خلاصہ

A position among professionals, that allows me to utilize my knowledge& experience and give me opportunity to use a system approach and focus on the process redesigning for achieving quality, continuous improvement and cost effectiveness for your organization. Business optimization is key to become market competitiveness and to make speed of market.

پراجیکٹس

Lean Manufacturing Facility Design
Speed To Market (STM) Project
CO2 Emission Reduction
Installation Of 550K Muffler Assembly Line

تجربہ

کمپنی کا لوگو
Section Head Planning
Interloop Limited
جولائی ۲۰۱۷ - موجودہ | Faisalabad, Pakistan

I am working as Section Head Operations in Hosiery manufacturing Unit.

کمپنی کا لوگو
Asst. Manager Production
Pakistan Spring & Engineering Co. (Pvt.) Ltd. Sheikhupura.
دسمبر ۲۰۱۲ - جون ۲۰۱۷ | Sheikhupura, Pakistan

• Collect the customer order/forecast demand from Supply Chain Dept.
• Develop the Aggregate Production Plan (APP)
• Develop the Master Production Scheduling (MPS)
• Develop the Material Requirement Planning (MRP)
• Develop Capacity Requirement Planning (CRP)
• All plans are developed using Enterprise Resource Planning (ERP)
• Develop the Production plan of each job shop or cell
• Daily monitoring of production against production plan
• Removing of bottleneck process/operation by line balancing or workload balancing
• Communicate & remove the effect of issues those can disturb the master production schedule
• Communicate weekly production report to top management
• On job training and meeting regarding production & operation controls
• Definition of KPI’s for production
• Employees performance tracking against KPIs
• Ensure the documentation is being done as per standard QMS (ISO 9001:2008)
• Production downtime analysis and make CAP to remove these downtime and increase the capacity
• Kaizen the new ideas to increase the productivity and its implementation that can be through 5S, removal of 7-watse, Poke-Yoke, Value stream analysis (VSM), Basic QC tools, Line Balancing, One-Piece Flow, Quick Changeover (SMED), designing jigs/Fixtures, Layout Design, redesign the workstation,.. etc.
• Implementation of Lean Manufacturing and reduction of all inventories, so to minimize material cost.
• Ensure total coordination to QC/QA dept. against quality issues, analysis of Process rejection, customer rejection, scrap and warranty claims.
• Communicating to Maintenance Dept. in implementation of Total Productive Maintenance (TPM)
• Always in progress to Maintenance dept. about the monthly downtime analysis reduction
• Communicate to HR dept. in all stages likeRecruitment, Selection, Hiring, Training & Development, Rewards & Recognition and during resignation of employees
• Communication to supply chain dept. to ensure the selection of best supplier.

تعلیم

Bahria University
ماسٹرز, ماسٹرز ان سائنس, MS Project Management‎
Project Management
CGPA 3.3/4
2018
University of the Punjab
بیچلرز, , (B.Sc.) Industrial Engineering & Management‎
Engineering Management, Industrial Manufacturing, Production and Operations Management
CGPA 3.1/4
2012

پیشہ ورانہ مہارتیں

ماہر Capacity Planning
ماہر Demand Supply Planning
ماہر Engineering & Manufacturing
ماہر Inventory Forecasting
ماہر Inventory Optimization
ماہر Inventory Planning Skills
ماہر Kaizen
ماہر Labour Management
ماہر Lean Manufacturing
ماہر LTV Driving Licens
ماہر Operation Management
ماہر Pre Production Planning
ماہر Production Coordination
ماہر Production Management
ماہر Production Planning
متوسط Quick Changeover (SMED)
ماہر Warranty Quality Assurance Process
ماہر Work Study and Methods Engineering

زبانیں

ماہر اردو
متوسط انگریزی

آپ کن کمپنیز کی پیروی کر رہے ہیں

مزید دیکھیے