概要

Experienced Industrial Engineer with a demonstrated history of working in the Martial Arts Garments & Boxing Gloves Manufacturing Industry. Skilled in SAM Calculation, Productivity Improvement, Efficiency enhancement, Time & Motion Study, Manufacturing Operations, Industrial Engineering, Quality Management, Capacity Planning, Layout Designing, Line Balancing and Lean Manufacturing.

项目

Continuous Improvement (Kaizen)
Design of An Energy Audit System for a Cable Manufacturing Industry in KP

工作经历

公司标识
Material Planner SCM
MOL pakistan Oil and Gas Co. B.V.
Feb 2022 - 代表 | Karak, Pakistan

Enter Description

公司标识
Production Supervisor
VIVO ELECTRIC COMPANY (PVT) LTD
Jan 2021 - Feb 2022 | Faisalabad, Pakistan

Supervisor of Continuous Improvement (CI) department to ensure manufacturing excellence during production and removal of waste
1. Implementation and Supervision of 6S Field Management at Production Workshop
2. Conducting Static Test and ESD Audits for ESD/EOS equipments and Materials to ensure high quality of Products
3. Conducting Battery Audits prior to quality Audits to ensure safe handling of mobile Batteries before and after installation
4. Conducting Process audit, inside the Production to ensure High Product Quality and minimise the errors
5. Training of newly hired Operators according to WI and achieve learning curve within schedule days
6. Supervision and conducting Logistics Audits to ensure no material damage and waste.
7. Gathering and organising statistics from MES systems to visual company daily growth
8. Efficiency and Productivity improvement by applying Lean Manufacturing Techniques through Lean Production.

公司标识
Industrial Engineer
Penna Overseas Corporation
Oct 2019 - Jan 2021 | Sialkot, Pakistan

Overseeing Production of Garments from Cut to Pack, as Assistant Production and Quality Executive. Also, responsible for Implementation of Lean Manufacturing and 6 Sigma tools as an Industrial Engineer in an Enterprise.
1. Calculate S.A.M of Specific Operations
2. Checking daily NON-Productive Time (NPT) and Reduce machine breakdown time
3. Review Production Schedules, Engineering Specifications and Process flows to understand methods and activities in Production
4. Time & Motion Study for Line balancing according to target and capacity study
5. Layout making for all different articles on Production floor
6. Implementation of Quick Changeover concept during layout change
7. Issues solving on the floor regarding Production with Supervisors and Hall Incharges on the basis of Daily schedule meetings
8. Training of Newly Hired female workers, to Place them as Skill workers in Production line
9. Ensuring Visual Management on hourly basis for the Production Lines
10. KPI's entry into the System to do Pareto Analysis for Production and Quality to lower Cost.
11. Make SOPs and Check sheets for Incoming, Inline, End line & Final control for Quality Control to reduce DHU
12. Finding Bottleneck Operations
13. Operations motion development by correcting faulty motion
14. Checking 5S checklist and daily WIP in Production Lines
15. Improving the Quality Management system to fulfill the Customer Quality Grid
16. Implementation of Lean manufacturing (Kaizen, TPM, OEE, Andon, Bottleneck Analysis, Continuous Flow, Gemba,Muda, PDCA, Poka-Yoke, Takt Time) to enhance Productivity
17. Obeya Room Working in form of Graphs, Charts and Analysis
18. Weekly training of Supervisors and Workers regarding their alter pieces on basis of Defects per hundred units (DHU) report.
19. Calculation of Rate of specific operations on basis of Time Study
20. Cost Analysis (in term of Payback Period, Breakeven, Worker Incentive System, Cost Per Minute) to Optimize method of Business Organization

公司标识
Internee
A.G.E. Industries (Pvt) Ltd.
Aug 2019 - Oct 2019 | Peshawar, Pakistan

1. Time and Motion Study of different Operations
2. WIP control and Implementing FIFO technique
3. Calculation of Labour Efficiency by applying Work Study Techniques
4. Daily Checkup of Production Lines and Work Stations

公司标识
Internee
DWP Group
Jul 2018 - Sep 2018 | Lahore, Pakistan

1. Time Study and Motion Study
2. Cellular Manufacturing (reducing cycle time and material handling)
3. Productivity and Efficiency enhancement through Lean Manufacturing tools

学历

NWFP University of Engineering & Technology
学士, 理工学士, ‎
Industrial and Management
CGPA 3.0/4
2019
Edwardes College Pesahwar
中级/A级, , ‎
PRE ENGINEERING
所占比重 83%
2014
Forward Model School B.I.S.E
大学入学/0级, , ‎
Science
所占比重 84%
2012

技能

中级 5S
初学者 Agile Project Management
熟练 Analytical Approach
中级 breakeven analysis
熟练 C Problem Solving
中级 Capacity Planning
中级 Cost Analysis
中级 Cost Reduction Strategies
中级 Customer Service Solutions
中级 Internet Research Skill
中级 Interpersonal Leadership
中级 Interpersonal Skill
熟练 Interpersonal Skills
中级 Layout Marking
中级 Leadership and Time Management
中级 Lean Manufacturing
中级 Line Balancing
中级 Majoon Making
熟练 Men, Machine, Material, Method And Money Study
中级 Motion Analysis
初学者 Obeya Room Working
中级 Operational Efficiency
初学者 Overall Equipment Efficiency Tools
中级 Payback Analysis
熟练 Proactive
中级 Problem Solving and Decision Making
熟练 Production Process Knowledge
中级 Productivity Improvement
中级 SAM Calculation
中级 Time Study
中级 Training and Development
中级 Visual Factory
中级 WIP Reduction
熟练 المهارات الهاتفية
中级 رسم الآلات

语言

熟练 乌尔都语
熟练 英语