Comprehensive hands-on working experience as an Electrical Engineer (Utility Area 4.5 MW condensate + extraction steam turbine. hp boiler 65 bar 30 tph LOW & MIDUM VLTAG control room ,DGs synchronization and complete troubleshooting in process in Engro Foods Supply Chain Limited. 5 Ton Line Installation Project Battery/hand operated Mugger, Analog /Digital MultiMater, Use of Oil Treatment Machine & Oil Tester, Primary injection set, Secondary injection set, Lux Meter, Micro ohm meter, Temperature Detector, Vibro Meter, Hi pot tester, Milliohm Meter, ELCB Tester, Clamp-on Grounding Resistance Meter, & Laser Tem Gun etc.
Management: Project planning, Scheduling, Design approvals, Quantity Estimation, Cost estimation
To Install ITS System on multan to sukkur motorway
Basic Job Description:
Design, develop, test, or supervise the manufacturing and installation of electrical equipment, components, or systems
Responsibilities
Design
Development
Outreach
Ethics
Electrical Code
Testing and Maintenance of Electrical Equipment
Final Inspection of Electrical Equipment