Summary

Looking for an ideal challenging job where I shall utilize my abilities, experiences and myself for the promotion of the desired organizational objectives.

Projects

BYCO OIL PAKISTAN LIMITED (BOPL) 120M BPD Hub Mouza Kund Distt. Lasbela
Adhi LPG / NGL Recovery Plant – III (PPL)
National Refinery Limited (NRL) Turnaround 2014
Pakistan Refinery Limited (PRL) Turnaround 2014
UCH-II 400, MW, CCPP, (P-8309 / 1139), Dera Murad Jamali
BYCO OIL PAKISTAN LIMITED (BOPL) 120M BPD Hub Mouza Kund Distt. Lasbela
BHP Billiton Zamzama Gas Field (1133) Dadu
Engro Fertilizer (Enven1.3 Engro Expansion Project (1121), Daharki)
See More

Experience

Company Logo
In-Charge QA/QC
Descon Engineering Limited, BYCO OIL PAKISTAN LIMITED (BOPL) 120M BPD Hub M
Sep 2015 - Present | Lahore, Pakistan

• Liaison with senior management regarding QA/QC matters.
• Preparing PQRs & WPS for welding
• Ensuring all NDE activities according to the procedure
• Preparing QIP for static equipment’s, Furnace re-tubing & Piping according to client’s specifications.
• To attend Hydro test & soap filling test of static equipment’s
• Making MS regarding, welding procedure, repair procedure, NDE & hydro test
• Monitoring all QA/QC activity & daily meeting with my team.

Company Logo
QA/QC Engineer
Descon Engineering Limited, Adhi LPG / NGL Recovery Plant – III (PPL)
Apr 2015 - Sep 2015 | Lahore, Pakistan

• Inspecting the materials regarding Traceability, Physical condition, color code and HEAT number verification as per MTC and ISOMETRIC requirement.
• Checking alignment / Orientation of pipes as per ISO Drawing.
• Visual inspection of final weld profile.
• Control of welding material (Electrode, Filler Wire) as per their type and lot number
• Witnessing of NDT methods (PT/RT/MT/UT) according to specification and Section- V.
• Preparing NDT request to fulfill the project NDT requirement as per piping class or line class and project specification.
• Inspection and monitoring of site activities such as fabrication, and installation of piping spools.
• Inspection of type of valves, their directions, tag numbers, rating and size.
• Line checking as per test packages, punch listing and responsible for Hydro testing & Re-instatement works.
• Monitoring and conducting material inspection for piping, as per standards, codes and Process standard specification, and inspection of fit-up, punch listing, weld root and subsequent passes for pipe joints with dimension and orientation.
• Ensuring stage inspection and dimensional control inspection of piping in pre fabrication and erection as per drawing, project specification and inspection test plan.
• Review and preparing of Test Package Weld Summary & NDE Summary.
• Check flange alignment, flange hole offset & tilting.
• Inspection of hydro-test, Air blowing & Reinstatement.
• Verification of test equipment’s calibration of PSV pressure gage and manifold.

Company Logo
QA/QC Engineer
Descon Engineering Limited, National Refinery Limited (NRL) Turnaround 201
Dec 2014 - Jan 2015 | Lahore, Pakistan

• Coordination with client regarding site inspections.
• Coordinating with NDT team regarding NDT (i.e. RT, UT, DPT and MPI).
• Maintain the records of NDT reports after review.
• WPS/PQR review and approval.
• Fit-up inspection after joints preparation as per ISO provided.
• Co-ordination for pre-heating
• Preparation and conducting RIT.
• Coordinating, reviewing and managing the record of Hydro Test, Pneumatic Test and Leak Test.
• Inspection and documentation after proper flushing from pipelines after Hydro Test.
• Inspection of incoming material at job site.
• WPS/PQR review and approval.
• Inspection of maintenance and repair activities of in-service pressure vessels according to 510 during turnarounds. (Vessels, Columns, Heat Exchangers, Heaters, filters, AFCs)
• To attend Box-Up activity of all static equipment’s (Pressure vessel, Column, Heat exchanger)
• Final submission of QC dossier after client’s review.
• Painting & Insulation inspections

Company Logo
QA/QC Engineer
Descon Integrated Projects (Pvt) Limited (DIPL), Pakistan, UCH-II 400, MW,
Aug 2013 - Apr 2014 | Lahore, Pakistan

• Performing Audits and reporting non-conformities.
• Performing corrective and preventive actions from audit reports.
• Incoming Martial inspection of pipes and fittings of the pipes as per IFC & MTC.
• Inspection and Testing of Mechanical Construction Activities like, Fabrication & Erection of Piping
• Monitor all-critical activities like, welding, NDT and Hydro-testing according to the Procedure, Quality
• Inspection Plan and Project Specification.
• To Witness of Hydro test, Leak test, Pneumatic test, Flushing/Air Blowing.
• To check all relevant formats are attached in test Pack
• Coordination with client to resolve the issues related to Test Package.
• Fit up inspection of piping as per IFC drawings.
• Welding inspection of piping in shop and field.
• Prepare construction punch list.
• Maintain quality records for NDE, Inspection and testing activities
• Having sound knowledge of final documents submission (Dossiers), daily basis data and test packs at the completion of works.

Company Logo
QA/QC Engineer
Descon Engineering Limited, Pakistan Refinery Limited (PRL) Turnaround 2014
Oct 2014 - Dec 2014 | Lahore, Pakistan

• Preparation of QIP.
• Inspections of all activities as per QIP
• Preparation of WPS as per approved PQR
• Inspection and Testing of Mechanical Construction Activities like, Fabrication & Erection of Structure.
• Preparation of daily Inspection reports.
• Daily Meeting field Staff about progress & Co-Ordination.
• To Maintain Record for Equipment installation, Steel Structure work.
• Fitup of Structure as per Drawing.
• Welding inspection of Structure Work.
• To Witness of Hydro test, Leak test, Pneumatic test, Flushing/Air Blowing.
• Welding inspection of piping in shop and field.
• Responsible for fabrication of piping, maintaining Quality record for NDT, Inspection & Testing.

Company Logo
QA/QC Engineer
Descon Engineering Limited, 120M BPD Hub Mouza Kund Distt. Lasbela
Jul 2011 - Aug 2013 | Lahore, Pakistan

• Responsible for sending QA/QC Reports and other relevant data, as & when required to the Head of QA/QC.
• Responsible for maintaining up-to date quality records as per Customer Requirements & make final Dossier for the client.
• Responsible to complete all Test Packs According to the requirement & demand of desired client.
• Experience in process piping fabrication and erection involved in preparation of detail schedule & progress monitoring of fit up & welding to ASME SEC.B31.3
• Welder Qualification Test as per ASME IX.
• Under Ground pipe line welding coating holiday lowering backfilling Sand blasting surface
• Preparation premier paint DFT Inspection.
• Preparation of the documentation side-by-side of the activities.
• Material handling with inspection according to specification and procedure.
• Preparing the list and job close Final Dossier as well as.

Company Logo
QA/QC Engineer
Descon Engineering Limited, BHP Billiton Zamzama Gas Field (1133) Dadu
Nov 2010 - Sep 2011 | Lahore, Pakistan

• Responsible for overall execution of the Quality Inspection Plan at Project site.
• Responsible for ensuring that all critical activities like NDT, PWHT, Hydro Testing, Holiday Testing & PMI is handled according to the procedure & Quality Inspection Plan (QIP). Visual Welding Inspection,
• Responsible for fabrication of piping, maintaining Quality record for NDT, Inspection & Testing.
• Responsible for sending QA/QC Reports and other relevant data, as & when required to the Head of QA/QC.
• Responsible for maintaining up-to date quality records as per Customer Requirements & make final Dossier for submission to client.
• Responsible to complete all Test Packs According to the requirement & demand of desired client.
• NDT Coordinator.

Company Logo
QA/QC Engineer
Descon Engineering Limited, Enven1.3Engro Expansion Project (1121), Daharki
Jun 2009 - Nov 2010 | Lahore, Pakistan

• Responsible for overall execution of the Quality Inspection Plan at Project site.
• Responsible for ensuring that all critical activities like NDT, PWHT, Hydro Testing, Holiday Testing & PMI is handled according to the procedure & Quality Inspection Plan (QIP). Visual Welding Inspection,
• Responsible for fabrication of piping, maintaining Quality record for NDT, Inspection & Testing.
• Responsible for sending QA/QC Reports and other relevant data, as & when required to the Head of QA/QC.
• Responsible for maintaining up-to date quality records as per Customer Requirements & make final Dossier for submission to client.
• Responsible to complete all Test Packs According to the requirement & demand of desired client.
• NDT Coordinator.

Company Logo
Project Engineer
Pakistan
Dec 2005 - Jun 2009 | Daharki, Pakistan

• Installation of Pipe lines.
• NDT coordinator.
• Excellent Knowledge of Corrosion Control in Oil & Gas Pipe Lines &control to all of them.

Education

Dawood University of Engineering & Technology (DCET)
Bachelors, Bachelors in Technology, B.E‎
Metallurgical & Material Engineering
Grade A
2004

Skills

Expert Electronic Inspection

Languages

Expert Sindhi
Intermediate Urdu
Intermediate English

Companies Followed