This organization takes the tender from sultanate of Oman including Civil and Electrical.
In our Electrical dept.our company works upto 11 KV & below including 11KV Grid Station.
This company does work on Overhead line and also on Under Ground cables.In which cable laying and maintenance (shutdown) including.
Now AGT has one year maintenance contract from Dhofar Muncipality in Willayt TAQA,Mirbat,Sadah,Dalkot,Rakhyut,Sheelam,Jazar and Halynat Island.
In which all maintenance of OHL and UG cables upto 11KV.
A company errection of grid station and work on OHL 11kv + LV
I performed my responsibilities in maple leaf cement plant as an assistant manager at contract. My all responsibilities in factory storage area where I maintained two limestone crasher (Line 1 & Line 2). These are hammer crashers. The main objective of both crashers are maintained because these derives are slip ring derives and one is 950kw and other 1150kw.So in my supervision we check the carbon bushes at every week and removing the dust from resistors and check the liquid starter. I also responsible for the clay crasher derive which is roller press crasher this derives is rotor starter. Later on during my job period a hammer clay crasher was installed there. Now both are in working condition.
The other responsibilities for me I checked the all conveyor belts derives from crasher to Bins. Also check the bag filters and their SOV.the clay storage yard area in which clay stacker and sackraiper and all their sensors and derives are in my responsibilities. Also same responsibilities for me in stacker and reclamer at line 1 and line2 on limestone piles in which their traveling derives and jib belt sensors and sway switches on conveyor belts and working or not idler rollers and also check the all motor derives in my area on daily basis because my manager strictly order me, there is no stoppage in my area due to derives so I mostly check motors and sensors.
During my job period control cable of stacker line 1 (limestone) removed into wireless communication system. Also I manage two shutdowns at each line, 1 & 2 lime stone and clay , In which main part is change the charasher hammers and check the weigh bridge circuit, see inside the Kiln and its coal Gun and visit the whole plant.
1223 MW RLNG CCPP, Balloki in Habib Rafiq pvt Ltd.
The proper name of this power plant is (Re-gasification Liquefied Natural Gas Based Combined Cycle Power Plant). I am a trainee engineer in this firm and no responsibilities performed only I saw the erection of equipments in which cable laying process, Earthing , Generators Switchyard, fire fighting system, safety , Transformers, Transformer testing,550kv line coupling test etc.