I want to join a reputed organization in order to provide innovative and quality work at a challenging position to apply and utilize my skills as a great resource for organization and for my professional career.
Work at ACC project (Air cooled condenser), First technology in Pakistan Planned all activities of project like indenting electrical spares Operation & Maintenance of 12 MW Waste Heat Recovery Power Plant Synchronization of generator with WAPDA and Rental power Work in project management in ACC and also coordinate with technical staff Coordinates with Chinese team at ACC project and shutdown of plant Installation and commissioning of new electrical substation for air cooled condenser Responsible for writing reports and preparing SOP and work instructions for electrical Team Summarize all activity and plant status in shift Log book Successful Establishment and Operation of Island Mode operation of Power Plant Substation installation and commissioning. MV/LV Switch Gear Testing and Commissioning & Maintenance. MV/LV switch gear panels drawing understanding and troubleshooting of faults VFD installation, Termination and commissioning Programming of VFD Testing and Commissioning ABB VFD ACS 880 Setting of ACB Parameters Installation Of HT/LT Cables, Cable Tray, Single Line diagram, Schematic Diagram Siprotec Relaying Testing, Commissioning and Calibration including Siprotec 7SD61, 7SJ62, 7UM62, 7VE61 relays. Testing of VCB e.g. contact resistance test, making/Breaking timing test and CT and PT ratio test. Megger Test of MV/LV cables, Transformer and Dielectric test of Transformer oil Cable laying, Earth Pit Testing, Loop Testing, Meggering of Cables & Motors. Inspection of Turbine, generator, LV motors and Transformer
To visit all area according to schedule. Worked in maintenance team for two months Learn about starting techniques of induction motors. Worked on maintaining liquid starters. Worked on operation of Circuit breakers, relays and magnetic contactors. Analyzed electrical network of plant and prepared complete single line diagram of plant. Analyzed comparative performance of MV and LV motors. Know how to isolate and de-isolate MV trolleys. Worked in Raw mill/Cement mill area and worked on maintenance of electrical equipment. Worked in 132 KV Grid Station. MV / LV Switch Gear drawing reading Overhauling of MV Induction Motor (2500KW) Change carbon brushes of Raw Mill(1600kw) and ID Fan (1750kw) To make temperature and vibration reading of critical motors once a week. To indicate abnormal temperatures and vibration to electrical department and assure remedial action by the department.