources, continuous improvement plan for the colleagues through trainings and supportive working environment.
· Liaison with consultant and contractor through coordination meetings on weekly basis.  

Company Logo
GM Civil
Roomi Fabrics, Mahmood Group
May 2018 - Jun 2020 | Multan, Pakistan

1. Completed Dialysis Unit

2. Completion of EB - 4 (Yarn Godown) with 13750 SFT Covered Area RCC Structure

3. Roomi Spinning Mill Extension with 80,000 SFT Covered Area RCC Structure

4. Beacon House Extension with Covered Area 42000 SFT RCC Frame Structure

5. Avari Express Hotel

6. Quilting Unit

7. Cotton Godowns (05 - NO)
8. Home Tex Stitching Unit
9. Towel Stitching Unit

Upcoming Projects include:

1. Metro Cash & Carry

2. Hyundai Show Room

Company Logo
DM - Engineering
Lalpir Powers
Mar 2011 - May 2018 | Mehmood Kot, Pakistan

Recently completed the Contractor's Offices and Mess Facility on labor rates (First Time in Lalpir Power Limited) from scratch to finish including the space design and using the available material.

Managing all kind of Civil Works of new and existing structures from scratch to finish.

Also a member of Social Responsibility Committee where we plan and execute the small welfare projects for the community education, health and Infrastructure.

Company Logo
Project Coordinator Deputy Director
Punjab Education Founsd
Aug 2010 - Mar 2011 | Lahore, Pakistan

Punjab Education Foundation Main Head Office Building
Bidding
Selection of Contractor according to PPRA and PEC Regulations
Review of Design and Approvals from respective departments like LDA, EPA etc.

Company Logo
Deputy Director
Punjab Education Foundation
Aug 2010 - Mar 2011 | Lahore, Pakistan

• Successful bidding and post bidding evaluation of the contractors.
• Close Coordination with the consultant for the designing of multistory head office building for PEF keeping in view the today’s security, Safety and office requirements of CCTV Cameras, Fire Fighting System, Internet and HVAC.
• Approval of the design, BOQ, Cost Estimates, Pre-qualification of firms from Construction Committee of Board of Directors and from Board of Directors of PEF-Lahore.
• Pre-Qualifications, Bidding and Post Qualification of the bidders taking board of directors in confidence and according to the PPRA-Punjab and PEC-Rules.
• Dealt with LDA and EPA-Punjab on NOC issues. SNGPL and WAPDA for the temp and permanent connections of gas and electricity.

Company Logo
Deputy Director/Project Coordinator
Punjab Education Foundation
Aug 2010 - Feb 2011 | Lahore, Pakistan

Successfully complete the bidding process and contractor selection for PEF Head Office Building with approval from the Board of the Directors.

Company Logo
Project Engineer
Sheladia Associates Inc. USA
Jan 2010 - Jul 2010 | Peshawar, Pakistan

Lead the team of Site Staff and successfully completed the up gradation project of schools in Peshawar City.

Education

NWFP University of Engineering & Technology
Bachelors, Bachelors in Engineering, B.Sc (Hons)‎
Civil Engineering
Percentage 79%
2000
Multan Board
Intermediate/A-Level, , F.Sc Pre-Engineering‎
Percentage 73%
1994
Multan Board
Matriculation/O-Level, , Matric in Science‎
Percentage 80%
1992

Skills

Intermediate Infrastructure
Intermediate roads
Intermediate Admin Management
Intermediate Analytical Skills
Intermediate Aseptic Technique Knowledge
Expert Civil Design Knowledge
Expert Civil Drafting
Expert Civil Management
Intermediate Communication Skills
Intermediate Concrete Material Knowledge
Intermediate Configuration Switches
Expert Construction Cost Control
Expert Construction Engineering
Expert Construction Knowledge
Expert Construction Management
Intermediate Construction Planning
Intermediate Construction Site Management
Expert Designing & Execution of Building
Expert End to End Sales
Expert End To End Project Management
Intermediate Financial and Budgeting Skills
Expert Handling Assignments
Intermediate Irrigation Knowledge
Intermediate Land Contracts
Intermediate LTN
Expert Maintenance Management
Expert Material and Equipment Management
Expert Negotiation Skills
Intermediate Operational Management
Expert Persuasion Customer
Intermediate PRIMAVERA 6.1
Intermediate Procurement Knowledge
Expert Project Management
Intermediate Purchase Procurement Knowledge
Expert Quality Control
Expert Quality Control Printing
Intermediate Record Maintenance
Intermediate Strategic Thinking
Intermediate Strong Leadership
Intermediate Team Building
Expert Vendor Management Skillls
Intermediate Voltage Systems Handling Skills
Intermediate المهارات المعمارية
Expert التخطيط المدني
Expert رسم الآلات

Languages

Expert Urdu
Intermediate English

Companies Followed