Work closely with production, maintenance, and engineering to establish the optimized performance of all equipment.
Factory acceptance test and execute the simulation process.
Reviewed daily, weekly and monthly data to identify the efficiency of installed equipment and perform Ran trials and quality tests on prototype equipment.
Organized and leaded cross-functional problem-solving teams through root cause identification, verification, and corrective action steps including preventive actions.
Completed 80% of corrective actions.
Recommended changes in control system design to correct detected problems
Maintained records and reports in a concise manner, updated documentation
Responsible for knowing and upholding the H&S Policy and for working in a safe manner and reporting all unsafe or unhealthy conditions or acts.
Addressed customer concerns, issues, or complaints through root cause analysis and implement solutions to prevent a recurrence.
Assemble prototype control system and develop logic.
Develop a PLC program for motors and VFDs associated with the process and redesign the existing control system.
Developed and implemented quality programs, including analyzing, reporting, and problem-solving.
Coordinated with Design, Engineering, and Manufacturing to resolve customer complaints.
Developed work instructions for different tests.
Designing and Implementation of solar projects.
Photovoltaic system design.
Cite assessment, and design software prototype.
Review the costs of structural estimates, interconnection, permitting agreements, production estimates, and assessment of commercial risk factors.