I am an experienced Construction Manager and Engineer with proven success spearheading large-scale projects within budget and time constraints, such as land development, infrastructure, and buildings. I am skilled at directing the entire project life-cycle stage including coordination with key stakeholders to achieve project milestones targets. Demonstrated success in managing the development, implementation, and maintenance of effective management information to develop project resources effectively. Possess the ability to build long-term working relationships and motivate construction teams, while maintaining high standards of work. Multilingual with operational command of English, Urdu, Arabic, and Turkish (Basic).
My key skills include Civil Engineering, Construction Project Management, Project/ Cost Controls, Motivational Leadership, Risk Management, Process Improvements, Planning & Scheduling, Excellent Communication, Technical Skills, Critical Thinking, Quality Assurance and Resource Management
Currently I am engaged with Young’s Pvt. Ltd., as a Project Engineer, where I created 2 months look-ahead for material procurement such as steel reinforcement, cement, and admixtures and verified bill for the contractor, suppliers and consultants. Attached is my resume which showcases my progressive experience and successful track record for leading successful initiatives. My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such, I would welcome a discussion regarding opportunities with your organization that fit my background.
- Construction supervision and controlling the civil works construction activities
- Monitoring and controlling the Project Schedule
- Value engineering for the civil works items
-
Deign cost estimates for different viable options of value engineering for current project and assure quality through inspections on site and retaining inspection records through RFI (request for inspection) documents. Create comparatives and rates analysis and construction options for materials, current projects, and building maintenance.
• Functioned in close collaboration with Structural Consultants to formulate time schedules on MS Project for the structure works and deliver drawings and details for construction.
• Efficiently created 2 months look-ahead for material procurement such as steel reinforcement, cement, and admixtures and verified bill for the contractor, suppliers and consultants.
• Steered meetings with suppliers to discuss timely provision of materials related with the project and generate monthly progress report, including materials reconciliation.
KEY PROJECT:
• Korangi Creek Industrial Park Young’s Factory
Formulated schedule to renovate area on MS Project and update the progress in a timely manner. Planned, executed, and supervised civil construction activities on sites and liaised with the MEP team to assure proper location of sleeve penetration of utilities in concrete structure of building. Created forced entry and ballistic resistant protections for ducts and other utilities on exterior face of building and accomplished various tests on plumbing lines of the buildings.
• Played a key role as the Competent Person for Scaffolding, erection and removal, and Fall Protection and steered meetings with the client to initiate any new works.
• Acted as an In Charge for the extensive renovation of running housing building and supervised construction activities as per the Baseline Project Execution Schedule to meet progress and schedule deadline.
• Functioned in close collaboration with Sub-Contractor to administer piling works, including 219 piles in housing building and 17 piles in expansion of MSGR building.
KEY PROJECTS:
• Construction of Housing Building and INOX Building at United State Consulate Karachi
• Expansion of MSGR Building at United State Consulate Karachi
Delivered excellent first rate support to staff in generating weekly working schedule to assure timely implementation of the approved BPES from contractor. Administered all construction activities on bungalows and assessed progress on site through updated work schedules. Examined constructed and habited houses for adherence with the Construction Bye Laws of NHS.
• Created project execution schedules, presentations, and related documents in accordance with provisions of contract by the Project Director to update NHQ regarding the progress of the projects.
• Interacted with Consultants regarding master plan of Phase-IV NHS and verified running bills for infrastructure development and housing projects.
• Generated BOQs’ and tender documents and organized infrastructure development and bungalows construction to undertake inspections, construction, repairs, and maintenance activities in NHS Karsaz.
KEY PROJECT:
• Infrastructure Development Phase-III, PNS Karsaz
Produced engineering estimates and tender documents for maintenance works and retained the pool of contractors through pre-qualification process. Led maintenance works of urgent nature on emergency basis to minimize distribution of routine operations of the school branch.
• Positioned as the Engineer and held the credit for examining and managing the renovations and construction of branches in the P.E.C.H.S and Hyderabad region.
• Coordinated with consultants to undertake major construction works, verify running / final bills, examine quality assurance, and supervise quantity of works during the execution works.
KEY PROJECT:
• Construction & Renovation of Branches in P.E.C.H.S and Hyderabad
Produced shop drawings and as-build drawings, calculated civil structural and architectural quantities for two buildings, and administered finishing activities for the building. Spearheaded construction activities for construction of parking and development of roads and infrastructure in the entire university.
• Headed activities related to construction of roads, such as preparation of subgrade and asphalt base course.
• Developed material testing laboratory for company to provide services for steering Marshall Mix Design, L.A. Abrasion, C.B.R and Proctor, Field Density by Sand Cone Test and Extraction of asphalt by the Centrifuge extractor.
• Efficiently accomplished tests for soil and asphalt used on site in sub-base and base course and devised strategies to assure quality control in the construction of parking.
KEY PROJECT:
• Construction of Najran University