To attain challenging and dynamic opportunities in a progressive organization, allowing professional growth in cutting-edge inspection field and helping create competitive advantages in the market place.
PROFESSIONAL PROFILE
Ambitious and seasoned Inspector with more than 4 years experience in the field of Assets Integrity Management in world’s know oil, gas and energy fields. Strong technical background in Non-Destructive Testing (NDT) and In-Service inspection. Plan, execute and enforce the inspection for the systematic examination, testing and integrity assurance of in-service pipelines, pressure vessels and storage tanks using with conventional and advance NDT techniques along with relevant codes and standards. Take initiative to develop effective solutions to problems with proactive and dynamic approach to work and getting things done efficiently and within scheduled time.
MAJOR PROJECTS
International Project:
• Perform Assets Integrity Inspection of Steam Boiler at Omni-Cane Power at Mauritius.
• Calculate the remaining life & Remaining Corrosion allowance of Boiler.
• Find the internal & external interval of Inspection.
February 2018 API 510 Pressure Vessel Inspection at K-Electric
• Perform Visual inspection as per API 510 inspector for internal and external inspection of Boilers, Air Receivers vessel etc.
• Calculate the Remaining life & Remaining Corrosion allowance of Boiler& Vessels.
• Find the internal & external interval of Inspection.
Jan 2018 API 510 Fire Tube Boilers at GSK (Jamshoro OTC & S.I.T.E Karachi)
• Perform Visual inspection as per API 510 inspector for internal and external inspection of Boilers.
• Calculate the Remaining life & Remaining Corrosion allowance of Boiler& Vessels.
• Find the internal & external interval of Inspection.
Nov 2017 API 510 Fire Tube Boilers at Razzak Associates (S.I.T.E Karachi)
• Perform Visual Inspection as per API-510 and as per Construction Code.
July 2017 Shutdown of ENI Pakistan
• Perform Visual Inspection as per API-510.
• Calculate the Remaining life & Remaining Corrosion allowance of Vessels.
• Find the internal & external interval of Inspection.
October 2017 Pressure Vessel Fabrication Testing at ASIA Yard & Metcraft
• Perform Ultrasonic Flaw Detection on pressure vessel weld joints
• Perform Penetrant Testing on Pressure Vessel Weld joint
March 2016 Shutdown of Lotte Chemical Pakistan Limited
• Perform ultrasonic testing (Thickness measurement, Ultrasonic flaw detection) of pressure vessels weld joints
• Perform magnetic particle testing of pressure vessels weld joints
June 2016 Shutdown of United Energy Pakistan Limited (UEPL) at Kausar Gas Field
• Perform ultrasonic testing (Thickness measurement, Ultrasonic flaw detection) and magnetic particle testing of pressure vessels weld joint