I have high profile Projects Management, Substation Construction Management. Managed several mega projects related to the field of transmission distribution electric substations construction in United Arab Emirates Kingdom of Saudi Arabia
Managed the projects from kick off meeting till FAC. Managed but not limited to Engineering design (Design, Base design, Detail design), Material Procurement Supply, Civil, Structural finishing works, site works execution, installation, erection, testing and commissioning, punch /snags closing and overall construction management.
Apart from above I have site supervision inspection expert level experience in hands in the field of medium Voltage, high Voltage and extra high Voltage transmission distribution substations construction, electric grid stations (Outdoor Indoor) construction.
I worked with the world reputed and well-known companies and authorities like Dubai Electricity Water Authority (DEWA) Dubai, United Arab Emirates, Sharjah Electricity and Water Authority Palace Consulting Engineers Kingdom of Saudi Arabia.
Specialties Project Management, Substation Construction
JOB RESPONSIBILITIES
Supervision of Erection/ installation work, testing and commissioning of 380kv gas insulated switchgears
Supervision of erection/installation work, testing and commissioning of 132KV, 110KV gas insulated switchgears
Supervision of erection/installation work, testing and commissioning of 13.8 kV gas insulated switchgears
Power transformer erection/installation and testing and commissioning up to 500MVA
Erection/installation of AC/DC panels and batteries and chargers
Testing and commissioning of control and protection panels for the transmission substations up to 380kV
Installation, testing and commissioning of Capacitor banks up to 7MVA.
Arranging weekly & bi-weekly meetings with contractor and concerned divisions in order to solve problems incurred during the design, construction, testing & commissioning, and project handover stages
Preparation of weekly & monthly reports for site activities and addressing related issues to the management.
Inspection of materials and equipment’s arriving on site i.e. earthing material, GIS, switchgear, Power transformer, battery and battery charger, Auxiliary Transformer, Relay & control Panels, RTU, Tele-protection equipment, Communication equipment.
Follow up the site activities for on-time completion of Electrical works to start & complete the electrical installation and to start and finish the testing & commissioning activities.