Develop, evaluate, document, and improve manufacturing methods and processes through Lean techniques and Kaizen Events. Analyze and reengineer production layouts, designing and implementing efficiency and quality improvement projects across production lines. Proficient in Visio, Solid-Works, AutoCAD, Word, Excel, PowerPoint, Outstanding communication, problem-solving, and relationship-management skills.
Key Responsibilities:
Production Industrial Engineers of sewing floor are responsible for the following activities.
• Three days before the style starts in line, layout should be discussed with Change Over and Production Manager and get their signature to implement.
• If any changes in the layout is done, it must be updated and change accordingly with the approval of ME/MI – Head.
• Requesting machines, folders and attachment requirement well in advance based on scheduled production plan
• Conducting Method study and educate to follow the best method to operators
• Conducting capacity study of individuals and fix their target after 3 days from the style starts
• Follow-up study (operators who are all not achieving the Target/Capacity)
• Bundle system follow-up
• Bottle neck operation – identify and eradicate
• Fixing new tailors grade based on their performance and criteria.
• Developing multi-skill operators based on their individual interest and maintaining skill matrix record.
• List out low efficiency operator and monitor to improve their efficiency
• Measuring line lost hours due to various reasons in sewing floor
• Monitoring and Line balancing – Based on Capacity and WIP in the line
• Helping supervisors in line balancing during high operator absenteeism.
• Working for minimization of changeover time
• Preparation operation bulletin of new garment.
• Planning layout of machines in accordance to new garment stitching.
• Removing bottleneck in the process for smooth production
• Calculating SAM, establishing stitching targets, enhancing efficiency of sewing lines.
• Method improvement by keeping in view the best possible ergonomics.
• Implementation of principle of motion economy on operators.
• Designing sewing machine templates for better utilization of machines
• Prepared Process Flow Charts, SOPs, Manufacturing control plan
• Kaizen activity on monthly basis to improve manufacturing process
• Preparing and updating visual management board monthly basis.
• Preparing monthly reports of efficiency, forecast eff.%, changeover, kaizen, downtime.
• Prepared OB for new articles.
Re Engineering Project
NTN Layout
• Change stitching line layout from Traditional to face to face layout (Reduce width of stitching line from 14 ft. to 8 ft.)
• Reduced WIP in the stitching line by 60%.
o 6S Implementation
Conduct 6S Training for new inducted stitching Operator from Factory training school.
Weekly 6S Audit and sharing score to everyone to create lean culture in the company