*Track record exceeding goals, earning high stakeholder/client satisfaction rating. *Knowledge of resource utilization and control.
*Good operational planning and time management skills. *Manage the projects simultaneously without compromising on standards and quality.
*Ability to ensure standards and specifications are met.
*Ability to work with colleagues to deliver project and operational performance.
*Sound knowledge of construction practices and standards.
*Deep involvement in addressing Construction methodology, Method Statements,Project Quality Plan, Safety Plan, Schedules and Compliance with Project objectives.
*Organize, direct and efficiently use all resources, including subcontractors and suppliers, delivering the highest standard of workmanship and value for money.
I am overseeing the overall Construction Technically matters for different projects in Bahria Town and DHA Rawalpindi Islamabad.
Directly responsible for the construction of Safari View Heights Project located in Bahria Town Phase-I Project Consist 95 Apartment and 56 Shops at LG GF 8th Floor Residential Apartments Covered Area is 111761sft.
and Jamia Masjid Muhammad Project Phase-V Bahria Town Rawalpindi Islamabad
Work as a Site Manager for CCR Building, Substation Building for Engro Polymer PVC Plant Qasim Port Karachi.
Coordinate with Chinese Client for the commercial and construction issues.
Manage overall Construction work for the Pioneer Cement Plant 7600TPD like following main Structure.
Preheater , Kiln,Clinker Cooler,Lime Stone Crusher,Cement Silos,CCR Main Building,Ware House, Workshop Building.
Construction of LPG new Train-2 and Amine Unit complete the civil work Compressor Foundation,Vessel Skid,Pipe Rack,Pipe Slipper,Pipe Line,Cable Trench,Duct Bank,Pipe Culvert.
Manage the civil work for Le-Meridien 5-Star Hotel 14th story and Work on Bio Medical Research Center a project of KACST King Abdul Aziz City for the Science and Technology.
Foundation,RCC Slab,Shear Wall,Circular Column,Stair,Positioning,Retaining Wall.Excavation and Back filling.
Work as a In charge of Area B-200 Burzan Chemical Refinery Manage the the following structure work.
Pipe Rack Double Decker, Tanks and Dike Wall,U/G Pits,RCC Frame Structure,Under Ground Pipe Line,Cable Trenches.
construction of Riyadh Power Plant 11 (PP11). The power plant will add another 1,200MW to SEC\\\'s already impressive complex of plants.Supervise the TR Compound and Infrastructure all over the project Fire Wall,RCC Under Ground Tanks,Pipe Culvert,Road X-ING,Cable Trench,Pr-casting of Manhole,Trench Cover all over the Project.
ENGRO Fertilizers Ltd built a new fertilizer plant here which is the world's largest ammonia/urea plant. built a prill tower about 125 meters high.
In charge all the U/G Pipe Line,Cable Trenches,Pipe Support, and Area completion hand over to Mechanical team.
Construction of Giga Mall in DHA-2 Islamabad Piling work , Raft 2300mm thickness each pour 200m3,Using high strength concrete 10000psi for column use the Plastic Formwork system ,Used dry curing meathead mass concrete provide the pouring strip between the two towers raft control the concrete thermal expansion.
Work at Jubail Petrochemical Refinery,KRT Project,Gulf Frabi Chemical Refinery, Sharq 3rd Expansion.
Supervise the Structure work for Substation,Vessel Foundation,Pipe Slipper,Pipe Rack,Cooling Water Supply Pipe Line and Fire water Pipe Line.
Work as a Lead Surveyor for the following projects.
#1-Parco Mid Country Oil Refinery Project Qasba Gujrat Multan.
#2-M1 Peshawar to Rawalpindi Motor way Section -II.
#3-Gasco Ruwais New Train-II Project UAE.
Work on Cooling Tower Structure,Main Substation, Product Storage Building Survey and Supervising all the Construction Activities.
I was working as a in charge of Survey work for the construction of Basima ~ Surab Single Carriageway 114Km Provencial high Way Project Balochistan.
Survey Control Point Fixing, Center Line Marking Taking the X-Section With Total Station including 20,Km Hilly area.
Curve Layout, Superelevation Fixing,Box Culvert Layout, Causeway Layout etc
Inspection of the survey and structure work for the Lucky Cement Plant Pezu 2000TPD Line A&B.
Work for the LBOD Stage-1 Central Sanghar Draining System.
Carry out The Bridge Survey Piling, Drain Earth Work, Watercourse Layout, drain remodeling etc.