概要

Im Civil Engineer

项目

Eiffel civil EM pvt ltd
ASF CITY M-9 Karachi

工作经历

公司标识
PROJECT MANAGER
Kohistan Builders and Developer's
May 2023 - 代表 | Wah Cantt, Pakistan

Led a team of professionals in executing project.Developing a Project Kohistan Greens at Wah Cant Gt Road 1800 Kanal Area A Project Of Kohistan Builders and Developer's Underground Ht /Lt Duct Lines, Water supply, O. Head Water Tank Sewerage, Spt, drainage system & Infrastructure Work With all respects.

公司标识
Project manager
MS SARCO pvt ltd
Jun 2021 - May 2023 | Multan, Pakistan

Infrastructure Development Works of DHA Multan Sector H. Project Consist of Construction of Grand Mosque, Overhead & Underground Water Tanks, Water Supply and Sewerage lines, Strom Water Drains, asphaltic roads Box Culverts, Footpaths, Cunetteand & Earth work subgrade, Improved Subgrade, Subbase, Base etc.

公司标识
Project Manager
M/S Task Construction & Consultancy Services Pvt Ltd
Oct 2018 - May 2021 | Karachi, Pakistan

Development of ASF City M-9 Karachi.Major components of the Project include Construction of Main Boulevard Commercial Block Storm Water Drains, RCC Culverts, RCC & Brick Masonry Retaining Walls etc.Construction Of (Thermal Power Station Jamshoro 2660MW) & Sewage treatment Plants.
Project Including Office Buildings, Administration Block 3 Stories For Main Power House Residential Blocks (150 Houses) 3 Nos Of Septic Tanks ( Capacity 174000 Gallons Each ) Equipment Rooms, Operating Buildings, RCC Sewer Lines, water Supply, Boundary Walls.

公司标识
Site Inspector/ARE
EA Consulting Pvt Ltd
Jul 2017 - Sep 2018 | Multan, Pakistan

Construction Of CPEC (Peshawar Karachi Motorway PKM Sec07/60KM) Project Including 15 Underpasses¸ 13 Bridges, 14 Subways , Road Culverts, Cattle Creeps. Major works include Cast in Situ Piles dia (1.2m), Precast & Pre stressed Girders, Storm Water Drains, RCC Box Culvert, pipe Culverts, Cattle Creeps, RCC Retaining Walls, Protective Walls, Asphaltic Base Course & Asphaltic Wearing Course  ,Toll Plaza And Service Area Rest Area Buildings etc.

公司标识
Construction Manager
Al-Noor Builders FWO-RMB-142
Jan 2016 - Jul 2017 | Lahore, Pakistan


Construction of Ring Road SL-02 Including 04 Underpasses¸08 Bridges, Subways, Road Culverts. Major works include Cast in Situ Piles dia (1.2m), Precast & Pre stressed Girders, Storm Water Drains, RCC Box Culvert, RCC Retaining Walls, Water Bound Macadam, Asphaltic Base Course & Asphaltic Wearing Course etc.

公司标识
Construction Manager
Maaksons pvt ltd
Sep 2014 - Dec 2015 | Lahore, Pakistan


i: Construction, Widening & Improvement of Sharqpur Road & Main Shaikhupura Road Including 02 Underpasses. Major components of the Project include Cast in Situ Piles dia (0.75m), Pile Caps, Precast & Pre stressed Girders, Storm Water Drains, RCC Box Culvert, RCC Retaining Walls, Water Bound Macadam, Asphaltic Base Course & Asphaltic Wearing Course etc.
II: Construction Of Defence Community Club (DCC) , Finishing of Defence Raya and Golf Community Club (DRGCC) Phase# (5,6,9) Lahore .Including 4 Residential Blocks, SOG, Brick Masonry, RCC Columns, International Standard Squash Hall ,Tanis Hall, Basement, Generator Room, Rcc Ramps, Car ParkingÂ’s, MenÂ’s/Ladies Swimming Pools, Restaurants, Storm Water Drains, RCC Retaining Walls.

公司标识
Site Engineer infrastructure ECHS
Engineering Cooperative Housing Society
Dec 2013 - Sep 2014 | Islamabad, Pakistan

Development of Engineering Cooperative Housing Society Islamabad. Major components of the Project include Construction of Primary School, Jamia Mosque, Storm Water Drains, RCC Culverts, RCC & Brick Masonry Retaining Walls etc.

公司标识
Site Inspector QA/QC
EA Consulting Pvt Ltd
Jan 2012 - Nov 2013 | Rawalpindi, Pakistan

Construction of Flyovers at Chandni Chowk & 6th Road Junctions along Murree Road, Rawalpindi. Length of Chandni Chowk Flyover was 403m and that of Sixth Road Flyover was 248m. Major components of the Project include Cast in Situ Piles dia (1.2m), Pile Caps, Precast & Pre stressed Girders, Storm Water Drains, RCC Box Culvert, RCC Retaining Walls, Water Bound Macadam, Asphaltic Base Course & Asphaltic Wearing Course etc.

公司标识
Site Supervisor
AL-Khalil Construction Company
Jul 2010 - Dec 2011 | Islamabad, Pakistan

Infrastructure Development Works of Naval Officer’s Housing Colony, Zone-5,Islamabad. Project Consist of Construction of Grand Mosque, Overhead & Underground Water Tanks, Water Supply and Sewerage lines, Strom Water Drains, Box Culverts, Footpaths, Cunetteand Roads etc.

学历

Preston University
证书, ‎
B.Tech Civil
Incomplete
2012
gct bwp
大专, DAE civil‎
Completed
2010

技能

熟练 Civil Affairs Handling
中级 Civil Design Knowledge
中级 Civil Drafting
中级 Civil Planing
熟练 Civil Procedures
初学者 Civil Supervision
熟练 Civil Supervision Skills
熟练 Configuration Switches
熟练 Construction Engineering
熟练 Construction Management
熟练 Construction Site Management
熟练 Cost controller
熟练 End to End Sales
熟练 End To End Project Management
熟练 Managerial Skills
熟练 Managing Constructions
熟练 Persuasion Customer
熟练 Prepare Construction Documentation
熟练 Project Administration
熟练 Project Plans Management
熟练 Site Inspection
熟练 Strong Organizing Planning Skills
熟练 Technical Skills

语言

中级 英语

Usman 联系人

Muhammad Basit
Design tech consultants
Sarfaraz Channa Ahmed
PEA Consultant