My name is Irfan Ullah, from Peshawar and completed my Industrial Engineering from UET Peshawar. I've always seen myself as an explorer, looking for new experiences. I worked with different international brands in their manufacturing units of Pakistan i.e Sting Australia, fila, Adidas,Nike etc.
Now i want to work for an organization which provides me the opportunity to improve my skills and knowledge to growth along with the organization objective by utilizing and sharing the educational and interpersonal skills acquired and endeavor for continuous improvement for the organization and self. I am interested in enhancing my leadership qualities and exploring the nature. My hobbies are hunting, scouting, and books reading.
Leading the Quality Department with challenges of Future Goals and Targets and
Respecting Human Element.
Conduct Internal and External Quality Audits/Assessments.
Defined Quality Policy, Axis/Objectives, Indicators, Pareto Analysis and Corrective
action with 5M Analysis.
Implementation of QMS Documents & Its Monitoring through KPIs (Delivery Ratio,
CPM/PPM, and DHU, Blocking Rate.)
Developed MRM’s Minutes, JDs and Evaluate & Optimize Org Charts & Operations
Sequence to generate SOPs.
Defined Internal / External Calibration Method / Procedure according to Ranges &
Tolerances with calibration Record
Corrective / Preventive Maintenance as per SOP and Records of Non-Productive Time
(NTP) with Root Cause.
Stock Management & Supplier Evaluation, Traceability and Non-Conformance
Management.
Control Plan (Incoming (Fabric, RFID, Accessories) Cutting, Mould,
Printing/Embroidery, In-Line, End-Line and F-QC).
Skill Management (Training & Evaluation of Operators, QA, QCs and Office Staff
based on Skill Matrix with backups.
Defining, approving and communicating Internal Quality Standards with Targets,
Tolerance and Parameters to meet in Integral manner with Final Product.
Kept the record of all Data and Documents updated.
Monthly and Yearly Progress/Improvement Report and Presentation.
Organizing Annual Appreciation Awards Ceremony for Production Managers, Hall In
charge, Supervisor, Quality Checker, Mechanics and Operators base on their Working records.
Developed and Lead the Research and development department and manage the
activities of the current development to improve an existing product along with
performing of different tests in quality LAB.
Supervising inspectors, technicians, and other staff members and providing
guidance.
Supervise in the handling of sample evaluation and production approval by reviewing
the measurement, workmanship, fitting, accessories, etc., and giving comments on the production.
Monitored QA/QC performance by gathering relevant production data and producing
statistical reports to be communicated with all related departments.
Time & Motion Study for Calculation of SAM, Efficiency, Productivity, Takt Time, &
Line Balancing for Chain System.
Defining Rate on the basis of Skill Level and SAM of Specific Operation by
comparison with basic salary.
Cost Analysis (In-term of Payback Period, Breakeven, and Worker Incentive
System).
Capacity Planning, Effectiveness & Layout Designing of different Articles for MinMovement & Quick Change Over
Implementation of Lean Manufacturing tools (Kaizen, 5S, Muda, Takt Time, PokaYoke, Heijunka R-Human Element).
Implementation of 5S and conducting weekly 5S Audit (Score Rating) for sustaining
the “5S” Activities
Building the Capacity through Training School for New Workers.
Daily Task completion, its documentation and discussing with HOD/Director
Production
Supervised production workers to identify areas in need of improvement for highquality productions and supervised inventory cycle counting processes, including
accounting and surplus records, product damages and product returns.
Evaluated components and final products against quality standards and
manufacturing specifications and monitored performance and generated reports
detailing quality of product and defect rates.
Inspected raw materials and finished products to verify quality and disposed items
that did not meet safety requiremen