خلاصہ

Electrical Engineer with Four Years plus proven experience in Construction and Maintenance industry especially in Electrical, MEP & HVAC Systems and Project Management.

پراجیکٹس

MEP & HVAC Systems installation at 3B+G+14F+2R Building, Albarsha, Duabi
Operations & Management At Nizwa Industrial Estate, Annual Maintenance Contract.
HVAC Systems installation at DEWA's 132/11KV Corniche substation, Dubai, UAE
GSM based Smart Meter using embedded system, FYP in B.Sc. Electrical Engineering.

تجربہ

کمپنی کا لوگو
Project Engineer
WAS Building Cont.
فروری ۲۰۱۸ - موجودہ | Sharjah, United Arab Emirates

- Preparation of Electrical, MEP & HVAC Site Quantification & BOQ with estimation.
- Evaluation, checking & approval of all Electrical, MEP & HVAC shop drawings such as Electrical, Telecommunication, Drainage, water supply & air conditioning system.
- Responsible for all Electrical, MEP & HVAC systems installations and maintenance.
- Managed Building Management System for several Annual Maintenance Contracts.
- Familiarity with calculation, layout & sizing of Electrical, MEP & HVAC projects.
- Managed labours, site materials, site safety works & site data records.

کمپنی کا لوگو
Assistant Manager (Technical & QHSE Consultant)
Flying Cup L.L.C.
اپریل ۲۰۱۸ - ستمبر ۲۰۱۸ | Dubai, United Arab Emirates

- Developed SOP’s and trained staff for operation of Aerobar ride which includes the Mechanical systems, Electrical system including all MEP & HVAC systems.
- Prepared and submitted Hazard analysis & Risk assessment reports for approval to Dubai Municipality.
- Prepared PPM & QHSE checklists for all O&M procedures.

کمپنی کا لوگو
Facilities Engineer
COMO – United Facilities Management Services
اگست ۲۰۱٦ - جنوری ۲۰۱۸ | Muscat, Oman

- Supervised & Managed the entire Operation and Maintenance planning, budgeting, scheduling, execution and controlling Facilities management services of physical assets (plant, equipment and buildings) & prepared BOM and Project Quotations for all the Planned Preventive maintenance and Corrective Maintenance.
- Carried out the Planned Preventive maintenance and Corrective Maintenance of MEP & HVAC Systems, Civil work Soft Services & Sewerage Treatment Plant.
- Implemented HSE legislation on my site as per OHSAS 180012007 & ISO 140012004 standards & quality assurance inspections completed by utilizing computerized maintenance management systems (CMMS) as per ISO 90012008 standards.

کمپنی کا لوگو
Plant Engineer
King Beverages Pvt. Ltd.
جنوری ۲۰۱۵ - جون ۲۰۱٦ | Sialkot, Pakistan

- Carried out O&M of Krones 250ml CAN line & 330ml CAN line, Tetra Prisma Aseptic carton packages line, Filler, Packing, wrapping, Palletizing, Reverse Osmosis water Treatment plant, water Filtration unit, Storage media, Compressors, Generators, Cooling towers and ammonia compressors.
- Carried out PM & CM of Distribution Transformers, LV & HV protections, Generators, UPS, AVR, Stabilizers, Battery banks, Inverters, VFDs, Soft starters, AC & DC Motors, PLCs, sensors etc.
- Carried out Maintenance Improvisation of Line Efficiencies of all production lines, Production planning, Preventive maintenance scheduling & improving its production figures resolving its quality issues and bringing this plant up to KORE & ISO 22000 standards.

کمپنی کا لوگو
Internee Engineer
PTCL
اکتوبر ۲۰۱۴ - دسمبر ۲۰۱۴ | Sialkot, Pakistan

- OFAN concept (MSAG, ONU,OFC), Switching. (EWSD,NGN,ZTE) Access Network, OLT, ONU and access fault management system NMS E-100, SDH & DWDM monitoring system, fault management systems T 2000, OFC, CDMA 2000 Technology & DRS, BTS TOPOLOGY SOFTWARE.
- O&M of MMBB services (DSLAM,CPE BB & IPTV) & Telecom power plant.

کمپنی کا لوگو
Internee Engineer
WAPDA, Mangla Power Station
اگست ۲۰۱۴ - ستمبر ۲۰۱۴ | Mirpur (AJK), Pakistan

- Carried out O&M of Hydel power plant, Dams, Hydraulic turbines & generators.
- Trained in Power transformer & auto transformers, Governors & excitation system, 132/220 KV switchyard earthling & 50/230 V D.C batteries, Auxiliary & emergency supply system, Drainage & dewatering system, Protection relays & Fire protection systems.

کمپنی کا لوگو
Trainee Engineer
KSS Engineering (Pvt.) Ltd
جون ۲۰۱۳ - ستمبر ۲۰۱۳ | Lahore, Pakistan

- Carried out commissioning, O&M & troubleshooting of Huawei Microwave Optix RTN, BTS, DBS, CDMA BTS and IBS, LAN switches, FE media link dismantling & upgradation of NEC, Pasolink, Rectification of VSWR alarms & BSS Alarms clearance.
- Conducted Acceptance Test Protocol, Preliminary Acceptance Test, Installation and testing outdoor antenna & feeder system, Troubleshooting of all issues from installation to cutover & O&M of all power issues of network.

تعلیم

Najma Human Resources & Training Consultancy
سرٹیفیکیشن, Basic First Aid Safety & CPR Training‎
First Aid, CPR
مکمل
2018
Oxford Home Study College
مختصر کورس, ‎
Project Management
مکمل
2017
Maharat Institute
سرٹیفیکیشن, ‎
Fire Warden
مکمل
2017
Safety First Training Intl.
سرٹیفیکیشن, ‎
Osha Compliance
مکمل
2015
Pakistan Engineering Council
سرٹیفیکیشن, ‎
Registered Engineer
مکمل
2015
Mirpur University of Science & Technology (MUST)
بیچلرز, بیچلرز ان سائنس, Electrical Engineering‎
Power Systems, Digital Communications, Engr. Economics & Mgmt.
CGPA 2.8/4
2014

پیشہ ورانہ مہارتیں

ماہر CMMS
ماہر Cooordination Skills
ماہر Csutomer Services
ماہر Etap
ماہر Handling Assignments
ماہر Hmi
ماہر HSE Management Systems
ماہر Integrated Management System
متوسط MATLAB Command
ماہر PLC
متوسط Revit MEP
متوسط SCADA
ماہر Warranty Quality Assurance Process
ماہر رسم الآلات

زبانیں

ماہر اردو
متوسط عربی
ماہر انگریزی