Summary

- Professional surveyor on mega projects since 2005.


- As Chief Surveyor worked independently on Kamal Khan Dam Afghanistan with ABCC (Asia Bana Construction Company Nimroz Province) and at KHPP (Koto Hydro Power Project) involving embankments, concrete works for hydraulic structures with elaborate protection works.


- Vast surveying experience on Mangla Dam Raising Project, Lower Bari Doab Canal Improvement Project (LBDCIP) and numerous infrastructure projects.

Experience

Company Logo
Chief surveyor
GHACOS LTD
Dec 2019 - Present | Accra, Ghana

1. Name of Employing Agency GHACOS Limited Ghana
Title of Position Chief Surveyor / Quantity Surveyor
Location of Assignment Accra Ghana.
      Period of Assignment 05 Dec, 2019 to 29 March, 2022.
ACTIVITIES
Worked as Chief Surveyor / Quantity Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Preparation of Layout Data of road and Embankments for survey teams.
• Preparation of Slope trimming Data of Embankment for survey teams.
• Preparation of Cross Section and Shop Drawings.
• Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works
• Supervising the quality and workmanship according to the approved drawings and specification.
• Manages directly and provide engineering and technical supports to all the civil work groups at site.
• Assign targets for accomplishments and ensure targets are met on daily basis for all civil groups at site.
• Calculation of weekly Work Done Quantities.
• Preparation of Weekly Progress Drawings.
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
2. Name of Employing Agency Sukh Chayn Residence. Ltd
Title of Position Chief Surveyor / Draftsman
Location of Assignment Sukh Chayn Residence F-10 Markaz Islamabad.
      Period of Assignment 26 Dec, 2017 to 03 Dec, 2019
ACTIVITIES
Worked as Chief Surveyor / Draftsman at site in office and during the period the responsibilities incurred upon me are listed below:
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Demarcation and survey of required area for project according to construction drawings.
• Ensuring excavation up to required elevation according to construction drawings.
• Scrutiny of surveys carried out by the Contractors.
• Check the Shop drawing submitted by the contractor with software Auto CAD and Auto CAD Civil 3D.
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
3. Name of Employing Agency M/S Usmani International Associate Company
Title of Position Chief Surveyor / Site Engineer
Location of Assignment Lowari Tunnel North Access Road Package II
      Period of Assignment July 17, 2017 to 24 Dec, 2017
ACTIVITIES
Worked as Chief Surveyor / Site Engineer at site in office and during the period the responsibilities incurred upon me are listed below:
• Preparation of Layout Data of road and Embankments for survey teams.
• Preparation of Slope trimming Data of Embankment for survey teams.
• Preparation of Layout Data of Retaining walls, Breast walls and Rock fall walls for survey team.
• Preparation of Cross Section and Shop Drawings.
• Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works
• Supervising the quality and workmanship according to the approved drawings and specification.
• Manages directly and provide engineering and technical supports to all the civil work groups at site.
• Assign targets for accomplishments and ensure targets are met on daily basis for all civil groups at site.
• Calculation of weekly Work Done Quantities.
• Preparation of Weekly Progress Drawings.
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
4. Name of Employing Agency M/S Haji Nazakat Ali & Co.,
Title of Position Chief Surveyor
Location of Assignment Karachi-Lahore Motorway M5 Project Section 7
      Period of Assignment Nov 7, 2016 to July 15, 2017
ACTIVITIES
Worked as Chief Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Preparation of Layout Data of road and Embankments for survey teams.
• Preparation of Slope trimming Data of Embankment for survey teams.
• Calculation of weekly Work Done Quantities.
• Preparation of Weekly Progress Drawings.
• Supervising the quality and workmanship according to the approved drawings and specification.
• Manages directly and provide engineering and technical supports to all the civil work groups at site.
• Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works
• Assign targets for accomplishments and ensure targets are met on daily basis for all civil groups at site.
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
5. Name of Employing Agency M/S SARWAR & Co. (pvt) Ltd
Title of Position Chief Surveyor/ Quantity Surveyor
Location of Assignment Koto hydropower project Timergara KPK
      Period of Assignment Sep 1, 2015 to Oct 31, 2016
ACTIVITIES
Worked as Chief Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Supervision Hydraulic Structure of Power House Building.
• Preparation the Layout Drawings of Power House Hydraulic Structure for Survey Team.
• Preparation of survey data of wear, Coffer dam, water diversion channel, Box channel and sand trap structure.
• Calculation of weekly Work Done Quantities.
• Preparation of Weekly Progress Drawings.
• Preparation of Daily Progress Report.
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Demarcation and survey of required area for project according to construction drawings.
• Ensuring excavation up to required elevation according to construction drawings.
• Checking and supervised the cutting and filling at box channel.
6. Name of Employing Agency M/SMMP (MOTT MACDONAL PAKISTAN)
Title of Position Surveyor
Location of Assignment LBDCIP (Lower Bari Doab Canal Improvement Project) Sahiwal Division
      Period of Assignment Aug 26, 2014 to Aug 29,2015.
Worked as Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
ACTIVITIES
• Supervision Hydraulic Structure of canal like head regulator, cross regulator etc.
• Preparation the Layout Drawings of Hydraulic Structure.
• Preparation of Layout Data of canal, Hydraulic structure and Embankments.
• Calculation of weekly Work Done Quantities.
• Preparation of Weekly Progress Drawings.
• Preparation of Daily Progress Report.
• Control the concrete structures of falls, outlet, village road bridges, district road bridges and foot bridges.
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Demarcation and survey of required area for project according to construction drawings.
• Layout out and excavation of FO office and miscellaneous roads at canal.
• Ensuring excavation up to required elevation according to construction drawings.
• Checking and supervised the cutting and filling at canal.
7. Name of Employing Agency M/SASIA BANA CONSTRUCTION COMPANY Ltd
Title of Position Chief Surveyor
Location of Assignment Kamal Khan Dam Zaranj Nimroz Province Afghanistan
Period of Assignment Aug 13, 2013 to Aug 17, 2014.
ACTIVITIES
Worked as Chief Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Ensuring Main Dam and Training Dike foundation excavation up to required elevation according to construction drawings.
• Preparation of Layout Data of Main Dam and Training Dike, RCC Pipe culvert and Embankments for survey teams.
• Preparation of Slope trimming Data of Main Dam and Training Dike for survey teams.
• Calculation of weekly Work Done Quantities.
• Preparation of Weekly Progress Drawings.
• Preparation the Layout Drawings of Sheet Pile Area for Survey Team.
• Construction and excavation of the R.C.C culvert.
• Supervising the quality and workmanship according to the approved drawings and specification.
• Checking and supervised the cutting and filling at Main Dam and Training Dike.
8. Name of Employing Agency M/SMMP (MOTT MACDONAL PAKISTAN)
Title of Position Surveyor
Location of Assignment LBDCIP (Lower Bari Doab Canal Improvement Project) Sahiwal Division
      Period of Assignment Feb 14, 2013 to Aug 08,2013.
ACTIVITIES
Worked as Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Supervision Hydraulic Structure of canal like head regulator, cross regulator etc.
• Preparation the Layout Drawings of Hydraulic Structure.
• Preparation of Layout Data of canal, Hydraulic structure and Embankments.
• Calculation of weekly Work Done Quantities.
• Preparation of Weekly Progress Drawings.
• Preparation of Daily Progress Report.
• Control the concrete structures of falls, outlet, village road bridges, district road bridges and foot bridges.
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Demarcation and survey of required area for project according to construction drawings.
• Layout out and excavation of FO office and miscellaneous roads at canal.
• Ensuring excavation up to required elevation according to construction drawings.
• Checking and supervised the cutting and filling at canal.
9. Name of Employing Agency M/S TECHRED CONSULTANTS
Title of Position Surveyor
Location of Assignment Satellite Town Jhelum
Period of Assignment Oct 04, 2012 to Feb 14, 2013.
ACTIVITIES
Worked as Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Demarcation and survey of required area for project according to construction drawings.
• Layout out of Infrastructure and miscellaneous roads in Urban Development projects.
• Ensuring excavation up to required elevation according to construction drawings.
• Construction of Urban Development projects.
• Scrutiny of surveys carried out by the Contractors.
• Check the Shop drawing submitted by the contractor with software Auto CAD and Eagle Point.
10. Name of Employing Agency M/S ANDRITZ HYDRO TECHNOLOGIES LTD
Title of Position Sr. Surveyor
Location of Assignment New Bong Escape Hydro-Electric Power Complex
      Period of Assignment March 25, 2012 to Oct 02, 2012.
ACTIVITIES
Worked as Sr. Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Supervision GIS room (Gas Insulation Switch) of Power House Building.
• Layout of turban housing, switch yard.
• Layout & alignment of intake Trash Rack (Top Beam, Upper Support Beam, Lower Support Beam & Bottom Beam).
• Alignment of Gantry Crane rails.
• Alignment of stop log storage area rails.
• Layout & alignment of service track, side guide rail, counter guide and sill beam.
11. Name of Employing Agency M/S SAMBU CONSTRUCTION CO., LTD.
Title of Position Sr. Surveyor
Location of Assignment New Bong Escape Hydro-Electric Power Complex
      Period of Assignment May, 2011 to March 15, 2012.
ACTIVITIES
Worked as Sr. Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Supervision Hydraulic Structure of Power House Building.
• Preparation the Layout Drawings of Power House Hydraulic Structure For Survey Team.
• Preparation of Layout Data of Tailrace Channel, Embankments and Tailrace Channel for Survey Team.
• Calculation of weekly Work Done Quantities.
• Preparation of Weekly Progress Drawings.
• Preparation of Daily Progress Report.
• Construction and excavation of the head race and tailrace retaining walls.
• Control the concrete structures of Head and Wing walls of box culverts. Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Demarcation and survey of required area for project according to construction drawings.
• Layout out and excavation of Infrastructure and miscellaneous roads at Tailrace Channel.
• Ensuring excavation up to required elevation according to construction drawings.
• Checking and supervised the cutting and filling at tailrace channel.
12. Name of Employing Agency M/S Barqaab (Pvt) Ltd.
Title of Position Surveyor
Location of Assignment Mangla Dam Raising Project - Pakistan
      Period of Assignment March 15, 2007 to April 30, 2011
ACTIVITIES
Worked as Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Demarcation and survey of required area for project according to construction drawings.
• Layout out of Infrastructure and miscellaneous roads in Urban Development projects.
• Ensuring excavation up to required elevation according to construction drawings.
• Construction of Urban Development projects.
• Scrutiny of surveys carried out by the Contractors.
• Check the Shop drawing submitted by the contractor with software Auto CAD and Eagle Point.
13. Name of Employing Agency MJV Consultants (Seconded from WAPDA)
Title of Position Surveyor
Location of Assignment Mangla Dam Raising Project - Pakistan
      Period of Assignment December, 09, 2005 to March 10, 2007
ACTIVITIES
Worked as Surveyor at site in office and during the period the responsibilities incurred upon me are listed below:
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Embankment fills comprising of different materials e.g. sandy gravel, random fill and filters.
• Construction of Urban Development projects.
• Preparation of Weekly and fortnightly progress reports.
• Scrutiny of surveys carried out by the Contractors.
14. Name of Employing Agency M/s Habib Rafiq (Pvt) Ltd.
Title of Position Surveyor
Location of Assignment Mirpur (AJK)
      Period of Assignment July 01, 2005 to December01, 2005
ACTIVITIES
Worked as Surveyor on Mirpur (New City) Project. The main activates handled were as under:
• Controlling & Supervising the quality and workmanship according to the approved drawings and specification.
• Demarcation and survey of required area for project according to construction drawings.
• Layout out of primary and secondary roads building and other components of the project.
• Ensuring excavation up to required elevation according to construction drawings.
• Preparation of Weekly and fortnightly progress reports.
• Checking of bills / work done by sub-contractor every month.


























































Education

Rasul college
Diploma, ‎
Civil
Incomplete
2005

Skills

Expert Calculation Conduction
Intermediate Civil Supervision Skills
Expert Component Repairing
Expert Cooordination Skills
Expert CSS 
Expert Database Impact
Expert Field Surveying
Expert Geophysical Surveys
Intermediate Good Knowledge Of Principles
Intermediate Quantity Surveying
Beginner Record Keeping
Intermediate Report Writing
Expert Survey
Expert Surveying Skills
Expert Technical Skills
Intermediate رسم الآلات

Languages

Intermediate English