To obtain a position in an organisation that will enable me to use my abilities to a productive use and where my technical skills can be improved.
Led a team of 3 engineers and 17 technicians, optimizing conveyor belt and silo system maintenance, achieving a 5% downtime reduction.
Trained and mentored new engineers, increasing team efficiency.
Enhanced inventory management system for critical spare parts, cutting discrepancies by 25% and improving equipment availability by 15%.
Implemented KPI tracking and root-cause analysis for downtime, reducing corrective action time by 5%.
Directed maintenance operations in clinker processing, overseeing Crossbar Coolers, Vertical Rolling Mills, and conveyor systems.
Responsible for inventory control within my section, involving procurement spares availability, and tracking of indented cases using ERP Microsoft Dynamics 2012.
Erection and commissioning of clinker processing area (Cross Bar Cooler) and coal mill (vertical rolling mill, Atox-25) that includes Bag Filters, Screw Conveyors, Pan Conveyors, Drag Chain Conveyors, and Force Draft fans.
Supervised the erection and commissioning of cement storage silos with a combined capacity of 50,000 tons that includes Bag Filters, Blowers, Compressors, Valves and Air slides.
Supervised the hot vulcanization of 15 steel cord joints and 8 textile belt joints, maintaining detailed checklists for each joint.
Generated daily production and status reports for each product, ensuring comprehensive tracking and documentation.
Prepared weekly production schedule to streamline operations and optimize productivity.
Implemented 5S at shop floor.