I am an energetic, self-motivated and enthusiastic graduate who have an ability to use own initiative as part of a team. I possess strong analytical and problem solving skills. In addition, my ability of quick learning and dedication will prove me a profitable asset.
Design/Planning Engineer (C&S)
Review of EPC Design and Construction Supervision of 48MW Jaggran-II Hydropower
`Project, Neelum Valley AJK.
▪ Planning of Programme of Performance/Project Schedule as per contract.
▪ Preparation of weekly and monthly Progress Reports
▪ Review of EPC Design and construction method statements.
▪ Review/Analysis of Contractor claims, change orders and writing reports on same.
▪ Vetting and review of procurement of plants and machinery from abroad.
▪ Review of Shop drawings and bar bending schedules.
▪ Preparation of site execution report and reporting to Project Manager
▪ Review of construction materials and mix designs e.g. (Aggregates, Steel, Cement and
Admixtures)
▪ Preparation of updation of Project physical and financial S-Curve.
▪ Corresponding/addressing various technical/non- technical issues to the client/contractor as per
contract and clauses.
▪ Implementation of the Plan by communicating the plans to the staff working at the site in a clear
manner.
▪ Assisted in preparation of tender/Bidding documents for EPC contract (General, Technical
Specifications and Conditions of Contract).
FEED of TAPI Pipeline Project.
▪ Detailed hydrological study of pipeline.
▪ Planning of initial layout of pipeline.
Assistant Engineer (Hydraulics)
Feasibility Study for Rehabilitation / Upgradation of Main Line – 2 from Kotri to Attock City
of Pakistan Railways
▪ Initial Planning for the detailed study.
▪ Carried out flood mapping and analysis for different flood drains in the project area.
▪ Structural analysis of five bridges including girder, arch and RCC slab bridges.
▪ Preparation of the Hydrological studies report.
Assistant Engineer (Hydraulics)
Feasibility Study for Rehabilitation / Upgradation of Shahdara – Narowal – Sialkot – Wazirabad and Narowal – Chak Amru Section of Pakistan Railways
▪ Initial Planning for the detailed study.
There were two power plants construction going on there of 660 MW each.I did one month internship there as a site engineer