7 years diversified experience in Oil and Gas (MOL PAKISTAN), Fertilizer plant ( Fatima Fertilizer Co), Chemical plant (Olympia Chemical)and petrochemical plant (QAPCO) Maintenance as Mechanical Technician a part of Maintenance technicians team, where I am responsible to make sure all plant machinery and equipment ( Centrifugal pumps, Centrifugal Compressor, Air Compressors, Gear Boxes, Turbo Expander, Steam Turbine, Gas Turbine, Multistage high pressure pumps) run smoothly and to Carry out preventive, corrective and Breakdown checks, and to maintain running repairs inventory.
Working in Qatar petrochemical as a Mechanical technician Rotary Equipment Shutdown job for 3 months.
Working as a Mechanical Rotary Fitter
Check viberation, temperature and sound of all Running Machines.
Overhauling of centrifugal pumps
Maintenance and Troubleshooting of Mechanical seals
Assemble and Disassemble of mechanical seals
Maintenance and inspection of Centrifugal Compressor and complete overhauling
Overhauling of Gearboxes
Allignment with Dial indicator (Rim&Face)
Overhauling of Plate type heat exchanger
Acid cleaning of PHE
Stainer Washing
During working in Fatima Fertilizer Company I have worked on single stage and Multistage centrifugal pumps complete overhauling and Maintenance.
Overhauling of vertical suspended centrifugal pumps and Troubleshooting of mechanical seals.
Bearing inspection and Replacement of complete Train(Tail Gas expender,air compressor,Nox Compressor and Steam Turbine).
Complete overhauling of Axial Flow air compressor (Rotar Replacement,IGVS,Rotar blades, stator blades,bearing and oil beffels replacement during overhauling)
Overhauling of centrifugal compressor 3 stages(Bearing, interstage Lybrenth replacement)
Overhauling and Maintenance of single and Multistage steam Turbines
HGPI of Gas Turbine and 1st stage Nozzle Replacement.
Allignment with Dial indicator Rim and Face.
Mechanical construction of Oil and Gas wellhead,wellhead Compressor Gas transmission pipelines and valve Assembly.
Monitoring of all the activities and documents regarding QA/QC
Fit up and welding inspection of piping and documentation i.e,WPS,PQR,WQT and their Review in accordance with ASME Section 9,API1104,B31.3,B31.8 and project specifications.
Witness NDT Techniques as per code ASME Section 5.Weld Matrix and weld map.
Preparation of test packages and monitoring.preparation of punch list and inspection of punch item after killing.
Inspection of sandblasting and painting
Preparation and submission of QC Dossier as per scope of work.
All Regarding QA/QC Inspection and Documentation of pipe Line and piping.
Material Inspection verify heat No, Grade with MTC.
Hardness Test with Hardness Tester
Inspection of PWHT
Inspection of Hydro Testing.(piping and Pipe Line.perfoam holiday test check coating damage.Lowering and Back Filling inspection of Pipe Line.