Summary

Currently, I am working as an Assistant Director in Monitoring and Evaluation System, Planning and Development Department,Government of Khyber Pakhtunkhwa. I worked with ACTED International NGO in Timergara, Dir Lower as a Field Engineer. I worked with ICRC (International Committee of the Red Cross)as a WatHab Engineer (Water and Habitat Engineer) since 11th oct-2010 till 31st Jan-2012. I worked as a Civil Engineer/Buildings with Saleh Al Marzouqi Building Contractor,UAE fro

Experience

Company Logo
Assistant Director
Monitoring and Evaluation System, Planning and Development Department, Government of
Nov 2012 - Present | Peshawar, Pakistan

Conducting frequent visits to different projects/sites and to generate detail monitoring reports against each visit, keeping in view the quality of construction and to give recommendations for further improvements in every project.
Assistance in adherence to quality standards (QC/QA).
Assistance in the timely completion of projects within the approved costs (PC-1/Detail Cost Estimate).
Reviewing various drawings and to ensure construction as per structural drawing/technical specifications of the project on site.
Scrutinizing of tender documents submitted by contractors and suppliers for developmental projects.
Assistance in the identification of impediments in project implementation and reporting to concerned quarters.
Assistance in the improvement of project management.
Feedback for future planning (i.e assist in strategic allocation and utilization of scarce resources).
Introduction of pre, mid, final and post terms monitoring and evaluation mechanism in project implementation.
Availability of updated information on the status of project activities for administrative and legal actions (if any).
Enhanced coordination among the administrative departments on the progress of physical and financial targets.
Provision of a basis for progressive and comparative bench marking of performance across the 07 Divisions of the Province Khyber Pakhtunkhwa.
Implementation of the DPMS under the supervision of Divisional Monitoring Officer (DMO).
Assist DMO in monitoring & evaluation of ADP and PSDP (locally & foreign funded) projects in the Division.
Follow up of M&E reports in the Division in consultation with the DMO.
Preparation and submission of detail monitoring reports.
Assist in preparation of quarterly and annual progress reports.
Any other task assigned by the DMO.

Company Logo
Field Engineer
ACTED Pakistan
Mar 2012 - Aug 2012 | Peshawar, Pakistan

Manage and implement the technical activities on the field.
Plan construction / rehabilitation activities according to project objectives time-frames and designs.
Supervise and provide guidance and technical support to other field teams.
Support and supervise daily skilled and unskilled workers / project volunteers and give them useful instruction regarding their work improvement, through coordination with the relevant skilled staff.
Providing technical guidance, training and support to individuals targeted by each project inline with the programme strategy and intended output[s].
Ensure on time completion of the tasks inline with BoQs and designs.
Report to the Civil Engineer on a daily basis about progress and challenges faced.
Liaising with programme staff of other ACTED teams to ensure that information is shared and that lessons learned are developed.
Directly fix and repair damaged installations or facilities.
Participate in the elaboration of designs and BoQs when required.
Support community mobilizers and village steering committees in the identification and verification of skilled laborers.
Supervise the unloading of the material on site as well as quality and quantity of the items.

Company Logo
WatHab Engineer
International Committee of Red Cross (ICRC)
Oct 2010 - Mar 2012 | Dir, Pakistan

Responsible for implementation of water and sanitation projects in the field.
Assesses sites,situations and needs with regard WatHab aspects.
Prepares project proposals including descriptions,sketches,
drawings,bill of quantities (BoQs),estimation costs and implementation planning based on analysis and WatHab objectives.
Implements projects with contractors,sub-contractors,ICRC teams of technicians and or combinations of the former.
Supervises contractors,sub-contractors and ICRC teams
Gives technical advice to team members,field staff and daily workers working on ongoing projects.
To control and assure the Quality (QC/QA) of all the construction works as per specification.
Supervision of all project implementation at field level
Provide feedback and recommendations to high ups for improvement in output.
Monitors and evaluates the projects regularly.
Prepares the necessary documentation for the request of quotations, for tendering procedures and for purchase of material.
Contributes to written reporting (WOR, Monthly report, WPA, assessment report, field report…)under supervision.
Participates in the planning for result (PfR) exercise.
Performs as translator between the Delegate and local interlocutors.
Apply security rules at all times Respects and observes the staff regulations of the ICRC.

Company Logo
Civil Engineer / Buildings
SALEH AL MARZOUQI BUILDING CONTRACTOR
May 2009 - Oct 2010 | Ajman, United Arab Emirates

Detail supervision & monitoring of on-going projects as per approved structural/architectural drawings and technical specifications.
Carry out scheduled inspections to ensure that works are executed in accordance with the contract documentation and method statements.
To control and assure the Quality of work (QC/QA) by strict adherence to technical specifications.
Reviewing drawings & having keen interest in RCC structural works.
Liaison with the respective consultant engineers on technical issues/matters of projects.
Preparation of bills and estimation of quantities.
Managing and scheduling the daily execution of the project.
To keep the progress of work on track & preparation of weekly and monthly progress report.
To present in-time suggestions/inputs for further improvement, keeping in view the cost and timeline of project.
To deal with subcontractors & suppliers.
Any other task assign by the higher-ups.

Company Logo
Field Engineer
Associates In Development Engineering Consultant
Sep 2008 - Dec 2008 | Peshawar, Pakistan

Detailed Supervision of BHU as per drawing & specifications at AJK.
Preparation of drainage schemes.
To design safe drainage to the consumed and rain(Run-off) water.
Verification of sewers & drains for safe disposal.
To assure safe and pure drinking utility water to the BHU and local community.
To verify the purety of water by Water tests, i-e Turbidity test,PH of water etc.
Preparation of Estimation and verification of Bills.
To deal with the contractor on-site and solve the problems on the spot.
To control and assure the Quality (QC/QA) of all the Construction works as per specification.
To prepare the monthly progress report & forward it to the high-ups.

Company Logo
Site Engineer
MSKB Government Contractor
Jun 2008 - Aug 2008 | Dir, Pakistan

Monitoring and Technical Supervision of site.
Preparation of Bills and Abstracts.
Surveying & Leveling of the site.

Education

NWFP University of Engineering & Technology
Bachelors, Bachelors in Science, B.Sc CIVIL ENGINEERING‎
Concrete Technology, Engineering Management, Advanced Re-inforced Concrete
Percentage 66%
2008
Qurtaba University of Science and Information Technology
Intermediate/A-Level, , HSSC‎
Pre Engineering
Grade A
2004
Wisdom House Public School Timergara District Dir Lower
Matriculation/O-Level, , SSC‎
Science Group
Grade A
2001

Skills

Expert Building Construction
Expert Configuration Switches
Expert Construction Supervision
Expert Construction works
Expert Estimation & costing
Expert Handling Assignments

Languages

Expert Pashto
Expert Urdu
Beginner Arabic
Expert English

Naveed Contacts

SAJID SALEEM