I am Mechanical Engineer. I have 8 year experience in HVAC and MEP. Currently I am working in Centaurus Mall Islamabad as MEP Engineer
• Installation of the entire ducting network according to the drawing given.
• Installation of Pumps, FAHU’S and other mechanical equipment’s according to the drawing and the location.
• Installation of Chilled water and VRV system for different shops and residential apartments.
• Installation and testing commissioning of AHU’s , FCU’s and Cassette type Air conditioning units.
• Installation of ducting and piping according to the drawing and specification given.
• Developed and implemented procedures for spare parts store.
• Installation of air linear slot diffusers similar to Tuttle & Baily Series 6000.
• Managing contracts and procurements.
• Calculating the size of ducting and piping according to the scale mentioned in drawing by the designer.
• Ensuring the HVAC systems is meeting the building code.
• Overseeing HVAC installation and answering questions of contractors.
• Preparation of shop drawings.
• Calculating the quantities required for piping and ducting according to the drawing.
• Fixing and installation of Stairwell pressurization System In Tower A,B Centaurus mall.
• Testing and Commissioning of all installed ducting work as directed by Client
• Testing and Commissioning of Air Devices including balancing of air flow rates.
• Installation of Firefighting MS Seamless pipe line from Diameter 1’’ to 6’’.
• Conducting Hydrostatic Pressure testing for whole pipe line at 350 Psi .
• Installation of Different type of Sprinklers, e.g Upright, pendant, concealed and side wall.
• Installation of all other firefighting equipments including Fire hose reel and fire extinguisher.
• Responsible for the planning of all types of maintenance of whole facility including buildings HVAC Systems.
• Project Management and Technical Coordination.
• Price evaluation and order placement.
• Supervise and direct a work force of more than 25 Lead facility and installation technicians.
• Ensured project completion in timely manner.
• Installation of water cooled water chillers with scroll compressors total job (1200 TON).
• Installation and testing of cooling towers having US GPM 1374.
• Installation and commissioning of pumps made DAB.
• Installation and maintenance of HVAC System.
• Coordinate system installation with contractors.
• Ensuring the HVAC System meeting the building code.
• Field coordination with manpower.
• Installation of VRF system (AERMEC).
• Preparation of shop drawings.
• Installation of plant room steel structure over rooftop as specified by the consultant.
• Installation and commissioning of Allied Works (Transformer, Electrical Panels and Power Cabling).
• Installation of cable tray and DB’s.
• Installation of ducting and piping according to the drawing given by consultant.
• Reviewed engineering design proposals, design drawings, specifications and recommend improvements.
• Oversee annual service work on chillers cooling towers and pump systems to optimize operation of systems.