On Field Surveys
System Designing w.r.t requirements
Technical design simulations
Compilation of BOS for system installation
Survey Planning
Field Survey Execution
Technical Report Designing
Finalization of Project Execution Plan
System Transportation
Complete System Installation Â
System Handover
I was a member of team for protection of feeders and systems to maintain continuous supply of electricity by:
* Monitoring substation on daily basis.
* Isolating heavy voltage loads for maintenance.
* Testing of Transformer, Relays and connections.
* Detail Testing of Grid equipments.
* Recording current readings on daily basis of critical load.