Summary

First, I work with full loyalty and honesty, accept the full responsibility of everything that happens due to actions taken by me. Instead of waiting for the right time to come to do things, I work in my circle of influence to achieve the task, with what I have. I have specialty of task management in my personal life, which helps me to break down the multiple task into simple and doable task within reasonable time. I have read communication skills book, it helps me to communicate strategically and emphatically, to top managers, executive, workers and on management side to supplier and customer. I have created certain disciplines in my life, through which I can work effectively and efficiently, this discipline not only include physical activity but also include discipline of creative and intellectual thinking and taking massive action toward potential problem. To me mistake is an opportunity, this thinking has always helped me I to achieve my dreams, I have received two awards in two big scientific competition and one in best business idea. I am fascinated by the term productivity, to me it means achieving or providing values in reasonable time with acceptable quality. My eager to learn new skills have always helped me in my personal development, strategy development and making new perception about how humans and business operate.

Projects

Absorption Based Post Combustion CO2 Capture Using Piperazine as a Solvent.

Experience

Company Logo
Assistant Manager Production
Power Cement Limited
Sep 2019 - Present | Nooriabad, Pakistan

Follow up the equipment operation data (temperature, pressure, feed, flow) and ensure the stoppage and start-up of equipment comply with the safety standards. • Control & optimize heat consumption, power consumption, dust emission, NOX, CO2 emission, etc. • Implement timely corrective actions to comply with the established quality parameters. • Identify and analyze data, indicators and trends of the production process, provided by digital control system in order to implement preventive and/ or corrective action to improve the equipment performance. • Follow up the operation parameters of the equipment to ensure smooth equipment operation. • In charge of DCS operation for all plant areas. • Put the new equipment start/stop sequence and interlocks. • Ensure high levels of equipment performance and optimum operation cost. • Evaluate and recommend improvements in usage of equipment, material, manpower, performance and quality. • Review operational reports, identify root cause of performance gaps, and take corrective/preventive action to improve production performance and plant availability in coordination with appropriate group. • Done a weigh feeder and bins calibration work. • Shift lead on clinker export and cement bulker loading.

Company Logo
Trainee Engineer Production
Power Cement Limited
Sep 2018 - Sep 2019 | Nooriabad, Pakistan

Plant Erection Phase :
- Worked with FLS in new cement plant installation(Line-III).
-Developed a equipment checklist regarding electrical and mechanical maintenance.
- Monitored the electrical and mechanical equipment installation work against FLS policies, procedures and standards.
- Part of OBI team.
- Lead the refractory installation work.

Plant Commissioning Phase:
-Work work with FLS in commissioning phase.
-Lead the Cold run testing of bag filters, rotary feeders, belt conveyors, bucket elevator, air slides, diverter gate, separator, mill fan, gypsum crusher, apron conveyor and weigh feeder.
-Monitored the Group Run test.
- Part of main bag house Dye Penetration test.
- Done a weigh feeder and bins calibration work.
- Shift lead of cement mill operation commissioning.

Company Logo
Internship
Lucky Cement Limited
Aug 2016 - Aug 2016 | Nooriabad, Pakistan

Production department was my field of study. During internship I got the practical knowledge of conveyors, preheaters , kiln, separators, heat recovery sections and new crushing Unit. There, I experienced the maintenance of kiln and learned about types of brick lining used in it. I also visited the air quenching unit during maintenance and learned how it works.

Company Logo
Internship
Power Cement Limited
Feb 2016 - Feb 2016 | Nooriabad, Pakistan

I was the Internee at PoweProduction department was my area of study. I have learned and experienced the cement production process and also the maintenance of ball mill,hammer mill and vertical roller mill.r Cement for 1 week.

Company Logo
Internship
Pakistan Council of Scientific and Industrial Research (PCSIR)
Jun 2015 - Jun 2015 | Karachi, Pakistan

I have studied and presented the report on Fish Protein Concentrate(FPC) in PCSIR. The report includes the cost and economic analysis of new FPC plant.

Education

Institute of Business Management (IoBM)
Masters, Masters in Business Administration, ‎
Industrial Management
2021
Dawood University of Engineering & Technology (DCET)
Bachelors, Bachelors in Science, B.E Chemical Engineering‎
Fluid Engineering, Mass Transfer, Chemical Reaction Engineering
CGPA 3.8/4
2017
Govt. Degree College
Intermediate/A-Level, Faculty of Science (Pre-Engineering), Pre-Engineering‎
Chemistry, Physics, Mathematics
Percentage 70%
2013
Hanifia Public School
Matriculation/O-Level, Matric in Science, Matric‎
Physics, Mathematics, Chemistry
Percentage 81%
2011

Skills

Expert Analytical Skills
Intermediate ASPEN Hysys
Intermediate Chemical Process Design
Intermediate Civil Planing
Expert Conservation Awareness
Intermediate Cooordination Skills
Expert Critical Research and Literature Review
Expert Data Analysis
Intermediate Force Field Analysis
Expert Handling Assignments
Expert MIT Knowledge
Intermediate Numerical Analysis
Intermediate Record Keeping
Intermediate Strategic Communications
Intermediate Strategic Planning
Intermediate Task Management

Languages

Intermediate Urdu
Intermediate English