Proficiency over water supply design softwares on Epa.net and Water GEMS.
Arc.GIS software for mapping purposes and water supply design.
World Bank Funded Project
Project: Punjab Rural Sustainable Water supply and Sanitation services
Collaborate with Engineering Consultants and contractors for project-related tasks under the guidance of the Infrastructure Engineer.
Reviewed the Planning Proposals and provided the valuable inputs for improvement.
Comprehensive review of Feasibility Reports for all villages, utilizing data analysis to provide constructive feedback aimed at enhancing the quality of reports and facilitating more efficient planning processes.
Assist in verifying the work plans of the contractors and monitor the progress of on-going civil works at sites.
Reviewed the Detailed Engineering Designs & Cost Estimates and provided the feedback for correction & improvement. Ensured the quality and quantity of the works/goods at site as per specifications and standards mentioned in the tender document and detail engineering design.
Monitoring of Physical and financial progress of the civil works and ensured the infrastructure team in the Tehsil has the necessary capacity and tools for the successful implementation and monitoring of civil works projects
Bank Funded Project
Project: Punjab Cities Programme (PCP)
The world bank Pakistan CPS FY15-20 alligns with the Punjab Cities Program, aiming to improve the infrastructure for economic growth and poverty reduction. The development
objective of the Program is to strengthen the performance of participating Municipal
Committees (MCs), focusing on urban management and improvement of municipal
services infrastructure for satisfactory service delivery.
Assessment of existing situation analysis of the water supply and sewerage assets.
Monitored the digitization process on Arc GIS of existing infrastructure of water supply and sewerage. Collaborate closely with GIS professionals to integrate hard form maps into Geographical Information System (GIS) based service delivery maps
Monitoring of data collection forms for the survey staff and Graduates engineers.
Evaluated the comprehensive data collected of Kamoke and Muridke for water and sanitation scheme and prepared the situation analysis report.
Prepared Inception Report for major components of water supply system in Kamoke and Muridke.
Prepared a comprehensive Spatial plan considering population growth, environmental factors, and infrastructure needs. Provided recommendations for optimizing existing assets to enhance efficiency and sustainability.
Asian Development Bank Funded Project
Project: Punjab Intermediate Cities Improvement Investment Program (PICIIP) with Consultants for Engineering Design and Construction Management (EDCM).
“PICIIP Government of the Punjab is implementing Punjab Intermediate Cities Improvement Investment Programme (PICIIP) in intermediate districts including Sahiwal, Sialkot, Sargodha, Bahawalpur, Rahim Yar Khan, Multan, DG Khan, Bahawalpur, Rawalpindi and Muzaffargarh with financial assistance of The Asian Development Bank (ADB). PICIIP aims to improve the efficiency and financial sustainability of intermediate cities and effectiveness of urban services through water supply, sanitation, Sewerage system, sewage treatment, solid waste management, transport infrastructure and up gradation of Punjab Local Government Academy Lalamusa and capacity development program.”
Assessment of existing situation analysis of the water supply system of of Muzaffargarh City.
Monitored and evaluated the digitization process on Arc GIS of existing infrastructure of water supply and sewerage. Collaborate closely with GIS professionals to integrate hard form maps into Geographical Information System (GIS) based service delivery maps. Resolved any challenges faced during the process with team.
Establishment of data collection forms and conducted comprehensive data collection of Muzaffargarh city. Verification of boundaries from the Tehsil offices of the Muzaffargarh city.
Engaged with local communities, government officials, and other stakeholders to gather feedback on project impact and address concerns.
Prepared Inception Report for major components of water supply system in Muzaffargarh city.
Situational Analysis report of existing Assets of Muzaffargarh water supply
Prepared a comprehensive Spatial plan considering population growth, environmental factors, and infrastructure needs. Provided recommendations for optimizing existing assets to enhance efficiency and sustainability.
Spatial plan of Water Supply Infrastructure in the proposed project boundary.
Monitored the data collection of project progress and analysis on the progress of activities over time and evaluated the results in terms of timeliness, quality, accuracy in line with project indicators
World Bank Funded Project
Project: Improving access to the water and sanitation services in rural areas of Punjab - 30 selected villages in 08 tehsils / districts.
Monitored and evaluated the progress of the topographic survey in all 30 villages to ensure timely completion and data accuracy.
Preliminary design of selected Technological Options for water and sanitation services with computer aided models (Arc GIS, Water GEMS, Excel, Pivot Tables) for all the sample villages (30 villages) in 8 Districts of Punjab.
Monitored and evaluated the digitization process on Arc GIS of proposed options for water supply and sanitation proposals. Resolved any challenges faced during the process with team.
Monitoring the progress of hydrological studies, Water quality analysis from PCRWR.
Oversee the compilation of the Final Report, ensuring it includes comprehensive information such as cost estimates, sampling results, designs, hydrologic assessment, and feasibility.
Project: Construction of 54mgd Surface Water Treatment Plant near Ravi Syphon.
Client: Water & Sanitation Agency, Lahore (WASA)
Lead the collection of water samples from the BRBD canal for laboratory testing.
Co-ordinated in Development of a detailed design for the 54 MGD surface water treatment plant. Integrate lab results into the design process to ensure treatment effectiveness.
Assisted in Preparation of comprehensive bidding documents for the water treatment plant project.
Design the water distribution network using both pumping and gravity distribution methods.
Collaborate with multidisciplinary teams, including environmental experts, engineers, and project managers. Ensure effective communication between stakeholders to address project requirements.
Preparation of Master Plan - 2040 for Lahore WASA. The said task includes preparation of water supply schemes, ground water modelling, sewerage and drainage for the whole district of Lahore
Energy auditing of existing WASA tube wells, data processing using the Excel and Pivot Tables analysis and report writing.
Zoning of WASA served areas into WASA district management area with isolated delivery networks
Collaborate closely with GIS professionals to integrate spatial data into water and sanitation project management.
Worked in liaison to create maps detailing existing water supply and sanitation infrastructure, identifying gaps and opportunities.
Prepared technical notes, conceptual studies Plans, preliminary and detailed design reports including design calculations, hydraulic statements and hydraulic simulation/ modeling for steady state and extended period analyses.
Conceptual design of Aerated Lagoons, their technical feasibility and cost estimated.
Rezoning of 50 WASA sub divisions in 27 urban zones that are small, feasible and manageable for water supply network and boundary of each zone was marked by using ArcGIS software.
Carried out water supply distribution system network analysis of each zone for existing and proposed network using Epanet. and Water Gems.