Graduate Civil Engineer with challenging and target oriented approach. Maintained high grades in education and in professional life. Eager to learn from senior and become a part of the team through professional competencies and flexible nature.
Have worked in difficult terrains of the country including KPK remote areas with successful completion of the projects.
I always keep myself ready for the difficult projects with learning attitude all the time.
Dealing with Following Textile Units:
1. Masood Fabrics (Spinning and Weaving)
2. Roomi Fabrics (Spinning and Weaving)
Projects are:
1. 1.4 MW Solar
2. 2.9 MW Solar
3. Feasibility for Polyester Cotton Unit
4. Insurance Related Matters
5. Maintenance Jobs
· Successful completion of Main Mill Building Project of 920 million. This was being the test by HNMPL Management to prove my capabilities and command on the work. The final submitted bill took a long period of 07-months in verification and correspondence.
· 3600 SQM Warehouse (Civil & PEB) in less than 100 Days.
· TCF (Trim Chassis, Finish) line (2700 SQM) Extension in 180 Days including sub-floor services (Civil & PEB).
· Completion of Plastic Paint Shop, Paint Storage Facility and Parts Warehouse in 210 - days. (Civil, PEB, Double T Roofing) with soil replacement method and dewatering.
· Extension of Main Paint Shop (3000 – SQM) in 180 - days. (Civil & PEB) with piles foundations.
· Centralized Substation (Double Story) Building. RCC Structure with soil replacement.
· Development of Motor Pool Area of 10,000 and then 17,000 SQM with subbase filling and compaction. Used excavated material to save the cost.
· Warehouse Extension (Phase – II) 7200 SQM in 210 - days. Strip Foundations.
· Canteen, Locker and Masjid, RCC Frame Structure in 255 - Days.
· Rehabilitation of old loom shed for Warehouse to store spare parts.
· Construction of Hostel Complex and Approach Roads with an estimated cost of 650 Million.
· Design, BOQ, Drawings and schedule reviews and revisions as per site requirements.
· Budgeting for CAPEX and OPEX Project and monthly forecasting of material and contractor payments.
· Best utilization of the resources, continuous improvement plan for the colleagues through trainings and supportive working environment.
· Liaison with consultant and contractor through coordination meetings on weekly basis.
1. Completed Dialysis Unit
2. Completion of EB - 4 (Yarn Godown) with 13750 SFT Covered Area RCC Structure
3. Roomi Spinning Mill Extension with 80,000 SFT Covered Area RCC Structure
4. Beacon House Extension with Covered Area 42000 SFT RCC Frame Structure
5. Avari Express Hotel
6. Quilting Unit
7. Cotton Godowns (05 - NO)
8. Home Tex Stitching Unit
9. Towel Stitching Unit
Upcoming Projects include:
1. Metro Cash & Carry
2. Hyundai Show Room
Recently completed the Contractor's Offices and Mess Facility on labor rates (First Time in Lalpir Power Limited) from scratch to finish including the space design and using the available material.
Managing all kind of Civil Works of new and existing structures from scratch to finish.
Also a member of Social Responsibility Committee where we plan and execute the small welfare projects for the community education, health and Infrastructure.
Punjab Education Foundation Main Head Office Building
Bidding
Selection of Contractor according to PPRA and PEC Regulations
Review of Design and Approvals from respective departments like LDA, EPA etc.
• Successful bidding and post bidding evaluation of the contractors.
• Close Coordination with the consultant for the designing of multistory head office building for PEF keeping in view the today’s security, Safety and office requirements of CCTV Cameras, Fire Fighting System, Internet and HVAC.
• Approval of the design, BOQ, Cost Estimates, Pre-qualification of firms from Construction Committee of Board of Directors and from Board of Directors of PEF-Lahore.
• Pre-Qualifications, Bidding and Post Qualification of the bidders taking board of directors in confidence and according to the PPRA-Punjab and PEC-Rules.
• Dealt with LDA and EPA-Punjab on NOC issues. SNGPL and WAPDA for the temp and permanent connections of gas and electricity.
Successfully complete the bidding process and contractor selection for PEF Head Office Building with approval from the Board of the Directors.
Lead the team of Site Staff and successfully completed the up gradation project of schools in Peshawar City.