Currently I am working in Bagasse Fired Power plant( 100 MW)at AL-Moiz Group as a Manager Power Plant.


I have more than 12 years of working experience in power generation organizations. I have the experience and knowledge in gas turbines, steam turbines, HRSG boilers, 132/220 KV AIS & GIS switch yards, pumps, compressors, chillers etc. I have worked in different PTW systems.

项目

Almoiz Group of Industries
Saudi Aramco Cogen IPP Power Plant

工作经历

公司标识
Operation Engineer
Saudi Aramco Cogen IPP Power Plant
Jan 2016 - 代表 | Abqaiq, Saudi Arabia

SAUDI ARAMCO CO-GEN POWER PLANT 920 MW
Organization Location: Saudi Aramco, Abqaiq city near Dammam, KSA
ASHOMCo (Ash Sharqiyah Operations and Maintenance Company) manages the three Greenfield development, Power Plants inside the Saudi Aramco Abqaiq (ABQ), Hawiyah (HGP) and Ras Tanura (RTR) facilities, within the Eastern Province and will provide them with Electrical energy and Steam for their process. Each of the power plants are configured for two GE Gas Turbines & Generators, two single pressure HRSGs with supplementary firing, a 230 KV, HV Switchyard and necessary Auxiliary equipment.

The plants are owned by the Power Cogeneration Plant Company (PCPC), based in Al Khobar in which Saudi Aramco has 50% equity, Marubeni has 25%, JGC has 15% and the Al Jomiah Company has 10%.

Aramco have Gas Turbine which kept in running at Natural Gas. The Saudi Aramco Abqaiq Complex comprises of 2 x 190 MW gas turbine, The GE gas turbine (7FA) is a single shaft, single casing heavy duty gas turbine driving a Hydrogen –cooled generator and auxiliary equipment. Complex comprises of High pressure heat recovery Steam generator boiler (HRSG)

Following are the highlights of my working
 Communication with PCC (Power control center) Dhahran and host Plant.
 Attend the daily Production meetings & also other meetings.
 Issue the work permit & related safety documents for isolation, LV & HV Authorized.
 Prepare the plant availability and demand with coordination of PCC Dhahran.
 Take over charge of the plant from his counterpart of outgoing shift.
 Supervise the plant during shift hours for safe, efficient and smooth operation of Plant.
 Identify abnormal parameters, predict potential faults and report / propose the remedial action.
 Communicate with maintenance and other sections.
 Participate in fault investigation and propose remedial measures.
 Assist Manager in implementation of Power Plant safety rules during shift hours.
 Prepare safety documents duri

公司标识
Operation Engineer
TNB-Liberty Power Plant
Apr 2011 - Dec 2015 | Daharki, Pakistan

TNB-LIBERTY POWER PLANT 235MW CCPP
Organization Location: Mirpur Mathalo, Sindh Pakistan
The TNB Liberty Power Plant is Malaysian owed, combined cycle Power Plant having capacity of 235 MW,
with Dual Fuel Option. But mostly kept in running at Natural Gas. The TNB Liberty Power Complex
comprises of 1 x 145MW gas turbine, The Ansaldo Energia Spa gas turbine (Siemens V-94.2) is a single
shaft, single casing heavy duty gas turbine driving an air –cooled synchronous generator and auxiliary
equipment The TNB Liberty Power Complex comprises of one dual pressure heat recovery boiler (HRSG)
and one steam turbine 1 x 80MW.

RESPONSIBILITIES
Following are the highlights of my work experience in Maintenance department.
Following are the highlights of my working
 Communication with NPCC and RCC and SNGPL
 Prepare the plant availability and demand with coordination of NPCC
 Take over charge of the plant from his counterpart of outgoing shift.
 Supervise the plant during shift hours for safe, efficient and smooth operation taking care of load demand, local procedures / instructions.
 Ensure recording of parameters as per log sheets.
 Monitor recorded parameters from log sheets.
 Analyze plant operating parameters.
 Identify abnormal parameters, predict potential faults and report / propose the remedial action.
 Raise job card.
 Communicate with maintenance and other sections.
 Participate in fault investigation and propose remedial measures.
 Assist Manager in implementation of Power Plant safety rules during shift hours.
 Prepare safety documents during shift hours relevant to his authorization.
 Prepare shift report and other sheets as per shift routine.
 Hand over charge of the plant to his counterpart of incoming shift.
 Follow-up and supervise execution of periodic checks & stand-by change over at the plant.
 Ensure plant integrity by taking round of the plant.
 Assist Principle Engineer in identifying training needs of the shif

公司标识
Assistant Manager
WHR Power Plant Nishat Group
Nov 2009 - Apr 2011 | Dera Ghazi Khan, Pakistan

RESPONSIBILITIES IN WHR, POWER PLANT:
 Preparation of Maintenance and operation reports related to me.
 Installation of steam turbine (Kawasaki Plant system Limited, 60 MW) was done under my supervision and solved all related problems of steam turbine, HRSG condensers and pumps.
 All readings related to steam turbine, labyrinth seal, diaphragms and bearings etc was done under my supervision.
 Responsible for operation training to staff.
 Hydro testing of equipment was done under my supervision.
 Supervision of commissioning of equipment.
 Responsible of safety related to my section.
 Responsible for all mechanical maintenance and overhauling activities of respective Block.
 Provide supervision, leadership, specialist knowledge and expertise to his team for mechanical maintenance and fault finding/trouble shooting.
 Identify, evaluate, plan and assign/execute preventive & corrective maintenance jobs as per OEM recommendations.
 Ensure and maintain good working relations and coordination with operation and other sections.
 Monitor stores stock to ensure availability of minimum quantity of required spare parts.
 Initiate spare parts requisition timely for procurement of spare parts/material.
 Ensure implementation of DGKCC safety Rules by his team.
 Assist Manager Mechanical in Preparation and control of Sectional Budget.

公司标识
Shift Engineer
KAPCO Kot Addu Power Company
Jun 2007 - Nov 2009 | Muzaffargarh, Pakistan

KAPCO KOT ADDU POWER COMPANY 1600MW
History of Organization
KAPCO is a US$ 1 billion company with 10% energy shares and was privatized by Government of Pakistan in 1996.International Power of UK and WAPDA are its two main shareholders. KAPCO is the largest private thermal power generation company in Pakistan with 1600 MW nameplate capacity and multi-fueled combined cycle technology. The plant comprises of 10 Gas turbines, 5 steam turbines, Fuel storage, and Fuel water treatment facilities.
KEY RESPONSIBLITIES IN KAPCO
 These include but are not limited to the following:
 Responsible for all mechanical maintenance and overhauling activities of respective Block.
 Provide supervision, leadership, specialist knowledge and expertise to his team for mechanical maintenance and fault finding/trouble shooting.
 Identify, evaluate, plan and assign / execute preventive & corrective maintenance jobs as per OEM recommendations.
 Ensure timely response of job cards raised to his section.
 Establish and maintain good working relations and coordination with Operation and other sections.
 Monitor stores stock to ensure availability of minimum quantity of required spare parts.
 Initiate spare parts requisition timely for the procurement of spare parts/material.
 Act as Accepter / Issuer as per KAPCO Safety Rules subject to his nomination / authorization.
 Ensure implementation of KAPCO Safety Rules by his team.
 Assist PE Mechanical in preparation and control of Sectional Budget.
 Assist PE Mechanical in preparation of specifications, evaluation of bids, follow up and execution of CAPEX & MRR projects, etc.
 Assist PE Mechanical in appropriate management of resources and cost effective maintenance.
 Train and develop staff to improve their technical knowledge, commercial awareness.
 Implement IMS in his area of responsibilities.
 Perform any other relevant task assigned by his seniors

学历

University of Engineering & Technology Lahore
学士, Bachelors in Engineering, B.Sc Mechanical Engineering‎
B.Sc Mechanical Engineering
所占比重 74%
2007

技能

熟练 Boiler HRSG operation & maintenance
熟练 ERP Implementations
熟练 Gas turbine operation & maintenance
熟练 Power Plant Operation skills
熟练 PTW system
熟练 Steam turbine operation & maintenance
熟练 switch yard 132 KV, 220 KV, AIS & GIS