Having extensive 13+ Year's of experience in Power Planning, Power Implementation, Operation ,BSS , RF & Transmission domain.
•Power expert & Project Management Professional having proven record of Projects & Services delivery in telecom with a strong business development flavor, skilled at value proposition generation, services led solution innovation, managing high level customer interface and high impact projects …
• Managed Services Bidding, Transformation, Transition, Delivery
• OPEX / CAPEX Optimization strategies.
• Financial Management, Budgeting & Monitory Control,
• E2E Project Management for Operational Improvement and OPEX Optimization related projects.
• RFI, RFP & RFQ preparations, negotiation, bid/tender evaluations & Technical Procurement.
• Developing, standardizing, and implementing SOP, Work Flows, and Frame Works
• Prepared accurate and detailed mechanical and electrical drawing sets for system installation.
• Designed and installed customized Solar PV data acquisition systems.
• Visited sites to measure roof dimensions, obstacles location & performed shading analysis using
Solmetric Sun-Eye.
• Financial estimates, budgetary allocation for different cost heads, considering operational needs and urgency as per requirement
• PR/PO Processing ensure timely equipment delivery capping receipt entry invoicing.
• Power Data Analysis and Enquiry & Work Packages Approval.
• Skills have to supervise the field activities (Survey , QA & QC, Dismantling/Re-installation, PAT, model site preparation.
• Timely meeting with vendors and internal stake holders to ensure that Planning for projects is
according to the agreed schedule and guideline.
SKILLS:
• Planning Tools/software’s:
• MapInfo,Google Earth, MsOffice.
• Telco & Non telco Expertise..
• BSS Tools / Software’s:
• LMT Software for SDR (8900 & 8700) both RRU and RSU Solutions.
• IP Based Configuration of Ipaso 200,400 and 1000
• OMT Software for troubleshooting and creation of IDB for Ericsson RBS 6101, 6201, & 6301.
• Minilink craft for Microwave commissioning for CN Node, TN Node including 2P,6P & 20P.
-Design of optimized & scale-able power solutions-Locking technical solutions with suppliers as per requirements-Technical contractual negotiations with NMOs-Timely equipment ordering and availability for forecasted projects-Introducing new technologies and driving trials of new products-Ensuing technical quality inspection of equipment deployed-Level-3 root cause analysis of technical problems
Main responsibilities include.
• Managed Services Bidding, Transformation, Transition, Delivery
•OPEX / CAPEX Optimization strategies
• Financial Management, Budgeting & Monitory Control,
• E2E Project Management for Operational Improvement and OPEX Optimization related projects.
• RFI, RFP & RFQ preparations, negotiation, bid/tender evaluations & Technical Procurement
• Developing, standardizing, and implementing SOP, Work Flows, and Frame Works
• Designed and installed customized Solar PV data acquisition systems.
• Visited sites to measure roof dimensions, obstacles location & performed shading analysis using Solmetric Sun-Eye.
• Prepared accurate and detailed mechanical and electrical drawing sets for system installation.
• Computed accurate takeoffs and prepared the data for inventory analysis, pricing and procurement
• Audit and BoQ Verifications.
• Financial estimates, budgetary allocation for different cost heads, considering operational needs and urgency as per requirement
• Business case preparation for all Power projects.
• PR/PO Processing ensure timely equipment delivery capping receipt entry invoicing.
• Power Data Analysis and Enquiry & Work Packages Approval.
• Timely meeting with vendors and internal stake holders to ensure that Planning for projects is according to the agreed schedule and guidelines
• Network Power Design for Telco Site Including 2G, 3G 4G & USF Special Project
• Provides day-to-day operations of assigned services, responding to facilities/services problems in an efficient and timely manner:
• Verification of SMR, TSS, Work packages & BOQs.
• Quality visits during implementation of network Nodes (MW, BTS, Node B , BSC, RNC ) and dismantling.
• Hardware Installation, Commissioning, testing for BSS (2G & 3G) equipment.
• Hardware Installation, Commissioning, testing for Transmission equipment.
• Maintains accurate records with regard to installations, repairs, inspections of equipment in a timely and organized manner.
• Solving BSS (2G & 3G), and transmission outages.
• Clearing BSS and Transmission alarms.
• Vendor Management
• Acceptance Tests. PAT and PAC.
• Microwave links Re-routing. (Traffic Shifting)
• Troubleshoots, upgrades, and administers multiple vendor systems.
• Responsible for the security, Confidentiality & Integrity, of all information assets within his responsibilities in accordance with the company's Information Security Policies.
• Installation and Implementation of 3G,
• Ericsson RBS Commissioning, Create Install IDB’s & Alarms.
• Mini Link Commissioning , DCN & E1 Routing etc
• Specialist of Indoor/Outdoor Installation of Ericssion RBS6101, RBS6201 & RBS 6301, Delta Rectifier & Battery Bank.
• Installation of Microwave Dish 0.3m ,0.6m,0.9m, Performed Microwave links (1+0,1+1)
• Performed transmission shifting during swap
• Commissioning of Ericssion Micro Mini Link.
• Performed success full cut-over’s at given outage time from customer.
• Coordination with Ericssion Persons about site Activities.
• Provide technical support to the project team.
Rectifier Power Swap South Region
• Installation of Delta Rectifier & Battery Bank
• Commissioning & Configuration of Delta Rectifier
Moblink TSSR Survey South Region / Moblink TSSR Survey Central Region
• Team Lead, Survey and Design Department
• Documents Preparation i.e. Technical Site Survey Reports, Daily Progress Reports, Bills of Quantity etc.
• Providing daily progress to customer and management.
• Survey Reports RAN And Transport
• Civil Survey for Site.(Site layout, Site Measurement , New Outdoor Pad Purposed, Indoor Solution, Existing Cable ,New Cabling Purposed for New Pad
RAN Engineer Relacom (Ericssion) Mobilink Mega Project C2
• Survey of Moblink Sites for Swap
• Documents preparation i.e. Technical Site Survey Reports, Daily Progress Reports, Bills of Quantity etc.
• Providing daily progress to customer and management.
• Alcatel Swap with Ericssion
• Survey Reports RAN And Transport
• Planning and conducting TSSR Survey
• BSS/Transmission Engineer Netkom Technologies (Huawei outsourced)
• Worked at Mobilink Mega Project.
Main responsibilities include
o Survey of Moblink sites for swap
o Completely responsible, for integration, installation and commissioning of BTS and DBS.
o Fault rectification and trouble shooting of BTS and DBS.
o Alarm patching, monitoring and clearing of indoor and outdoor sites
o Achieving the targets by completing the up gradation and new sites
o Transmission shifting
o Dismantling and Re-installations and commissioning unit of NEC Passolink and Alcatel.
o Full hand on Transmission shifting activity indoor MW rack to TMC cabinet
o (Model Site) Installation of Huawei BTS 905A, 1C 900 Rectifier & Battery Bank.
•CM PAK Swap Project (HUAWEI) South Region (HYD)
oInstallation of Huawei DBS3900, RRU 3908 & Battery Bank.
o Swap & Dismantle Ericsson BTS (2116 &2210) DBS 3900 in Zong & Battery Bank.
o Audit Report, ATN
o Pre-ATP (Acceptance Test Procedure)
o Planning and Conducting TSS (technical site survey), Swap activity, E1 Clearance
o Working on Huawei RTN 900 and 600 series.
o Performed Microwave links 1+0,1+1,2+0(XPIC1+0),2+1(XPIC1+1) ,FD and SD installation, commissioning and troubleshooting
o Performed transmission shifting during swap
o Planning and conducting TSSR and LOS survey
o Performed success full cut-overs at given outage time from customer.
o Coordination with Huawei Persons about site Activities
• DG Telecom
o Installation Testing & Commissioning of DG Microwave With CM Pak project
o Installation of Cabinet for Microwave Radio link to Convert IDU to New Cabinet Transmission Media With E1 Patching
BSS Engineer
o Indoor / Outdoor Installation of BTS site.
o Labeling
o 2116 RBS for Ericsson
o Microwave Performance
o Dual Band Site Installation of BTS Site
o Alignment
o Road Site Installation of BTS site
o Equipment Receiving on Site.
o Installation of Ericsson Mini Link, Traffic node & High Capacity System