A data enthusiast seeking a data-centric role in a tech-based firm where I get to interact with latest technologies and my appetite for data is catered adequately. Currently working as an data engineer, my well-developed problem solving and analytical approach coupled with my passion for data surely makes me a best fit for any entry level role.
Data Ingestion of transactional data from primary sources as requested (oracle server) to Data Lake using Spark, Sqoop, MySQL and Impala.
Develop mappings on Informatica software for data migration project from Microsoft SSIS on HBL(Konnect).
Perform data validation and testing on developed mappings for identification of error and execute corrective action.
Optimize and design SQL scripts for better batch processing.
Achievements:
Reduce the wastage on net fabric used in scrubber product by 15% saving annually 1.2 million.
Reduce changeover time of cylinder dryer by installing J-scray thus increasing production by 2.5% per day.
Development of Kaizen culture to improve productivity, quality and moral in the whole organization.
Implementation of 5S methodology and introducing internal and external audit culture in the organization.
Reduce carbon footprints by producing less trim wastage during packaging.
Responsibilities:
Developing lean culture in the company by initiating Visual management drive in the company.
Partner with site and functional heads to identify and drive improvement projects in line with customer and business requirements.
Calculate Cost of Poor Quality (CoPQ) and then highlight improvement opportunities during operations.
Designs and implements changes to processes that improve results and reduce cost and eliminate waste.
Develop swim lane flow of different department assigned by the Team lead.
Initiate and conduct Gemba walk in the department.
To develop daily, preventive and predictive maintenance schedule.
▪ Creating standard maintenance procedures for all machines in the plant.
▪ List down the machine components and identify critical element according to maintenance in the mercerizing machine 1.
▪ 5s & Gemba walk to identify the area of improvement on the floor.
▪ To reduce water consumption in pad streamer machine in Dyeing department.
Improved material ordering by exact calculation of pipes length consumptions to reduce wastage and reduce excessive raw material inventory.
Improved cost of different types of tent metal structure by including direct and indirect utilities with cost reduction suggestions.
Updated standard operating procedures (SOPs) & work instruction sheet(WIS).
Developed of Process Identification boards including 4M analysis & basic process flow and machine coding.
Fulfilled of necessary steps for improvement in operations as a “Kaizen” team member
Developed and organizing Sub store in Metal workshop department according to 5S and material issuance system for workers.
Developed preventive maintenance schedule for particular machines with maintenance department team.
During my internship I was assign the task to do Time & Motion study on Chassis Assembly Line
• 3-week Summer internship at General Tires, during my internship period I observed:
Tire curing and manufacturing.
Rubber Treatment for manufacturing.
Procurement & Planning.
Quality control.
Inventory control.
Very motivating and hard working. Accomplish given tasks with in given timeline.
Very hardworking and kind person, works in an efficient ways , I hope you find your dream career.