Armed with essential skills and knowledge to perform as a domain specialist, having experience of 11 years and more, eager to contribute to the growth of a progressive company with quality products, an ethical work culture and global presence, whilst gaining the immensely needed exposure and valuable experience; I thus intend to streamline my career with quality, integrity, commitment and professionalism to achieve a distinguished status within the company.
Successfully achieve implementation of CMMS in the company.
Successfully completion of projects with cost effective solutions and utilizing inhouse team within the approved timelines.
Saving of huge OPEX amounts by optimizing preventive maintenance plans for site equipment and facilities.
Looking after maintenance of 55 fuel pumps, 10
restaurants and 03 hotels all over Pakistan.
Responsible for developing and renovating business facilities which comes under the umbrella of the company that includes Pizza Max, Ginsoy, Royal Taste, Mings and MESCO. Recently completed 04 projects with in a time frame of 50 days.
Look after timely maintenance of existing 40 branches and equipment installed within the facility all over Pakistan and leading a technical team of all traits to carry out all the maintenance activities for smooth operations.
Leading the preventive and corrective maintenance activities and managing all the facilities under HVAC, Gensets, Firefighting, electrical, plumbing and other hard services and scheduling PPM of all critical equipment on sites
Ensure complete compliance of preventive maintenance through CMMS.
Providing support and supervision to all staff facilities staff (custodians, technicians, groundskeepers etc.) and external contractors.
Ensure timely execution of all set KPIs and increase mean time between failures (MTBF) and decrease meantime to repair (MTTR)
- Developing detailed plans for new designs and projects. - Making determinations for equipment, staff and training needs - Proposing project and program budgets- Hiring and supervising staff- Leading research and development projects that produce new designs, products and processes. - Checking their team’s work for technical accuracy- Ensuring the validity of methods used by staff- Coordinating work with other managers and staff.- Leading the expansions of business with new outlets and facilities from scratch to its operations.- Look after timely maintenance of existing stores and equipment installed within the facility all over Pakistan and leading a technical team of all traits to carry out all the maintenance activities for smooth operations. - Dealing with architects, contractors, suppliers and technical vendors for timely completion of projects.- Completed 12000 SF project of retial outlet in Lahore within given timeline of 45 days. - Currently completed 25000 SF retail outlet under 45 days in Karachi.
As an engineering professional and technical leadership in the facility, ensuring people health and safety, product safety and environment should never compromised and that all engineering activities enhance business objectives, product quality and plant operation/performance
Ensuring optimum decisions are made/implemented regarding factory assets (including Investment cycle), in alignment with the market business strategy. Managing the factory's engineering data.
Monitoring capital investments, ensuring justification, request, implementation, start-up, reporting aligned with Guidelines/TPM. Foster Projects' flexible design to allow adjustment to changing operation requirements.
Enabling high performance operations, by providing assets' Maintenance according to the planned Strategy, using TPM/PM as the multi-disciplined approach to maintain/improve fixed assets.
Ensuring that the utilities' needs of Production are fulfilled and optimized. That all utilities that come/may come in contact with product are treated according to the food safety acceptance criteria.
Dealing with consultant and contractors for timely completion of projects related to construction of new facilities, solar power, fire fighting, HVAC, water treatment plants, utilities such boiler, genset, cooling towers, water pumps etc and up gradation of plant machinery for maximum production and efficiency.
Implementations and monitoring of all mechanical related works at sites as per approved drawings and methods and safety rules related to plumbing, firefighting & HVAC VRF system.
Estimates prepare and assign resources such as manpower, materials, consumables, equipment, tools, etc., required for all Mechanical and related works prior to execution. Plans and analyses all possible construction methodologies and recommends the best options to the construction manager for approval prior to execution at site.
Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
Ensuring the availability of utilities after the completion of project and helping the client in documentation required by the local utility providers such as K.Electric, SSGC, KWSB and SBCA.
1. Development of Preventive Maintenance Schedules.
2. Implementation of Preventive Maintenance Schedules.
3. Execution and Monitoring of Corrective Maintenance.
4. Preparation of Monthly Progress Report.
5. Evaluation of Technical Vendor.
6. Arrange Manuals for healthy equipment operation.
7. Implementation of HSE practices.
8. Finalization of Annual Maintenance Contracts.
9. Development of feasibility reports.
10. Troubleshooting of equipment breakdowns.
Core Responsibilities:
1. Responsible to lead and manage the engineering activities at sites.
2. Ensure smooth and trouble-free operation of all equipment at sites.
3. Responsible for planning and issuance of preventive maintenance plans of all equipment with the consultation of Maintenance Engineers.
4. Development of preventive maintenance plans and scope of work according to OEM technical recommendations.
5. Ensure complete compliance of preventive maintenance through CMMS.
6. Supervise servicing and inspection of equipment including central air conditioning, centrifugal, reciprocating and absorption chillers along with all auxiliaries, heating and ventilation systems, plumbing fixtures, sewerage systems, electrical fixtures and circuitry, emergency generators, pumps, motors, boilers, elevators, RO Plant etc.
7. Provide technical support to Operation Managers and Maintenance Engineers in day to day operation and modification in MEP systems as and when required.
8. Assist Business Development section in technical gap analysis and submit report thereof.
9. Responsible to sign Annual Maintenance Contract of all major equipment on behalf of the company (AAA FM) with an authorized vendor as per OEM guidelines.
10. Ensure timely execution of all AMCs and increase mean time between failures (MTBF).
11. Proactively coordinate with supervisors, maintenance engineers and facility heads of other sections and establish the good working relationship.
✓ Coordinates with UGM’s and SM’s for the purpose of resolving their
branch equipment problems all over Pakistan.
✓ Installs system component parts (e.g. HVAC systems, plumbing,
electrical and gas kitchen equipment, kitchen appliances, etc.)
✓ Performs a variety of preventive maintenance activities (e.g. filters, belts,
thermostats, etc.) for the purpose of maintaining items in an operative
and safe condition.
✓ Prepares written materials (e.g. repair status, activity logs, open/punch
list, etc.) for the purpose of documenting activities and/or conveying
information.
✓ Prioritizes work orders (e.g. importance, location, etc.) for the purpose of
ensuring equipment is repaired in an efficient and effective manner.
✓ Responds to emergency situations during and after hours for the purpose
of resolving immediate operational concerns.
Other Functions
✓ Participates in meetings, workshops, trainings, and seminars for the
purpose of conveying and/or gathering information required to perform
functions.
✓ Performs other related duties as assigned for the purpose of ensuring
the efficient and effective functioning of the work unit.
✓ Responsibilities include resolution & handling technical problems as per project requirement, meeting with client & contractors.
✓ Quality assurance of materials, Inspection of mechanical, plumbing, lift and BMS systems, HVAC system supervision, technical assistance, and pre-qualification of vendors
✓ Verification and modifications of Technical Submittals, Shop drawings, construction drawings and As-Built drawings.
✓ Preparation of B.O.Qs and tenders for chillers, generators, ventilation and exhaust fans, valves and pumps.
✓ Preparation of technical and financial comparisons of equipments.
✓ Rate analysis of project equipment.
✓ Installation of chillers up to 1000 tons, fan coil units, phenolic connections and air grills.
✓ Commissioning of plant rooms.
✓ Installation of plumbing and fire pumps.
✓ Installation of plumbing and HVAC valves.
✓ Installation of firefighting system in high rise buildings as per NFPA codes and standards.
✓ Commissioning and installation of cooling towers.
✓ Advance planning, coordinating and directing the contractors.
✓ Performing the role of a quantity and quality surveyor.
✓ Planning & scheduling for Smooth and economical maintenance of machines &equipments with the help of EAM Module of ORACLE 11i E-Business Suite
✓ Preventive maintenance & trouble shooting of machines.
✓ Plan to minimize the maintenance cost, using lean manufacturing techniques.
✓ Responsible to improve TPM (Total Productive Maintenance) to minimize the down time and increase the OEE and productivity.
✓ Responsible to decrease MTTR and increase MTBF.
✓ Procedures (SOPs and DPs), as per ISO requirements.
✓ Implementation of HSE and 5S system in the department.
✓ Planning and deployment of resource as a shift manager according to work requirement.
Special Assignment (Retrofitting of foaming process)
✓ Worked on implementation of C5 Cyclo-pentane in place of R-141b as a blowing agent and converting all the electrical switching devices into pneumatic switching as well as introduced Ex-proof devices IP-57 in order to prevent from safety hazards.