خلاصہ

Worked as an Executive O.S.P Fiber Optics Engineer (Providing On Site Support to technical teams)
Troubleshooting the Optic Fiber related faults & removal of Pressure points using filed equipment's (OTDR,
Power Meter etc) Minimizing the down time & Restoring the services within the allocated time window
following all the SLA,s
Deployment of Aerial And Duct OFC according to the drawings provided & site inspection for the proper
deployment of OFC duct Pipes on the new routes.
Coordinating with the NOC & NMS Dept. updating them fault details & ensuring Links restoration.
While maintaining all faults related record including the resources utilized updating the Stock inventory
available

پراجیکٹس

Traffic Density Based Light Control System

تجربہ

کمپنی کا لوگو
Executive (OSP Engineer)
WorldCall Telecom Limited
دسمبر ۲۰۱۷ - دسمبر ۲۰۱۸ | Lahore, Pakistan

Worked as a Field Support Engineer
Document activities, such as system problems, corrective actions and completed equipment
installations.
Inspects site to determine physical configuration and deploying of Ariel & Duct Fiber cables.
Provide Support by diagnosing network & device problems & implementing technical or procedural
solutions.
Implement or perform maintenance of ODF,s ,Backups & recovery procedures.
Document procedures for hardware and software installation & use.
Worked with team to install, remove or relocate user connectivity equipment and devices.
Splice fibers using Arc splicing machines such as 50S & 60S (Fujikura).
Installation & repairing of Network Fiber Optic cables.
Identifying the cause of network problems, troubleshooting using the diagnostic test software and
equipment's. (OTDR JDSU 6000)
Create or update technical documentation for network installations or change to existing
installations.
Managing the Telenor LOS Alarms Btw Telenor towers in a metro network.
Escalating the Fiber cut issues to the team Providing the technical support to the onsite team,
locating the Fiber cut, Updating the N.O.C Regarding Fiber cut & supervising the team in restoring
the Links within the allocated E.T.T.R.

کمپنی کا لوگو
Site Engineer (Intern)
ZTE Zong Pvt. Lmtd. Pakistan
جولائی ۲۰۱۷ - اکتوبر ۲۰۱۷ | Multan, Pakistan

Worked Under the Super vision of Site Engineer's
Assisting them in Providing the technical support to the field teams to execute network Hard ware & Soft ware changes.
Assists in Providing technical support for Diagnostics & Troubleshooting of ZTE BSS.
Providing assistance in supervision of the installation team as per BSS (ZTE SDR & Rectifier)
equipment Istallation.
Providing necessary help to the Engineer's in Commissioning, Integration & Alarm testing of the
installed ZTE BTS SDR 8700 (RRU based) & SDR 8900.Configuration of Rectifier & Rectifier alarms.
Assists the Site engineer in Commissioning & Troubleshooting of ZTE BBU According to MO DATA
provided.
Supervised the Commissioning,Testing & Troubleshooting of Post Alarm patching of ZTE SDR &
Rectifier.
Assists in the Installation & Commissioning of Fuel Sensor,Temperature Sensors & upload different
files with LMT Software.

کمپنی کا لوگو
Intern
Pakistan Telecommunication Company Limited (PTCL)
اگست ۲۰۱۵ - ستمبر ۲۰۱۵ | Bahawalpur, Pakistan

تعلیم

Islamia University
بیچلرز, , BSc Electrical (Telecommunication) Engineering‎
Satellite Communications, Mobile Communications, Computer Networks and Communication
CGPA 3.8/4
2017
Sadiq Public School
انٹرمیڈیٹ / اے لیول, فیکلٹی آف سائنس (پری انجینئرنگ), Fsc Pre-Engineering‎
Physics, Chemistry, Mathematics
فی صد 75%
2008
Sadiq Public School
میٹرک / او لیول, او لیول, O-Levels‎
Physics, Chemistry, Mathematics
فی صد 70%
2006

پیشہ ورانہ مہارتیں

ابتدائی CrypTool
ابتدائی Handling Assignments
ابتدائی MATLAB Command
متوسط Microsoft Visio
ابتدائی Packet Tracer

زبانیں

ماہر اردو
ماہر انگریزی