10 YEAR EXPERIENCE OF ELECTRICAL PROJECT FIELD,
MY CARRIER WAS started ON 2000 TO UP TILL NOW,
electrical field works & project experienced persons.
GRID STATION OPRATION,66KVA/120KVA,
SAFTY PENALS.
POWER TRANSFORMER INSTALLATION (PELL).
INSULLATORS FITTING,
BUS-BAR HIGH TRANSMISSION LINES WORK,
1#LYING OF LT/HT CABLES.
2#INSTALLATIONS OF DBS.
3#INSTALLATION OF POLES 8M,12M.
4#EARTHING ALL PENALS.
5#INSTALLATION OF STREET LIGHT PENAL.
6#INSTALLATION OF TRANSFORMERS,200KVA,400KVA,630KVA,1360KVA,
7#MAINTENCE ELECTRICAL WORKS,
8#HT CABLE JOINT/LT CABLE JOINTS
9#TERMINATION OF HT/LT CABLES IN PENALS.
10#DISTRUBUTION HT/LT.
11#INSTALLATION OF R.M.U.
12#TO CONTROL ALL SITE WORKS & DACOMENTAION.
1# FIRE ALAM SYSTEM.
2#CCTV CAMMRAS.
3# ELECTRICAL CONTROL PENALS 3 PHASE.
4# TO CHECK SAFTY SYETEM,
5#INSTALLATIONS ALL ELECTRICAL FANS/TUBLIGHTS/MOTORS.
1#GENRATOR ALL CHECK OPRATION.
2#ATS PENAL REMOVING FAULTS.
3#BTS ROOMS OVER ALL CHECKS.
4#AC CHELLARS OPRATORS.
5#DAILLY NOTE VOLTAGES/AMP/KVA/FREQUENCY/RMU.
6#NETWORK DATTA CABLES LOOP TO LOOP CHACKING,
7#WORK ON METROLLA CABNET/UPS/GENSET/BTS ROOM.
8#TOWER PEPATION DISCK CONNECTING.
1# POWER GENRATION AT MILL.
2# HT/LT CABLE FAULTS DETECT BY I TOP MEACHINE.
3# LT penals check and maintenance.
4# EARTH TESTER/MAGGER/HT TESTER FOR SAFTY.
5# ALL LIGHTS AND TRANSFORMERS INSTALLATIONS.
1# TO CNG COMPRESSOR DAILLY NOTE READING.
2# TO CHECK DAILLY COMRESSOR GAS PRESSURE.
3# TO CHECK ELECTRICAL LOADS IN WATT/KVA.
4# TO CHECK ALL OVER THE SERVICE STATION CLEANING.
5# TO CONTROL GAS LEAKAGES.
6# TO CHECK & maintenance ELECTRICAL PENALS.
1# TO CHECK ELECTRICAL CONTROL PENALS.
2# TO BREAF BE FORE START WORK.
3# TO HENDLE PROJECTS MATTERS.
4# TO DACOMENTS PREPARE SAVE.
5# TO SUBMITTED DAILLY REPORT OF ELECTRICAL PROGRESS.