Looking for challenging opportunities in a growing organization to utilize my skills in order to enhance self-growth.
MV room,LV room shelded cable lying and thambling 50mm to 400mm.
Hand on experience of Injection Molding Machine would be preferableInstall and maintain wiring, control, and lighting systems.
To act as the project team leader controlling all aspects of the MEP/HVAC works including planning, administration, commercial, engineering, documentation and handover to the client. Delegate work to the project team and monitor the progress to completion.
1.Install and maintain wiring, control, and lighting systems.2.Install and repair heating, ventilation, cooling and air quality systems, as well as refrigeration system.3.Maintenance and completion all technical issues relating to Mechanical, Electrical, Plumbing and HVAC.
MV room,LV room shelded cable lying and thambling 50mm to 400mm.
Hand on experience of Injection Molding Machine would be preferableInstall and maintain wiring, control, and lighting systems.
To act as the project team leader controlling all aspects of the MEP/HVAC works including planning, administration, commercial, engineering, documentation and handover to the client. Delegate work to the project team and monitor the progress to completion.
Assembling, evaluating, testing, and maintaining electrical or electronic wiring, equipment, appliances, and apparatus.
Troubleshooting and repairing malfunctioning equipment, appliances, and apparatus.
1. Carry out all electrical work& motor overhauling, electrical installation, maintains& continuous improvement of Electrical system as per standard.
2.Record & report daily activates & progress to immediate supervisor.
3. Give day by day grid performance report.
3.Knowledge &Experience of high voltage electrical safety procedures.
4. All type of safety, health and Environmental activity at site.
5.Repair of control panel (Star Delta, DOL, Rheostat, Autotransformer)
6.Understanding Electrical drawings
7. Install and maintain Lighting system
8. Identify electrical problems with a variety of testing devices
9 Team Management.
10High current installation likes VFD, Control panel, Motor ASD, Transformers, etc.