خلاصہ

Having 10+ years of Work Experience in Oil & Gas Sector Currently Working in Al-Karrar Engineering as Construction Manager TAR & Maintenance. Experience in EPC Projects of Plant Dismantling & installation / Construction / Commissioning etc.; Pipeline Laying, Wellhead Construction Projects, Vessel Repair etc.

SPECIALITIES:

Maximo
Crystal
Primavera P6
Planning & Execution
Tender Documents Preparation

پراجیکٹس

GPF-IV Upgradation Project (PPL)
Relocation of Rehmat Gas Plant (RGP) to Gambat South, for Setting up GPF-IV
KPD PC-1 Project OGDCL

تجربہ

کمپنی کا لوگو
Construction Manager (TAR & Maintenance)
Al-Karrar Engineering Co. for General Contracting Ltd.
فروری ۲۰۲۲ - موجودہ | Al Basrah, Iraq

JOB RESPONSIBILITIES• Preparing and submitting CTR (Cost Time & Resources)• Overseeing all onsite and offsite constructions to monitor compliance• Coordinate and direct construction Site Team Leads• Meet contractual conditions of performance• Review the work progress on daily basis• Prepare internal and external reports pertaining to job status• Preparing & Analysing Reports to keep the Schedule on Track.‎• Plan ahead to prevent problems and resolve any emerging ones• Analyse, manage and mitigate risks• Ensure quality construction standards and the use of proper construction techniquesPROJECTS- Client : ROO (BP/CPECC/BOC)- Project Details : Vessel Repair (Cleaning, Nozzle Repair, Belly Plate Replacement etc.)- Pre-Fabrication of Piping & Supports in Workshop - Piping, Civil Cast-in Situ / Pre-Cast Support Installation at Site- Shutdown Works

کمپنی کا لوگو
Construction Planning Engineer (Team Lead)
United Energy Pakistan Limited
فروری ۲۰۲۱ - جنوری ۲۰۲۲ | Badin, Pakistan

Manage Construction Planning & Document ControlSupport Arranging KOM and Taking MOMPreparation & Tracking of Construction SchedulesPreparing & Analysing Reports to keep the Schedule on Track.Management, Upgradation & Optimization of Data using Maximo & Crystal SAP.Contractor Performance Management.Maintain & Record HSE/Quality/Performance of Contractors using CAP Google FormMaintain record of TQ\'s & all other Construction data.Follow up & Manage regarding Preparation & Revision of Modules & Procedures.Raise PR’s and keep track of borrowed MaterialMaintaining zone wise CRF/CWO status & Package Closure.Coordination with PSCM for BPO, PR Status, PO issuance & Other Financial Matters.Monitoring & Updating the KPIs of CSS team.Prepare Presentation for quarter performance review.Maintaining & record keeping of NCR, Quality Alerts, HSE Violations of Contractors.Follow up with Admin Planner & Material Planner.

کمپنی کا لوگو
Proposal Engineer
Top Engineering Construction
جولائی ۲۰۲۰ - جنوری ۲۰۲۱ | Karachi, Pakistan

Quantity Estimation from DrawingsCost Estimation

کمپنی کا لوگو
Project Planning Engineer
Pipelink Construction (Pvt) Limited
جنوری ۲۰۱۵ - جون ۲۰۲۰ | Karachi, Pakistan

Duties & Responsibilities at Site:• Submitting daily Progress Report & Strength Report of all Disciplines to Client.• Attending Client & Internal meetings• Updating Daily Progress Monitoring Sheet.• Submitting Weekly Over head Schedule to Clients.• Prepared weekly & Monthly Progress Reports & Over heads For Next Month• Up Loading & Tracking all Activities Status on Primavera P6.• Update S-Curve Using Earned Value b/w Planned Vs Actual Progress % of Estimated Wts.• Prepared Progress Graphs of Duration & Cost Vs Actual & Planned %Progress. • Prepared Activities Progress bar chart.• Mentioned Cost Performance Index (CPI), Schedule Performance Index (SPI), and Cost Variance & Causes of delaying project Schedule & Cost Variance in Report.• To identifying such Critical activities which cause delaying the project Schedule.• Alarming to Responsible Managers about Schedule IssuesJob Responsibilities at PCL Head Office:• Tender’s Evaluation• Project Scheduling in Primevera P6 & MS Project 2010 for Bids• Controlling & Monitoring Project Schedule form HO.• Resource Loading& S-Curves• Costing Assistancy in Projects• Technical Procedures Development• Labor & Equipment Histograms• Development / Modification of Organo-Gram• Tender package preparation• Site Work Monitoring from HO& Monitoring sheet preparatoin & maintaining.• HSE & QC Documents Preparation& Review for Bids• Preparation & Updation of S-Curves & Histograms b/w Planned Vs Actual Progress % of Estimated Wts.• Dia-Inches Calculation & Drawings Evaluation• Join Pre-Bid, Bid Opening & Site Visits Meeting for UEP, SSGC, SNGPL, OMV, ENI, OGDCL,PPL, PAPCO/PARCO, PSO etc.• Preparation of BOQ.

کمپنی کا لوگو
Project Planning Engineer
BST SERVICES
مئی ۲۰۱۳ - دسمبر ۲۰۱۴ | Karachi, Pakistan

Duties & Responsibilitieso HAZOP Scriber for HAZOP Study under the supervision of HAZOP Chairman & developed HAZOP detailed Reporto Project Scheduling in Primavera P6&MS Project 2010o Controlling & Monitoring Project Scheduleo Resource Loading & S-Curveso Tender’s Evaluation &Develop required technical Documents at the initial stageo Established Procedures of Dismantling, Installation, Pre-Commissioning, Commissioning, Transportation, Rigging etc.o Worked on Cause & Effect Charts.o Understand and worked on DCS, PLC, ESD & F&G system logics.o Assistance in Engineering Management and QC documentationso Equipment Technical Evaluationo P&IDs, PFDs Evaluationo New Equipment PO preparation e.g. HCDP unit, Condensate Stabilization unit etc.o Pre-Commissioning & Commissioning Procedures developmento Piping Equipment Layouto Costing of projectsProjects:1. RELOCATION OF CHACHAR PLANT TO SHAHDAD WELLSITE, SUPPLY AND INSTALLATION OF ADDITIONAL PROCESS & UTILITY EQUIPMENT AND ALLIED SERVICES FOR SETTING UP SHAHDAD GAS PROCESSING FACILITY
2. Construction/Welding and installation of “8 inch dia buried and aboveground pipeline” from Kinza Well X-1 to Sharaf Plant.- Pakistan Petroleum Limited
3 Construction/Welding and installation of “16 inch dia buried and aboveground Sales Gas pipeline” from Sharaf Plant to SSGCL S3- Pakistan Petroleum Limited
4. Construction/Welding and installation of 4 inch dia buried and aboveground pipeline. Flow line from Chachar gas field to Kandhkot field - Pakistan Petroleum Limited.
5. IEE (Initial Environment Examination) of Gambat South EWT (extended well test) Drafting including Plant and Pipelines.
6. Replacement of bottom plates of Condensate storage tanks at Adhi Gas Field-Pakistan Petroleum Limited.
7. Drilling Site preparation and executed Conductor Casing run to 41 m depth using drilling machine at Falah X-1 Shahdad-pur Gambat block.

تعلیم

NED University of Engineering & Technology
بیچلرز, بیچلرز ان ٹیکنالوجی, Bachelors in Engineering‎
Petroleum and Gas Technology
CGPA 3.7/4
2012
Govt. Dehli College
انٹرمیڈیٹ / اے لیول, فیکلٹی آف سائنس (پری انجینئرنگ), HSC‎
General Science
فی صد 86%
2008
Al-Hera Secondary School
میٹرک / او لیول, سائنس, SSC‎
General Science
فی صد 83%
2006

پیشہ ورانہ مہارتیں

ماہر Civil Planing
ماہر Handling Assignments
متوسط LTN
متوسط PHA Pro 6
ماہر Social Studies Subject Command

زبانیں

متوسط انگریزی
ماہر اردو

Muhammad آپکے جاننے والے

Jamal Abdul Nasir
New Track Computer Daharki