Growth is the intrinsic passion for me that drives my working perception and leadership spirit. I am habituated to fast-paced environments with full of challenges and possess the strong interpersonal abilities to manage multi-disciplinary projects.
Perform detailed calculations of generators to develop installation, testing & commissioning standards and specifications.
Reviewed inventories, tracked production statuses and ordered materials to foster consistent availability and production schedule adherence.
Developed production schedules according to deadlines for existing orders and sales forecasting.
Supervised entire production process of generators and prepared proper documentation for dispatch.
Supervised production of Automatic Transfer Switch (ATS) Panels.
Created engineering documentation, including manufacturing processes, equipment specifications and change notices.
Analyzed product and process and provided actionable solutions including changes to processes, products or quality standards where warranted.
Identified risk mitigation actions to reduce injuries, accidents and hazards in production environment.
Directed 10-person production team to introduce efficient methods of production.
Completed and submitted monthly and yearly project reports to support executive decision making.
Worked with engineering, production and testing departments to implement corrective actions for missed milestones.
Liaised with company executives and project managers to acquire resources to move projects forward.
Determined and scheduled priorities as required to progress engineering work.
Prepared and reviewed scopes of work, schedules of payments and other documents.
Conducted project site visits to meet with construction staff, evaluate progress and discuss operational issues.
Established and implemented construction schedules, methods and labor requirements, using Gantt charts and MS Project.
Resolved project operational problems to minimize delays and unexpected cost increases.
Conducted Fault monitoring in fiber optics using software.
Managed the fault and alarm handling in the system.
Responsible for providing best possible solution to encounter the fault by finding distance/cut in laid network.
Managed laid network of fiber optics which connected to different regions.
Accountable for forwarding the fault reports to the field operators for rectification of fault.
Worked with product planners and industrial designers to conceptualize and refine product concepts.
Performed analysis on ROBOCHEF's technical designs and prototypes in development stage.
Prepared the design of the electrical layouts of all the panel components.
Worked on the interface of the stepper motors with the mach3 interfacing board.
Supported the wiring and installation of all the components in the panel of ROBOCHEF (Automatic Jalebi Making Machine).