An Electrical Engineer With 08 year of Vast and Versatile Experience in Facility Maintenance ( Preventive and Corrective Maintenance ) of Substation , Control System,Operation & Maintenance of Industrial, Construction, Execution of large-Scale building & Oil & Gas, Refinery Plants Project.
I can act as a proficient member of a team and contribute to the growth of a progressive organization by utilizing my all Knowledge and my all Technical skills to play an active part in the development of the organization. I can solve problems in a creative and effective manner in a challenging position.
I have also excellent communication and 'people skills' of dealing, Managing and organizing. I have ability to motivate and lead a team.
Project Name: Qatar Refinery Project (Refinery II Mesaieed Industrial City (Mic) & Shutdown Project of whole Refinery.
Responsibilities and Achievements:
• We have done maintenance of all Switchgears including VCBs, ACBs, OCBs and other Breakers, Contactors, Earthing Switches, Isolators switches and other all Substation Components.
• We have done maintenance of 11 kv,3.3kv, 415 Busbars and Transformers.
• Performed Electrical Testing of completed hardware, including continuity IR, PI, ER, HV by
using Megger, Hi-Pot tester and other Test equipments.
• We have done testing Motors Power and Control Cables.
• We have performed testing of Relays and their functions.
• We have Worked on 33/11kv Substation, 11kv Substations, 3.3kv Substations and 415v Substations.
• We worked in MV Panel Room, Batteries, UPS Room, VFD,s Room, Instrumental and Control JB,s
• We performed Cable Tray Installation, Cable Trunk & Cable Ladder, Panel Termination, Motor Termination.
• Supervised &Managed all site activities related to work performance, team management, Client dealing, Manufacturer dealing.
• Testing & commissioning all types of control Instruments
Responsibilities and Achievements:
Worked as a Project Engineer and Maintenance Head at Sieger Industries PVT Limited, RawatRwp Punjab Pakistan
Also Managed project of Fire Fighting System, Fire Alarm System, Power System and Backup system of (TDC) THE Diabetes Center Islamabad.
Responsibilities and Achievements:
• Tracked equipment usage and updated quantities of Electrical Power, Control, and
Pneumatic products, equipping team members to complete projects.
• Administered safety tests to assess machinery and equipment and determine potential faults or issues needing repair.
• Observed, assessed and reviewed day-to-day operations and production to verify compliance with regulations for emissions and waste.
• Performed and Managed of All type of repair and maintenance operations of Industry
Managed Fire Fighting and Fire Alarm system Project of whole Industry.
• Supervised overall Industry Project major systems are Electrical Power System, Generator Standby/Backup Power System, CCTV Camera System, Water and Sanitation System, Industrial Compressors Pneumatic System, Industrial Dust Collection and Blower System,
Outdoor and Indoor Lighting System, Public Address System, Fire Alarm System including Smoke Detectors, Heat Detectors Annunciator, Horn Strobes, Alarm Bells, Firewater PumpsMachinery and piping network, Telephone Exchange and networking system.
• Troubleshoot electrical equipment problems such as electro-valves and sensors.
• Installation of FM200 System (Asenware) all Devices, modules installation andTermination, Troubleshooting and Programming.
Project Name: RABIGH (III) Electric Power Plant & Independent Water Power Plant (IWP) withTiejunElectric Power Engg. Co Limited under main Client SEPCO Saudi Arabia Electric Power Construction Corporation.
Responsibilities and Achievements:
• We worked in MV Panel Room, LV Panel Room, Batteries and UPS Room, VFD,s Room, MV Motors, Instrumental, and Control JB,s
• Cable Tray Installation and Cable Trunk & Cable Ladder, Panel Termination, Motor Termination in areas including Intake Section, Steam Tanks section, Chemical Treatment Section, Post Water Treatment Section,Polymer Extraction, RO(Reverse Osmosis) plant, Waste Water Treatment etc
• Supervised &Managed all site activities related to work performance, team management, Client dealing, and Manufacturer dealing.
• Performed electrical testing of completed hardware, including continuity IR, PI, ER, HV by using megger, HiPot testers and other Test equipment.
• Cold and Warm commissioning of all type of control Instruments and power equipment(Motors, Circuit Breakers, Isolators switches).
Project Name: SOYA(II) Feed Mill Plant DSE(Down Steam Extraction) Construction
Here we are working on SOYA(II) Feed Mill Plant DSE(Down Steam Extraction) Construction Project at Yanbu Industrial Port.
Responsibilities and Achievements:
• Performed in-depth electrical acceptance testing of completed hardware, including continuity and high-potential isolation testing using MeggarHiPot testers.
• Created protocols, qualification documents, test plans and test reports for quality assurance purposes.
• Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems for PLC and Human Machine Interface.
• Performed and Installed Electrical Wiring Lighting Conducting, Termination & Testing, Small Power System (Single way Socket,Twin Socket, and Industrial Socket Three Phase and Single Phase Socket SMDB and DB, FCU wiring and termination, cable Tray Installation and Cable Trunk & Cable Ladder, isolator switch and Cable Termination, MCC Panel and Motor Termination, Cable Pulling Work, etc
• Managed all site activities related to work performance, team management, Client dealing, Manufacturer dealing
• Supervised overall generally includes Power Distribution including LV and MV Substation, control and Instrumentation.
• Cold and Hot commissioning of all type control Instruments and power devices/equipments (Motors, Circuit Breakers, Isolators switches, Chain Hoist etc)
Responsibilities and Achievements:
• Performed load calculation for sizing wire and circuit protection.
• Initiated project management knowledge study and subsequently standardized project management practices.
• Performed Maintenance and servicing of whole Power system including Electrical Panels Distribution Board Sub DBs etc (Marriot Hotel Islamabad)
• Worked on Relocation of Existing Generators Systemat Saudi Pak Tower Blue Area
Islamabad
• Worked on Alternative source/ Route of Power supply to 2000Amp BTD at Saudi Pak Tower Blue Area Islamabad
• Prepare Drawing of whole Electrical Power Supply and control cables/wires System of Saudi Pak Tower (22 Floors) by using Autocad
• We performed major operations Supply, Installation & Commissioning of Medium voltage (11 KV) Switchboards, Low Voltage electrical Switchgear, Power Factor Improvement Plants, Generators, ATS & Synchronization Panels, Earthing, Lightning & Surge Protection Systems, Operation & Maintenance of Electrical Networks, Power System Audit, Electrical consultancy services.
Responsibilities and Achievements:
After just Degree Completion, I have also working Experience of Senior Electrical
Technician at Pakistan Oilfield Limited
Projects:
1. Attock Oil Refinery Shutdown Project Rawalpindi Pujab Pakistan
2. Construction of Residential Towers (POL) Khaur
3. Shutdown & Maintenance at Meyal Oil Plant
• Working experience of Oil & Gas Plant and also Refinery Plant
• Working on Electrical Structural & Design Drawings, Power wiring, Fire Protection,
Normal and emergency lighting.
• Maintained smooth operations of Maintenance through effective and efficient technical
skills.
I have also work as an ELECTRICAL SUPERVISOR At HABIB RAFIQUE CONSTRUCTION PVT LTD dated
from 02/2015 – 05/2018 Bahria Town, Islamabad
Project: Bahria Town Project and DHA Islamabad Pakistan
Responsibilities:
Supervising at a Housing Project Erection of Electrical Poles , Distribution Transformers
,Generator Switchgears (slap and wall conducting ,Electrical wiring, Electrical fittings ,DB,s and Service line
Grounding ) by using Electrical Standard and Drawings
Manufacturing Power,Distribution and Instrument Transformers
Achievements/Tasks
Understanding the Manufacturing Process of Winding, Core, Insulation, Assembling and Transformer Body
Detail Study Of Current Production Of Industry
Research and Improvements In Production and Marketing of Industry .
Rawalpindi
Technical Training Institute
Achievements/Tasks
Understanding of House wiring, Power Wiring, Industrial Installation, Cable Cladding, Cable Jointing, Cable Pulling
3-Phase Star Delta Circuits, Automatic Motor, generator controlling with Timer
Khaur, Punjab Pakistan
Oilfield Company
Achievements/Tasks
Electrical Maintenance
Installation of Power wiring, House Wiring