Dear HR Manager,
With humble greetings,
My background includes serving as a Site Electrical Engineer within client, customer and retail environments. Most recently, I worked on the service desk for Imtaiz Super Market, where my responsibilities included but not limited to handling all electrical site work , contractors working progress, BOQ making, Bills, Working meetings, checking work as per site drawings.
Previously, I worked with K Electric as Assistant Engineer HT operation. I have worked in R-II region at more than 40 Feeders to attend fault complaints preventive maintenance, and shut down working. In these positions, I demonstrated the ability to resolve a variety of issues and complaints (such as contractors matter, billing disputes, service interruptions or cutoffs, repair technician delays/no-shows and equipment malfunctions). I consistently met my call-volume goals.
In addition to this experience, I gained considerable technical skills during my past employment as a Electronic Technician with Saudi Bin ladin Group KSA.
I also bring to the table strong computer proficiency in MS Word, MS Excel and CCMS applications. Please see the accompanying resume for details of my experience and education.
I am confident that I could be a good candidate if I got a chance to meet with you.. Please call me at +92-333-2473749 (cell). Thank you for your time—I look forward to learning more about this opportunity!
Sincerely,
Sincerely,
M.irshad Haider
Manage all Facilities Contracts and contractors, and maintain review process for contracts such as (Site security, waste management, FA&FF systems, CCTV, Thermo graphics, Solar, pest control, HVAC, MEP, Swimming pool, Landscape, Elevators, Gen sets and Cradle system.)Carrying out regular site audits and daily inspections to identify any areas that need upgrading or repairing.Conducting On job training, tool box talk and team briefing to technical team.Liasioning with SSM contractors & other sub-contractors.Validating, verifying & ensuring the completion of planned maintenance tasks & additional client requirements on time.Preparing method statements, risk assessment for various maintenance activities in coordination with quality team.Reporting day to day site activities to the client as per the escalation matrix.
Electrical Site Engineer.Installation of following items as per drawing • Electric Bus bar 1000 Amp, 630 Amp, 100 Amp, 25 Amp • Conduit wiring, General wiring • Lighting system, Down light, Tracking Light, panel light • Lighting bus way • Grounding & Lightning. • Fire Alarm System. • Telecommunication system. CCTV, Access Control • Cable Tray installation. • BOQ, MOQ making and billing • Preparation of Electrical procedures for installation test & commissioning. • Designing and supervision of maintenance procedures • Attending Technical and progress meetings on site. • Reading electrical design specifications and technical drawings. • Organizing routine servicing schedules. • Handling of electrical progress at the site with all contactors for equipment • Sizing, cable sizing, CBs sizing. Documentation and Coordination • Making weekly Progress reports • Making P/O Purchase order for Material • MAR Material approval request for purchasing electrical materials. • Coordinate with Clients, Project Management team Project Inspection division. • Coordinate with Subcontractors and other Staff. • Coordinate with other discipline such as Civil, Mechanical, Piping (for clearance). • Coordinate with Engineering/Designing/Planning & Schedule department.
• 11KV Operation of distribution lines more than 950 transformers
• Sub Station operation of Switches, isolators, bulk supply etc
• Siemens, Schneider electric, F&G, Alstom, Ariva RMU operation
• Link, Jumper, Bus bar, lugs fault tracing and repairing
• Inspection and testing of cables and overhead line transmission like cables, conductors, surge arrester, Termination and joints and related accessories.
• Analyzing customer applications and designing protection and control schemes to fulfill user specifications and requirements
• Operations on tripping and faults of 11KV feeders to propose strategies for minimizing them.
• Synchronizing of more than 44 feeders 11KV.
• Arranging proper shutdowns for maintenance and augmentation purposes.
• Maintain Regularly TBT (Tool Box Talk) with Team Workers.
• Proving properly isolated environment for fault rectification and maintenance.
• Ensure all SOP's to perform any operation
He is loyal professional while working on projects. I saw him as deep thinker and totally aggressive to finish the job, to guide the team as leader. He find the solution from core to finish. I really wish him to happy in future.