خلاصہ

I did B.Sc. Mechanical Engineering from Engineering University Peshawar. Also recently completed MBA from Virtual University of Pakistan. I have 8 Years of Professional Experience in Planning, Contracts, and Procurement etc. My work summary and CV is attached.

I worked with Hewadwal-AZETQ JV on multipurpose Dam Project (including earth filled dam, spillway, flood channel, power house, canals, roads, contractor site camp buildings and staff colonies). I performed a number of tasks which are listed in much detail below.

I worked with Wind Engineering and Construction Company as Contracts Engineer/Proposal Writer. Here my responsibilities were to work on different projects, checking its design drawings, and making complete cost estimations for the project, preparing the complete Proposals documents for different clients. I had worked with Tramco Group of companies as HVAC Design Engineer (www.tramco.de). My job in Tramco was to calculate the load and to select a suitable HVAC system for a building. I also know the roles and regulation of the local engineering & other international construction companies as well. Beside this I also know the basic principles of management as an engineer.

I have got professional courses online from some of the best universities and institutions that are related to project management and planning which gives me the in depth knowledge and enhances my understanding about project management.

پراجیکٹس

Detailed Design & Construction of Dam Project

تجربہ

کمپنی کا لوگو
Engineer
Hewadwal-AZETQ
فروری ۲۰۱۳ - جولائی ۲۰۱٦ | Herat, Afghanistan

In the Capacity of Mechanical Engineering;
• Fabrication, Assembling & Installation of Mechanical components in the First Stage & Second Stage of Concrete during the construction of Intake Tower for an earth filled Dam,
• Fabrication & Installation of Trash rack, stop logs, slide gate, Intake coarse Trash rack, Stop log panels, Intake fine trash rack panels, Intake Stop log panels, Guard gate etc.
• Procurement & installation of 20 Ton Gantry Crane at top of Intake Tower,
• Installation of lifting beams,
• Fabrication of Bell mouth Transition, Intake Transition, Steel pipe 2m dia & 133m long (in 6m [pieces), Wye bifurcation,
• Procurement of butterfly valves 1.5m dia (hydraulic actuation & bypass system), Radial gate, etc.
• Fabrication & Installation of Penstock, hollow jets, irrigation valves,
• Welding, painting & testing all works as per design, codes and specifications,
• Assisting the Procurement manager and the mechanical supervisor in the technical procurement of heavy earth moving machinery & plants and the installation of the plants (Asphalt Plant, Concrete Plant, Crush Plant) at the site camp,

In the Capacity of Project Planning and Scheduling;
• Deeply analyze project scope, budget and work statements,
• Prepare Work Break down Structure or Work Package for the entire Project from higher hierarchy level to the sub project level and down to the activities/Tasks level,
• Under the WBS prepare a list of single activities/tasks and sub tasks,
• Prepare a network diagram and dependencies among the WBS & their respective activities,
• Calculate the time and budget of each activity and allocate the required type of resource (equipment, labor, material),
• Able to find the longest path or critical path and hence the critical activities of the Project,
• Able to make as soon as possible vs as late as possible schedule for the project,
• Preparation and submission of quarterly and annual budget plan,

کمپنی کا لوگو
Contracts Engineer
Wind Engineering & Construction Company
ستمبر ۲۰۱۰ - دسمبر ۲۰۱۲ | Kabul, Afghanistan

• Practically working on a Design Build Project under the FIDIC form of Contract,
• Understand and able to execute the project works in the light of applicable clauses of contract requirements,
• Aligning the actual work with the contract and design specifications of the Project,
• Resolving issues with the client in the light of applicable Contract clauses such as time claim, appointment of nominated subcontractor, submittals of drawings/design documents etc.
• Preparing the (time, budget & scope) claims using retrospective analysis of the project data such as Project Baseline Schedule, Project Budget Variation & Project Scope Variation, delays in design approval, letters, emails, minutes of meetings, comments on submittals and any other relevant record, extensive analysis of the communications with the client and design consultant,
• Acquiring the tender documents from different websites
• Preparing the documents of Request for Proposal, Prequalification RFP, and Expression of Interest documents for a project,
• Reviewing the projects data for its feasibility,
• Working on the Waste Water Treatment Plant Projects regarding its capacity for the available population, getting its prices from different manufacturers, and reviewing its design drawings.
• Corresponding with the clients, meeting with the clients when a project is awarded,
• Estimation of quantities for Mechanical work, Electrical work as well as civil work.
• Preparing the Technical Proposal and Cost Proposal for different clients such as USAID, UNDP, UN Habitat, UNOPS, Afghan Government Ministries, IRD, and other Clients.
• Scheduling and Project Planning of works for any infrastructure project using MS Project 2007 and Primavera 6.
• Preparing and updating the company profile,
• Hiring the suitable experienced and qualified personnel for the required job in the company,
• Supervising all the bidding documents for a required project.
• Participating in pre bid meeting, site v

کمپنی کا لوگو
Mechanical Engineer
Rasool Wardak Alifie Road and Building Construction Company
فروری ۲۰۱۰ - ستمبر ۲۰۱۰ | Ghazni, Afghanistan

• Preparing and updating comprehensive Schedule of Works using Primavera or MS Project.
• Determining accurately the amount of materials, manpower, equipment and the required budget within the allotted time.
• Preparing monthly progress claim.
• Preparing AutoCAD shop drawings as required.
• Designing, installing and commissioning of RCC Pipes Manufacturing Machine in Ghazni.
• Installing of Crash Plant, Asphalt Plant and Concrete Plant for the Road Project in Ghazni.
• Running Maintenance of the Plants.
• Designing of Road Section for finding the CUT and FILL using AutoCAD Software.
• Proposal writing for getting a project from Clients.
• Maintenance of the construction Machinery used for road construction.
• Designing of a camp for the company in Ghazni.
• Designing and executing the electrical work related to 200kv generator, water supply lines, drainage system and sewerage system in the camp.

کمپنی کا لوگو
Mechanical Engineer/HVAC Engineer
TRAMCO Group of Companies
جولائی ۲۰۰۹ - جنوری ۲۰۱۰ | Kabul, Afghanistan

• Calculating the Heating and Cooling load for a building manually (using ASHRAE 2001 Fundamental Handbook) in Excel Sheets;
• Similarly using software i.e. Elite and Carrier E20-II for load calculations.
• To Design Complete HVAC System on the basis of Architectural Drawings.
• Progress the Design Jobs with necessary coordination with Project Architect, Structure (Civil) Engineer and with other services like Electrical, plumbing and firefighting etc.
• To calculate/provide Electrical Engineer the complete Electrical Load for HVAC system at every stage of design for their necessary action.
• To coordinate with Architectural and structural personal for necessary Wall openings, shafts, false ceiling, raised floors etc.
• Design complete HVAC system for all types D/X and Air/Water Cooled – including all the equipment like DX Units, Fan coil units, Air Handling Units, Energy Recovery Units, Central Heating System, Chilled Water Pumps, Expansion Type (Closed/Open Type), Air separator, Cooling Towers, Air/ Water Cooled Chillers etc.
• Design of Duct System for Supply/ Return air, using equal friction method.
• Design of Chiller water, condenser water piping system for supply and return.
• To prepare the specifications / checking the design drawings for the ongoing projects.
• To make the estimate of quantities and cost for the project and prepare the Bill of quantities.
• To enquire for the prices and specifications called for the particular project for all the equipment like DX units, Air Handling Units, Chillers etc.
• To attend the client meetings for their necessary demands/comments and incorporating them.
• Preparing Cost Proposal and Technical Proposal for getting a project from the clients other contractors etc.).

کمپنی کا لوگو
HVAC Trainee Engineer
LRH HVAC Plant Peshawar
جولائی ۲۰۰۸ - جولائی ۲۰۰۹ | Peshawar, Pakistan

• Practically understanding the Lithium Bromide Vapor Absorption system;
• Studying its parts and the way it operates;
• Helping the Technician and Workers in the Running Maintenance of the Air Conditioning Plant;
• Annual Shutdown and complete maintenance of the plant in the month of October;
• Studying the Load Calculation, Duct Sizing using suitable CFM, and hence suitable AC Plant for a building, both by manual method and also by using software for HVAC Design, such as Elite and Carrier E20-II.

کمپنی کا لوگو
Internee
OGDCL (Oil & Gas Development Company Limited)
جون ۲۰۰۷ - ستمبر ۲۰۰۷ | Karak, Pakistan

• Studying in Oil Field, the general equipment such as dehydration plant, pressure vessels, chillers, separators, compressors, pumps, oil storage tanks, instrumentation, piping ,valves etc. used in the oil field for processing the well stream into oil , gas and water along with sand and rock particles through the whole plant;
• Designing the Pipeline in two stages i.e. from well stream to separator and then from separator to manifold;
• In pipeline designing, I designed its Diameter, Thickness, weight per foot, sag between two supports, from available data of the well given from geological survey;
• Similarly designing the Separator, which is separating the well stream into oil, gas and water, the major components. I found its length, thickness, diameter from the available data using complicated formulae.

تعلیم

Virtual University of Pakistan
ماسٹرز, ماسٹرز ان بزنس ایڈمنسٹریشن, MBA‎
Human Resource Management
CGPA 3.4/4
2017
NWFP University of Engineering & Technology
بیچلرز, , Bachelors of Science(HONS.)‎
mechanical
2008

پیشہ ورانہ مہارتیں

ماہر Conservation Awareness
ماہر Cost Estimation
متوسط Earned Value Management
ماہر Evaluating Risk
ماہر Mechanical Works
ماہر Reporting Writing
ماہر Technical planning
ماہر رسم الآلات

زبانیں

ماہر پشتو
متوسط اردو
متوسط انگریزی

Muhammad آپکے جاننے والے

Andeela Riaz
DAR Engineering
HafizRameez Rameez Ansari
IBA - Institute of Business Administration
Seemab Rashid
United Nations Development Programme
Sophia Atif
Target Systems
Zainab Altaf
Furniture Hub