I have work for last couple of years in cement plant erection and termination work along with solar sector.
Aligning a team for the daily complains, making a job card for each complain.monitoring daily maintenance schedule for generator,ltod, feeder pillars etc.changing oils for each generator after 6month or desired working hours.Daily report writing of the whole day.
I was electrical engineer in Paragon electrical which is doing a electrical work in PC hotel Multan. My key responsibility is material receiving along with inspection, show the report and quantity to client.
Power system, firealarm, internet,camera and other building system intallation with respect to shop drawings.Making asbuilt, job done report to client along with my own company, participating in weekly meeting with client.
There's the project kurram tangi dam in waziristan.
I was electrical engineer and looking for a dam earthing system.i do card welding bare copper 95mm"2 cable.
I installed a earthing mesh and do around 37joint, material inspection, joint inspection,earth pit intallation and other task..
Key responsibility are installation of Cable trays thoroughout cement plant.Trays route finding than it's teams management for these tasks.Regular reporting to company and client.Inspection of each on going jobs and material coordination.
Installation of Cable trays in cement Mill tunnel, kiln tunnel, cooler with Water storage etc.
Cable lying in packing plant, preheater crusher areas.lighting installation with automatic control system.motor and junction box termination with inspection.
Work as technical engineer in design PV system(on,off,hybrid,gridtie etc)and supervise projects of Cell technology pv module system and other small pv system.
Main achievement are 23 and 27 kw gridtied with back up system installation.
Job description is manage all services which client want to done every electrical related fault trouble shooting, maintenance and inspection.
Installation of new units throughout the plants.
First of all study flow of cement plant and electrical aquipment.
Overhauling of 3.4 mega watt main mill drive motor,2400kw watt motor vfd drive,motor starter.