概要

Qualified Electrical Engineer (PAK) with over 8+ years of Construction Field Engineering Experience.


Experience of work Companies link MEP Solutions (Lahore), ARTECH Design Engineering, and Cozmuler Engineering (PVT).


Extensive experience in Project Management and Site monitoring, Evaluation, Reporting, Supervising, Installation, Testing and Commissioning.


Work with High Profile Clients such as PEL, Honda, CAA Pakistan, etc.

项目

Mall of Gulberg Islamabad
islamabad international airport
EMPORIUM MALL LAHORE

工作经历

公司标识
MEP Manager
ARTEC Design
Aug 2020 - 代表 | Islamabad, Pakistan

Ø  Run the project parallel with planned work and execution work.
Ø  Supervision of the whole site and managing a team of supervisors.
Ø  Maintained all safety and quality control project standards.
Ø  Monitoring of work quality standards as per requirement.
Ø  Evaluated and resolved all project technical problems.
Ø  General oversight of construction inspection and testing requests for electrical works.
Ø  Execution of electrical work.

公司标识
Project Manager Electrical
Cozmuler Engineering
Mar 2022 - Oct 2023 | Islamabad, Pakistan

 Being Part of the Above Originations, my key Responsibilities include the following.
Performed execution and Planning of all Electrical work according to design, within time limits.
Working on Drawing (Tender, IFC, Shop) in AutoCAD, Supervision of the whole site, and managing a team of supervisors.
 Maintained all safety and quality control project standards, Monitoring of work quality standards as per requirement.
Testing and Commissioning of LV system, ELV system, HVAC system, with quality control project standards.
 Monitor Project Progress and Set Deadlines, Solve Issues That Arise, Managing the Project Cost.
Installation of Fire alarm system, Public Address System, IT, and security System, BMS System, Parking Management System, and lighting protection System.
Installation of HVAC system, Fire Fighting System, etc.
 Commissioning of FCU, AHU, and Water Pumps, using Equipment like balo meter, Noise level meter, temperature meter, etc. and Air balancing of FCUs, AHUs, and Exhaust Fans       

公司标识
Electrcial Engineer
MEP SOLUTION
Sep 2017 - Mar 2020 | Lahore, Pakistan

Ø  Monitoring of work quality standards as per requirement.
Ø  Evaluated and resolved all project technical problems.
Ø  General oversight of construction inspection and testing requests for electrical works.
Ø  Execution of electrical work.
Ø  Installation of Gen set (2000 & 750 KVA).
Ø  Installation & Termination of 11 KVA consumer Panel,SMDB’s & DB’s.
Ø  Commissioning of LV system.
Ø  CBU system installation and its commissioning.
Ø  Installation of Fire alarm system.
Ø  Installation of Public Address System.
Ø  Installation of IT & Security System.
Ø  Installation of BMS System.
Ø  Installation of Parking Management System.
Ø  Laying of Electrical & Power cables.
Ø  Installation of Lighting Fixtures.
Ø  Installation of Cable Tray.
Ø  Installation of Bus Bar Riser,
Ø  Installation of Lightning Protection System.
Ø  Earthling System.
Ø  Installation of Vertical Transport System.

公司标识
HVAC SITE ENGINEER
CLIMATE CONTROL ENGINEERING
Jan 2016 - Feb 2017 | Lahore, Pakistan

Installation and commissioning and Maintenance of following system/ equipment’s.
•Heating systems
•Air conditioning system
•Ventilation system
•Ducting installation system
•Installation of copper piping
•Fire fighting systems
•AHU units installation

公司标识
Site Engineer
CNS Engineering
May 2014 - Dec 2015 | Lahore, Pakistan

Project of IBAS AND ICT

公司标识
Electrical Engineer
Climate Control
Jan 2014 - Mar 2015 | Lahore, Pakistan

Repair, maintain and provide technical attention to all electrical and mechanical refrigeration systems of the Hotel – freezer, fridges, ice makers, fan coil units,

Completes plumbing repairs on leaks or breaks


 
To design the HVAC system as per the requirements mentioned in the proposal through various stages like designing, fabricating, and testing


 
To apply the technical expertise and knowledge that will support the designing, manufacturing, testing, and troubleshooting and help in better delivery of the HVAC system


 
To make an active contribution in the research and development efforts by understanding the HVAC advances that will match with the emerging technologies

公司标识
Electrical Engineer
Aug 2012 - Jan 2013 | Karachi, Pakistan

学历

Riphah International University
学士, , Electrical Engineering‎
Electrical Communication, power Systems, power Electronics
CGPA 2.52/4
2010

技能

熟练 Analytical Skills: Researcher, Analyze
熟练 Comm. Skills: Presented, Negotiated.
熟练 Communication Skills: Facilitated.
熟练 Flexibility: Tailored, Adapted.
熟练 Flexibility: Improvised, Accommodated.
熟练 Leadership: Mentored, Delegated, Led, Ma
熟练 Performs electrical installation.
熟练 Time Management: Prioritized, Delegated.

语言

熟练 旁遮普语
熟练 乌尔都语
中级 英语

Zeeshan 联系人

Vilayat Ali
Utopia Industries
Zain Ali
Descon Engineering Limited