Summary

Seeking a position to utilize professional knowledge and experience through highest level of commitment to achieve organizational growth and profits and to be the brain behind the automation of any firm.

Experience

Company Logo
Assistant Manager E&I
Gharibwal Cement Limited ( 20 MW Thermal Power Plant) O&M
Mar 2020 - Present | Chakwal, Pakistan

Assistant Manager Electrical & Instrumentation(O&MDept.)Gharibwal Cement Limited (20 MWThermal PowerPlant)29 March2020 - till date
Electrical Expertise:
 Developed and executed comprehensive operation andmaintenanceprocedures for generators , motors, Transformers andother criticalcomponents, ensuring strict adherence to industry standards.  Managed Medium Voltage (MV) panels, Low Voltage (LV) panels,switchgears, and other electrical equipment. Oversawsystematicdocumentation of their performance, conducting regular auditsforcontinuous improvement.  Coordinated the 132kV grid station's operation, meticulouslydocumenting synchronization, power factor regulation, andpowerdistribution processes for optimal efficiency.  Implemented and documented emergency power supplymeasures,overseeing the UPS system, and emergency generators, ensuringseamless transitions during power outages.  Maintained detailed documentation on bus bars, facilitatingefficientpower distribution within the plant and supporting continuousimprovement initiatives.  Provided comprehensive documentation and oversight for AVR(Automatic Voltage Regulator) systems, excitation systems, andsynchronization protocols.  Led documentation efforts for power generation anddistributioninitiatives, including protection measures and relay configurations. Generated regular reports on electrical systemperformance, contributing to data-driven decision-making and proactivemaintenanceplanning. Instrumentation Expertise:
 Developed and maintained detailed instrumentation proceduresforflowsensors, Differential Pressure Transmitters (DPT), PressureTransmitters,level Transmitters, PLC, HMI, and DCS systems.
 Conducted systematic documentation and calibrationof RTDs(Resistance Temperature Detectors) and Thermocouples, ensuringprecise temperature monitoring and compliance withstandards. Oversaw the documentation of level gauge readings, ensuringaccuracyin level measurements and facilitating timely adjustments.  Documented procedures for control circuits, VFDs (VariableFrequencyDrives), limit switches, vibration sensors, and LVDTs, contributingtoeffective control system operation and troubleshooting.  Conducted comprehensive documentation of calibrations andtroubleshooting activities for instrumentation systems, creatingavaluable reference for future maintenance.  Implemented and documented advanced technologies suchasPLC,HMI,and DCS for real-time monitoring, enhancing overall plant safetyandreliability.  Generated regular reports on instrumentation systemperformance,providing insights for continuous improvement and facilitatingproactivemaintenance strategies.

Company Logo
Site Engineer (Auxiliary Department)
Suki KInari (SK) Hydropower Project 884MW (CGGC) Energy China
Aug 2017 - Sep 2019 | Abbottabad, Pakistan

job Responsibilities
 Managing Electrical distribution System
 Inspection and maintenance ofelectrical equipments.  Maintenance , Inspection of electrical quipments such as
 Transformers, Generators, Radial feeders,Isolators, Arresters,  Busbsar,Fencing, Distribution Panels and motors.  Management of Elctrical Eqipments used in offices and livingcamp.

Education

N.W.F-P University of Engineering and Technology Peshawar.
Bachelors, Bachelors of Engineering, BSc in Electrical communication Engineering‎
Electrical
2016

Skills

Intermediate Electric Power Management
Intermediate Etap
Intermediate Feedback Control Systems
Intermediate Field Instruments
Intermediate Technical Writing
Intermediate Thermal Power Plant
Intermediate Turbine Monitoring

Languages

Expert English
Expert Urdu