15 years Experienced "Civil Engineer" with a demonstrated history of working in the "Construction" industry. Skilled in Quantity Surveying, Estimation Engineering, Construction Management , Contract Management, & Microsoft Excel. Strong in project management professional with a PMP training Certificate & Contract Management from University of Southampton (UK) & World Commerce and Contracting Institute. Basic Education is D.A.E & B.Tech HONS in Civil Engineering from GOVT COLLEGE OF TECHNOLOGY (Sahiwal) PAKISTAN..
divpEnter Description/p/div
divp(A) Construction of New Office Building G+1 For Admin and Procurement Structure and Finishing works. Cost 88.00 Millions. Flooring ,Dry wall Partitions ,Aluminum ,HVAC, Glass ,Paint, Double Glazed Curtain wall, and MS (Façade) Works./p
p(B) Upgradation of Drainage system (Process, Sewerage, and Storm waters) Underground lines and Install new pumping stations. Cost is about (9.40 Million)/p
p(C) Construction of Under ground water Tank (Fire fighting services) Cost is (25.00Million)/p
p(D) Construction and finishing New Block of Liquid Dispensing Cost 32.00 Million./p
p(E) Renovation of Plant (Flooring (Epoxy and Vinyl) Dry wall partitions cost is 145.00 Million./p/div
(A) Construction of OPD Block B & C at Pakistan Navy Hospital (PNS SHIFA) Karachi Structure ,Finishing ,HVAC, Electrical services, Medical Gases Installations works B+G+5. Cost of Project 1723.98 Million and Covered area is about 380,158.00 Sqft.
(B) Construction and finishing of 64 Farmhouses of 3000.00,2500,2000 sq. yards at DHA City Karachi (Structure finishing and external Development includes Swimming poll lawn area etc)
As project manager multistory resident DType G+8. Pakistan airforce headquarters E 9. (Confidentional)
Boq's, IPCs and checking of billing against work Don.
Construction of school.
COnstruction of OHWT.
Development of raods .
Construction of Musjid.
Civil structrual works in Parks.
(A) Hospital,(Finishing Works Flooring ,Wall finishes Operation theaters Installation of Equipment's ,MEP, HVAC,VRF System B+G+4 with Admin Block (Structure and Finishing works) BAHRIA TOWN KARACHI.
(B) Finishing and External Development of Roots School (Flooring HVAC ,S.S Wood work, and MS Works.
(C) Finishing of 250 Housing units of 6 Marla (Flooring ,Wall Finishes ,MEP Works).
(D) Finishing of 150 Housing Units of 8 Marla (Flooring ,Wall Finishes and MEP Works)
JOB Description Prepare Rate analysis ,Costing of Civil Construction Items. Hiring of Sub Contractors . Pre Costing of Projects. Write legal Contracts of Sub Contractors with Budgeting.
Sub engineer civil in structure department