Summary

Well-organized good planner good time-manager
Self-aware - always seeking to learn and grow
Conclusive and results-driven creative problem-solver

Experience

Company Logo
IE Manager
Silver Star Group
Jan 2015 - Present | Sialkot, Pakistan

Production Planning and Control (PPC), Resource Management.
SAM calculation and designing process flow chart at product development.
Managing financial planning and cost analysis.
Designing the layout of Operations processes.
Reducing garments rejection and alteration up to 15% to 3%.
Fixing the operators grade based on their performance and criteria.
Developing multi-Skill operators based on their individual interest and maintaining skill Matrix record.
List out low efficiency operators and monitor to improve their efficiency.
Monitoring and line balancing based on capacity and WIP in the line.
Conduct time study to calculate standard allowed minute for operations
Prepare daily production reports to highlight efficiency and identify training needs
Initiates lean manufacturing to balance line and implement 5S
Prepare operation breakdown of different article and set the layout of machines.
Planning day to day production to achieve maximum production.
Knowledge of the implementation of various techniques and quality/ safety standards for improving operations along with cost saving
Quality standards like 6S, 8 Waste, Kaizen, Poka Yoke, and Kanban System etc.
Distribution of work load to operators in order to achieve daily production target.
Simultaneously working towards productivity and quality improvement through Kaizen activities.
FMEA,TPM, JIT, lean manufacturing, Single piece flow concept

Company Logo
Production Engineer
Kohinoor Textile Mill (Pvt)Ltd, Lahore
Apr 2014 - Dec 2014 | Lahore, Pakistan

Final year Project on Productivity enhancement by using Value Stream Mapping (VSM).

Results.
Reduction in transportation of material from 40% to %7%
Reduction in lead time from 30% to 54%,
Reduction in labor Cost from 10% to 20%.

Company Logo
Industrial Engineer
USA appral Pvt Ltd
Jun 2013 - Dec 2014 | Lahore, Pakistan

Conduct time study to calculate standard allowed minute for operations
Conduct motion study and implement better system to eliminate excess motions
Prepare daily production reports to highlight efficiency and identify training needs
Initiates lean manufacturing to balance line and implement 5S

Education

University of Management & Technology (UMT)
Bachelors, Bachelors in Arts, Bachelors in Science Major In Industrial Engineering‎
Production Planning And Control, Lean Manufacturing Systems, Total Quality Management, ,
CGPA 3.59/4
2014

Skills

Expert Quality Assurance
Expert 5S
Expert Accounts Administration
Beginner Activity Controls
Expert Advance Manufacturing System
Expert Aesthetic Procedures Knowledge
Beginner Analytic Reporting
Beginner Analytical Skills
Expert Answering Inquiries
Expert Apparel Management
Expert Apparels Management
Beginner Budgeting
Beginner Clothing Retail Operations
Beginner Compliance Quality Control
Expert Configuring Software
Beginner Control Points Knowledge
Expert Cooordination Skills
Expert Coordination Skilla
Expert Coordination Skills
Expert Cost Accounting Standards
Expert Cost Engineering
Expert Data Analytics
Expert Demand Analysis
Expert Document Controlling
Expert ERP Knowledge
Expert Freight Forwarding Management
Beginner Front Line Leadership
Expert Garment Manufacturing
Expert Garments Packaging
Expert Hydraulics Knowledge
Expert Import and Export Management
Expert Import Operations
Expert Industrial Engineering
Expert Industrial Engineering\'
Beginner Inventory Forecasting
Beginner Inventory Optimization
Beginner Inventory Planning Skills
Intermediate Just In Time
Expert Kaizen
Intermediate Kanban System
Beginner KPI Reports Making
Intermediate Lean Fundamentals
Intermediate Lean Manufacturing
Expert Management Skills 
Expert Manager
Expert Microsoft Excel
Expert Microsoft Office 1
Beginner MS Outlook
Expert Negotiation Skills
Expert Network Infrastructure Enhancement

Languages

Expert English
Expert Urdu