خلاصہ

Civil engineer with 04 years of industrial and residential building construction

پراجیکٹس

Fast Cables Unit-2 Raiwind Lahore
Nullah Lai RCC Lining, RDA/WASA Rawalpindi
NScS Block Amry Cantt Multan

تجربہ

کمپنی کا لوگو
Project Engineer and Planner
Jabcon Pvt Ltd.
دسمبر ۲۰۱۷ - موجودہ | Islamabad, Pakistan

Projects

1. Nullah Lai RCC Lining, RDA/WASA Rawalpindi
2. NCsE Block, MES G-Army/Services Multan

Responsibilities

1. Project Planning
2. Supervision
3. Quantity Surveying

کمپنی کا لوگو
Project Engineer
Fast cables Ltd.
جولائی ۲۰۱۵ - جولائی ۲۰۱۷ | Lahore, Pakistan

Responsibilities

1. Construction supervision and Quality control
2. Designing and Planning
3. Quantity surveying

Work done

Construction Supervision and Quality Control
Foundations for PEB shed of Hall-1, Hall-2, Hall-3
Construction of heavy machine foundations
Supervision of Hall-1 PEB shed by Izhar and Hall-3 by Metallic solutions
132 KV Grid station Fast Cables (Foundations, metering room, control room and boundary wall)
Construction of substation/utility block
To entertain the problems during erection of machines
Construction of triple story CCV Line building having heavy machinery
Construction of double story building having stores, living accommodation, gate office and check post
Construction of double story administration block
Horticultural work of Lawn
Construction as Client Contractor
Construction of machine foundations in Hall-1
Design work
Master Plan of Unit-2 in viewing production facilities, industrial by laws and optimum land use.
Structural designing and drawing preparation
Machine foundations
Hall-2 Laboratory
Central Substation and Utility Block
Machine arrangement design in lights of production for Hall-1(Main Production Hall), Hall-2(ABC Cable and Conductor Production Hall), Hall-3(Aluminum Plant), Hall-4(Copper Plant) and CCV Line
Grid Station Layout
Electrical Plan for building and street lightening
Fire Fighting Plan for building(i.e. Smoke Detectors, fire extinguisher and FHCs) and overall factory (i.e. Fire hydrants)
Security system through Security Cameras
Storm Water Drain system
Contractual and Quantity Surveying Work
BOQs and tender document Preparation for tendering
Rate Analysis and company construction rates preparation
Contractors Bill Verification
Audit (Final Bill Audit) after work completion
External Audit Support
Planning of construction and auxiliary work (Time analysis on MS Project Planner).
Construction and technical support to OEM during erection and commissioning of machines
Overall construction work management

کمپنی کا لوگو
Assistant Planning Engineer And QC
Fast Cables Ltd.
نومبر ۲۰۱۳ - جولائی ۲۰۱۵ | Lahore, Pakistan

Work done

BOQs analysis for contract of not only for civil work but also for the contract for Cable machinery local and international contract.

Auto CAD related work like factory drawings for planning and designing of machine flow, firefighting plan and security system.

Planning of construction and auxiliary work (Time analysis on MS Project Planner).

Construction supervision and quality control.

تعلیم

University of Engineering & Technology
بیچلرز, بیچلرز ان سائنس, BSc Civil Engineering‎
PRC, Soil Mechanics, Steel Structure
CGPA 3.52/4
2015
BISE Multan
انٹرمیڈیٹ / اے لیول, فیکلٹی آف سائنس (پری انجینئرنگ), FSc Pre-Engineering‎
Phys, Chem, Maths
فی صد 88%
2011
BISE Multan
میٹرک / او لیول, سائنس, matric‎
PHYS, CHEM, BIO
فی صد 91%
2009

پیشہ ورانہ مہارتیں

ماہر 2D Drawaing
متوسط Civil Planing
متوسط e tabs

زبانیں

متوسط پنجابی
متوسط انگریزی
متوسط اردو

Tauqeer آپکے جاننے والے

Muhammad Raheel
Agha Steel Industries Limited