Greetings,
MAHROZE KAYANI
+92-300-9883634 ([email protected])
+971-56-6384474
Project: DUBAI TRAM/METRO
Job Roles And Duties:
Ensure that electrical work at site is done as per approved drawings.
Track stray current pits rectification.
Ensured that all installation and lifting, logistics works and operations are being done safely according to project HSE requirement.
Assure Product quality by conducting reliable test.
Transformer fencing in all tram stations.
Worked on as-built drawing.
Worked on snags related to TIS (transport information solution)
Worked as a TIS instruments installation Engineer (CCTV, VBS,HELP POINT, DIGITAL CLOCKS,PSD,PID,PTZ,SPEAKERS,DCS ANTINA,NBR,DANS,TDS,IAS)
PSD maintenance(MSD&EED Alignment, MSD toothed belt measurement and adjustment).
PSD,MSD,EED isolation tests.
MSD opening/closing obstruction rectification and normalization.
HV and LV cable pulling and termination.
HV and LV cable testing.
All LSP wiring and testing.
Coordinating with site team to close consultant snags/client snags/internal snags.
Maintain project safety awareness and enforce company safety policy.
Prepare weekly nonconformance reports and verification of corrective actions.
SERVICES:
Installation,testing and Maintenance of
Addressable and Conventional Fire Alarm System.
Voice Evacuation System.
Central Battery System.
Emergency and Exit Lighting Systems.
Low Current systems.
Fire Fighting.
Fire alarm control panel installation.
Earthling and lightning systems
Job Title :Assistant Electrical Engineer
Project: Pakistan Civil Aviation Authority Islamabad
Services:
Un-interrupted Power Supply
Electric wiring designing and installation
Fuel Farm
Fire Fighting Equipment and Installation
SCADA and PLC Systems
Power Distribution Boards
Piping
Ground Power Unit(GPU)
Bus Bars
Electric Circuits Designing
Distribution
Building Management System (BMS)
Troubleshooting
Testing
Commissioning
Motor Control Centers
HV Switch Gear
Power Factor Improvement
Planning
Load Calculation